You are on page 1of 1

Client

Main Contractor

NOC TRACK SHEET

Sl No.

NOC Ref.

Current
Rev.

Description

Contact Person

Planned
Submission
Submission
Date
Date

REV 1

REV 0
Return
Date

Doc. No:

Status

Submissio
n Date

Return
Date

REV 2

Status

Submission
Date

Return
Date

Date

5Sep16

Ref.

TR 164

REV 3

Status

Submission Return
Status
Date
Date

Current
Status

Approval
Required
Date

Remarks

NAKHEEL
1.0

R0

2.0

R1

3.0

R0

NOC for Excavation & Allocation of Buried Valve Chamber


NOC for Excavation & Allocation of Buried Valve Chamber
NOC for Excavation & Allocation of Buried Valve Chamber

14Aug16

24Aug16 Approved

14Aug16

18Aug16

29Aug16

NOC for Excavation & Allocation of Buried Valve Chamber

Resubmit 22Aug16

24Aug16 Approved

Awaiting

Approved

For Sub Section C3

Approved

Resubmitted with Updated


Master Plan

Awaiting

For Sub Section C1


For Sub Section C2

4.0

R0

29Aug16

Awaiting

Awaiting

5.0

R0

NOC for Temporary Closure of Road @

30Aug16

Awaiting

Awaiting

6.0

R0

NOC for Temporary Closure of Road @

30Aug16

Awaiting

Awaiting

7.0

R0

NOC for Work at Night and on Fridays

01Sep16

Awaiting

Awaiting

TRAKHEES
1.0

Mobilization NOC

2.0

Mobilization NOC

3.0

General NOC

4.0

General NOC

Trakhees instruction is to
get the existing Chilled
Water Network validated.
Awaiting the necessary
validated
drawings/documents from
Empower/Nakheel and
awaiting for RTA NOC.

RTA ( Drainage & Irrigation Department , RTA ROW Department , Roads & Facilities Maintenance Department , Traffic Department , DEWA , Rail Agency , du , EMPOWER , Etisalat )
NOC for Jumeirah Village Circle
Department

Date

Traffic Department

1.0

DEWA

29-08-2016 New

Drainage and Irrigation Department

30-08-2016 In Process

RTA ROW Department

30-08-2016 In Process

Roads & Facilities Maintenance Department

30-08-2016 In Process

du

04-09-2016 In Process

Etisalat

05-09-2016 In Process

Rail Agency

03-09-2016 In Process

EMPOWER

29-08-2016

NOC for Jumeirah Village Triangle


Department

2.0

29Aug16

Awaiting

Awaiting

01Sep16

Awaiting

Awaiting

Status
29-08-2016 New

Date

Approved
Status

DEWA

01092016

New

du

01092016

New

Drainage and Irrigation Department

01092016

In Process

RTA ROW Department


Roads & Facilities Maintenance Department
Rail Agency
EMPOWER

04092016
01092016
03092016
04092016

In Process
In Process
In Process
Approved

Submit Trial Holes details


verified by DEWA Distribution
Maintenance Engineers along
with crossing details and
method statement.

Drainage approved
Irrigation Department
meeting scheduled on 0609
2016

For
ISLAND TOWER ELECTROMECHANICAL LLC

You might also like