Concrete Formwork Suspended Slab PDF
Concrete Formwork Suspended Slab PDF
For Federal Safety Commissioner (FSC) approved companies or builders who require a high level of Safe Work Method
Statements the attached SWMS is a guide only. As some FSC approved companies may require the use of their own SWMS
temple which is structured at a higher level to what is provided on this SWMS.
Use of Master Builders Generic Safe Work Method Statements
Disclaimer:
Company Address:
ABN:
Company Contact:
Project:
Date:
Project Address:
Specific PPE:
OHS Act 2004 OHS Regulations 2007
Code of Practice for Manual Handling
AS/NZS3012:2010 Electrical Installations on Construction &
Demo Sites
AS/NZS 1892.5 -2000 Portable Ladders Selection use
Emergency planning:
Training
Certificates
Approvals
Permits
Consequence
Likelihood / Probability
Almost certain
Likely
Possible
Unlikely
Rare
Catastrophe
Extreme
Extreme
High
High
Medium
Major
Extreme
High
High
Medium
Low
Moderate
High
High
Medium
Medium
Low
Significant
High
Medium
Medium
Low
Low
Negligible
Medium
Low
Low
Low
Low
Consequence
Risk Matrix
The higher the consequence and the more the likelihood/probability of it occurring, the greater the urgency
required to attend to the removal or minimisation of that hazard.
The first control strategy to be applied is to eliminate risks by :
1.
Eliminating the use of the hazardous activity, plant, tool or substance if practicable. If this is not practicable, risk
should be reduced as far as practicable by one or a combination of:
2.
3.
Isolation of the activity, plant, tool or substance to prevent or reduce exposure to the hazard
4.
5.
When these measures have been applied to the highest extent practicable, any remaining risk should be reduced by
Likelihood
Catastrophe
Almost certain
Major
Likely
Moderate
Possible
Negligible
Rare
Significant
Unlikely
an administrative control. This means adoption of procedures or instructions that minimise exposure to the hazard.
Where an administrative control is used it should be documented in a SWMS.
6.
When risk has been reduced as far as practicable by one or a combination of these measures, any remaining risk may be controlled using PPE. Note that where a National Construction Standard
mandated high risk work activity occurs a specific SWMS must be developed and followed.
Item
Procedure Tasks
Risk
Rating
Inadequate consultation or
failure to provide
appropriate equipment.
Entry to site
General Planning
Residual
Risk
Rating
(When
required)
Who is responsible?
Write the name of the
person responsible
(supervisor or above) to
implement the control
measures identified.
Crushing or jammed
fingers & hands.
Electric shock or
electrocution when cutting
materials.
Stripping Formwork.
I have read and understood and will follow the direction within the content of this SWMS.
I have been consulted in the content of this SWMS.
I agree to review of the SWMS and will follow its direction
Workers name
Signature
Date
Review/Monitoring
Name:
Date:
Sign: