You are on page 1of 2

TESTING & COMMISSIONING MOTOR

Project:

Date:

Contractor:

No.:

Measurement Instrument:
Type:

Serial No.:

Calibration Expiry date :

Name of equipment: MOTOR


Manufacturer:

Equipment code :

Technical spec. (Thng s k thut):

Serial No. :

Capacity:

Type :

Kw

Power supply:
Frequency:

Hz

Vector group :

Location:
Works need to be done before operating equipment:
Foundation:

Good

Earthing sys.:

Pass

Cable connection:

Good

No good

Fail

Fail

Insulation test:
Insulation resistance to earth:
.Coil U1 (U2) - E:

Good

No good

.Coil V1 (V2) - E:

Insulation resistance between coils:

Good

.Coil U1 (U2) -Coil V1 (V2):

.Coil W1 (W2) -Coil U1 (U2):


Shaft of motor:

N.A

.Coil V1 (V2) -Coil W1 (W2):


Good

Testing by Authorized company:


Yes

No

.Coil W1 (W2) - E:

M
No good

No good

Name of testing company


Ref.:
Result:

Date :

Consultant comment:
Witnessed by Owner

Name:
Position:
Date:
Date: Nov. 2005
Rev: 00

Approved by Consultant
Royal HaskoningDHV

Name:
Position:
Date:

Requested by Contractor

Name:
Position:
Date:
Code: TEC-00-23

Date: Nov. 2005


Rev: 00

Code: TEC-00-23