FINAL REPORT
DESIGN BRIDGE
Useful Data:
Asphalt weight 1 KN/m2
Handrail weight = 1 KN/ m
fc’ = 𝟐𝟓 𝐌𝐏𝐚, 𝒇𝒚 = 𝟒𝟏𝟎 𝐌𝐏𝐚, ɤ𝐜 = 𝟐𝟓 𝑘𝑁/𝑚3
Live Load = HS 15 L = 10 m
Section A-A
W D S 2 7.25 ×22 KN . m
M D= = =2.9
10 10 m
2. Live load
3.285 S+ 2
M L= P15 for HS15 P=54 KN
32
( 3.28× 2 ) +2 KN . m
M L= ×54 ×0.8=11.556
32 m
3. Impact load
15.24 15.24
I= ≤ 0.3→ =0.38>0.3
S +38.1 2+ 38.1
Use I =0.3
KN . m
M I =I × M L=0.3× 11.556=3.467
m
KN . m
M T =M D + M L + M I =2.9+11.556+3.467=17.923
m
b)Check d req
f s 170 Es 200000
r= = =17∨n= = =8.457
f c 10 E c 4730 √ 25
n 8.457
K= = =0.332
n+ r 8.457 +17
K 0.332
J=1− =1− =0.889
3 3
2M 2× 17.923× 1 06
d req =
√ f c KJb√=
10 ×0.332 ×0.889 ×1000
=110.205 mm
Use ∅ 16
16
d avial =250−25−20− =197 mm>d req ∴ok
2
M 17.923 ×1 06 mm 2
A s= = =601.996
f s J d 170 × 0.889× 197 m
201
Spacing=1000× =333.889 mm
601.996
Use ∅ 16 @ 330 mm c /c ( top∧bottom ) main. reinforced
2.2 A s
A sd= ≤0.67 A s
√3.28 S
2.2× 601.996
=517.088>0.67 ×601.996=403.337
√ 3.28× 2
mm 2
Use A sd =403.337
m
113
Spacing=1000× =280.163
403.337
Use ∅ 12 @280 mm C /C bottom reinforce
Use ∅ 12 @560 mm C /C topreinforce for shrinkage∧temperature
{ 4
b f =min 16 t+b w
Lc1 + Lc 2
2
+b w
11
{
=2.75
4
b f = 16 × 0.25+ 0.3=4.3
2+2
+ 0.3=2.3
2
Use b f =2.3 m
250mm
750 mm
For Span І:
22.3 KN/m
111. 5 KN
2. Live Load
Truck loading → D . F=?
Clear width=7.2 m
∴ D. F=0.66 ×2.3=1.518
HS 15−44(Truck Loading)
6.55 m
∑ F y =71.118−54−54+ D y =0
D y =36.882 KN ↑
Find M
4.45 m 36.882
6.55 m
∑ M d =¿−( 13.5× 8.72 )−( 54 × 4.45 ) −( 54 ×0.18 )+10 C y =0 ¿
C y =36.774 KN ↑
∑ F y =36.774−13.5−54−54+ D y =0
D y =84.726 KN ↑
Find M
54KN
4.45 m 84.726 KN
M T =M D + M L + M I
M T =220.798+250.66+75.198=546.656 KN . m
32
d=1000−40−12− =932 mm
2
6
M 546.656× 10
A s= = =3984.664 m m2
h 250
f s (d− f ) 170 (932− )
2 2
For Span І:
26.425 KN/m
For Span ᴨ:
132 .125 KN