You are on page 1of 4

Average Cost of 30/s Carded (W) for all Units

TOTAL
SPINNING

Unit

# 05

# 06

# 05B

# 03 EJM

# 03 NC

OPS

6.25

6.20

6.00

5.50

5.90

Conversion Cost Rs. Per Spindle

21.35

21.00

20.75

18.52

21.66

Material Cost / Lb

98.26

98.26

98.26

98.26

98.26

98.26

Conversion Cost / Lb

54.66

54.19

55.33

53.88

58.74

55.22

Packing Cost / Lb

1.70

1.70

1.70

1.70

1.70

1.70

Total Cost /Lb

154.62

154.15

155.29

153.84

158.70

155.18

Production Bags

3,038

1,576

2,940

1,026

1,239

9,819

Production Date

upto 13-Feb-14

upto 14-Feb-14

upto 13-Feb-14

upto 09-Feb-14

upto 10-Feb-14

Conversion Cost Rs. Per Spindle based on February-2014 Spindles

Based an Market Based Power Cost of Rs. 7/= per Kw (Including OH Cost)
Average Cost of 30/s Carded (W) for all Units
TOTAL
SPINNING

Unit

# 05

# 06

# 05B

# 03 EJM

# 03 NC

OPS

6.25

6.20

6.00

5.50

5.90

Conversion Cost Rs. Per Spindle

20.35

21.00

20.30

18.12

21.22

Material Cost / Lb

98.26

98.26

98.26

98.26

98.26

98.26

Conversion Cost / Lb

52.10

54.19

54.13

52.71

57.55

53.79

Packing Cost / Lb

1.70

1.70

1.70

1.70

1.70

1.70

Total Cost /Lb

152.06

154.15

154.09

152.67

157.51

153.75

Production Bags

3,038

1,576

2,940

1,026

1,239

9,819

Production Date

upto 13-Feb-14

upto 14-Feb-14

upto 13-Feb-14

upto 09-Feb-14

upto 10-Feb-14

Conversion Cost Rs. Per Spindle based on February-2014 Spindles

Based an Market Based Power Cost of Rs. 7/= per Kw (Including OH Cost)
Average Cost of 30/s Carded (W) for all Units
TOTAL
SPINNING

Unit

# 05

# 06

# 05B

# 03 EJM

# 03 NC

OPS

6.25

6.20

6.00

5.50

5.90

Conversion Cost Rs. Per Spindle

21.35

21.35

20.30

18.12

21.22

Material Cost / Lb

98.26

98.26

98.26

98.26

98.26

98.26

Conversion Cost / Lb

54.66

55.10

54.13

52.71

57.55

54.73

Packing Cost / Lb

1.70

1.70

1.70

1.70

1.70

1.70

Total Cost /Lb

154.62

155.06

154.09

152.67

157.51

154.69

Production Bags

3,038

1,576

2,940

1,026

1,239

9,819

Production Date

upto 13-Feb-14

upto 14-Feb-14

upto 13-Feb-14

upto 09-Feb-14

upto 10-Feb-14

Conversion Cost Rs. Per Spindle based on February-2014 Spindles

Average Cost of 30/s Carded (W) for all Units


TOTAL
SPINNING

Unit

# 05

# 06

# 05B

# 03 EJM

# 03 NC

OPS

6.25

6.20

6.00

5.50

5.90

Conversion Cost Rs. Per Spindle

21.35

21.00

20.30

18.12

21.22

Material Cost / Lb

98.26

98.26

98.26

98.26

98.26

98.26

Conversion Cost / Lb

54.66

54.19

54.13

52.71

57.55

54.59

Packing Cost / Lb

1.70

1.70

1.70

1.70

1.70

1.70

Total Cost /Lb

154.62

154.15

154.09

152.67

157.51

154.55

Production Bags

3,038

1,576

2,940

1,026

1,239

9,819

Production Date

upto 13-Feb-14

upto 14-Feb-14

upto 13-Feb-14

upto 09-Feb-14

upto 10-Feb-14

Conversion Cost Rs. Per Spindle based on February-2014 Spindles