You are on page 1of 100

Load schedule for the date:

Hrs

01.09.2016 (Thursday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

GP

3.6

3.6

3.6

3.6

3.6

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

3.6

3.6

3.6

4.1

4.1

4.1

4.1

4.1

4.1

4.1

4.1

3.93

3.81

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

18.6 18.6 18.6 18.6 18.6

19.1

19.1

19.1 19.1 19.1

19.1

19.1

19.1

18.6

18.6

18.6

19.1

19.1

19.1

19.1

19.1

19.1

19.1

19.1

18.9 18.81

Total

Ganeshpahad: 3.6 - 4.1 MW

As per Approval
Maximum allotted Power
For the Date : 01.09.16

Tandur

LDC Pre-Curtailment MSG.No: 320

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs

24:00:00

Back Down Hrs


Scheduled Export/Day
(AfterBD)

IEX
Prepared by:

Actual Export/Day

451400
455399

Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

3999.089999994

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

02.09.2016 (Friday)
AVG
Load

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00

GP

6.7

6.7

6.7

6.7

6.7

7.2

7.2

7.2

7.7

7.7

7.7

7.7

7.7

10.2

10.2

10.2

10.7

14.4

14.4

14.4

14.4

14.4

14.4

14.4

9.82

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

21.7 21.7 21.7 21.7 21.7

22.2

22.2

22.2 22.7 22.7

22.7

22.7

22.7

25.2

25.2

25.2

25.7

29.4

29.4

29.4

29.4

29.4

29.4

29.4

24.8

Total

Aftr BD
Avg Ld

Ganeshpahad: 6.7 - 14.4 MW

As per Approval
Maximum allotted Power
For the Date : 02.09.16

LDC Pre-Curtailment MSG.No: 07

30% BD (15MW)
From

Tandur

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs

IEX

Scheduled Export/Day
(AfterBD)

15

Prepared by:

Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

02.09.2016 (Friday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

GP

6.7

6.7

6.7

6.7

6.7

7.2

7.2

7.2

7.7

7.7

7.7

7.7

7.7

10.2

10.2

10.2

10.7

14.4

14.4

14.4

14.4

14.4

14.4

14.4

9.82

8.58

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

21.7 21.7 21.7 21.7 21.7

22.2

22.2

22.2 22.7 22.7

22.7

22.7

22.7

25.2

25.2

25.2

25.7

29.4

29.4

29.4

29.4

29.4

29.4

29.4

24.8 23.58

Total

Ganeshpahad: 6.7 - 14.4 MW

As per Approval
Maximum allotted Power
For the Date : 02.09.16

30% BD (15MW)
From

Tandur
IEX

LDC Pre-Curtailment MSG.No: 07

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

205800

Units

Wagon Tippler Auxiliary Consumption :

484

Units

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00

Scheduled Export/Day
(AfterBD)

15

Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

565920

Actual Export/Day

565799

Auxlary consumption(%)

11.90%

Excess/Shortage

-120.8999999971

Prepared by:

ravikiran

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

03.09.2016 (Saturday)
AVG
Load

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

3.33

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

25.9 25.9 25.9 25.9 25.9

26.4

26.4

26.4 31.4 31.4

31.4

31.4

31.4

30.9

30.9

30.9

31.4

31.4

31.4

31.4

31.4

31.4

31.4

31.4

29.6

GP

Total

Aftr BD
Avg Ld

Ganeshpahad: 13.9 - 14.4 MW

As per Approval
Maximum allotted Power
For the Date : 03.09.16

Tandur

5 MW

IEX

15

Prepared by:

krishna

LDC Pre-Curtailment MSG.No: 18

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

03.09.2016 (Saturday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

9.65

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

3.33

3.33

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

25.9 25.9 25.9 25.9 25.9

26.4

26.4

26.4 31.4 31.4

31.4

31.4

31.4

30.9

30.9

30.9

31.4

31.4

31.4

31.4

31.4

31.4

31.4

31.4 29.57 27.98

GP

Total

Ganeshpahad: 13.9 - 14.4 MW

As per Approval
Maximum allotted Power
For the Date : 03.09.16

Tandur

5 MW

IEX

15

Prepared by:

krishna

LDC Pre-Curtailment MSG.No: 18

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

GP Cement Plant Power Consumption:


MSG
NO

Wagon Tippler Auxiliary Consumption :

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

Units

375

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00
Scheduled Export/Day
(AfterBD)

Total Hrs
(30%BD)

Units

231500

671500

Actual Export/Day

663499

Auxlary consumption(%)

12.10%

Excess/Shortage

-8001.0800000001

Prepared by:

ravikiran

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

04.09.2016 (Sunday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 10.82

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

2.32

2.32

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

30.9 30.9 30.9 30.9 30.9

31.4

31.4

31.4 31.4 31.4

26.8

26.8

26.8

26.3

26.3

26.3

26.8

26.8

26.8

26.8

26.8

26.8

26.8

26.8

28.6

28.1

GP

Total

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 04.09.16

Tandur

5 MW

IEX

15

Prepared by:

krishna

LDC Pre-Curtailment MSG.No: 27

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

GP Cement Plant Power Consumption:


MSG
NO

259700

Wagon Tippler Auxiliary Consumption :


Precurtailment Hrs

Units
Units

24:00:00
24:00:00

Back Down Hrs


Scheduled Export/Day
(AfterBD)

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

675380

Actual Export/Day

674365.63

Auxlary consumption(%)

10.96%

Excess/Shortage

1014.37

Prepared by:

sandesh

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

04.09.2016 (Sunday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 10.82

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

2.32

2.32

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

30.9 30.9 30.9 30.9 30.9

31.4

31.4

31.4 31.4 31.4

26.8

26.8

26.8

26.3

26.3

26.3

26.8

26.8

26.8

26.8

26.8

26.8

26.8

26.8

28.6 28.14

GP

Total

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 04.09.16

Tandur

5 MW

IEX

15

Prepared by:

krishna

LDC Pre-Curtailment MSG.No: 27

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption: 259700

Units

Wagon Tippler Auxiliary Consumption :

Units

285

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00

Scheduled Export/Day
(AfterBD)

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

675380 / 28.14

Actual Export/Day

674365 / 28.10

Auxlary consumption(%)

10.96%

Excess/Shortage

1014

Prepared by:

SANDESH

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

05.09.2016 (Monday)
AVG
Load

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

25.9 25.9 25.9 25.9 25.9

26.4

26.4

26.4 26.4 26.4

26.4

26.4

26.4

25.9

25.9

25.9

26.4

26.4

26.4

26.4

26.4

26.4

26.4

26.4

26.2

GP

Total

Aftr BD
Avg Ld

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 05.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 35

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

05.09.2016 (Monday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

15.0

15.0 15.0 15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0 15.00 15.00

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 10.31

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

25.9 25.9 25.9 25.9 25.9

26.4

26.4

26.4 26.4 26.4

26.4

26.4

26.4

25.9

25.9

25.9

26.4

26.4

26.4

26.4

26.4

26.4

26.4

26.4

26.2 25.31

GP

Total

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 05.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 35

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)
0:00:00

24:00:00

Total Hrs
(70%BD)

24:00:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

0:00:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

18.25

25

456.25

4.25

35

148.75

1.50

50

75

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

680

AVg

28.33

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 15.0 15.0 15.0 15.0 15.0

06.09.2016 (Tuesday)

(5- (6:30(7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
6:30)
7)

AVG
Load

15.0

25.0

35.0 35.0 25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0 23.13

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.13

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

24.2 24.2 24.2 24.2 24.2

24.7

34.7

44.7 44.7 34.7

34.7

34.7

34.7

34.2

34.2

34.2

34.7

34.7

34.7

34.7

34.7

34.7

34.7

34.7

32.7

Total

Aftr BD
Avg Ld

Ganeshpahad: 8.8 - 9.3 MW

As per Approval
Maximum allotted Power
For the Date : 06.09.16

Tandur
IEX

5 MW

LDC Pre-Curtailment MSG.No: 45

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

7:00:00

9:00:00

6:30:00

7:00:00

9:00:00

24:00:00

15

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Prepared by:

Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

2:00:00

70% BD (35MW)
0:00:00

6:30:00

Total Hrs
(70%BD)

6:30:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

15:30:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

06.09.2016 (Tuesday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

20.0

35.0 35.0 25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0 23.13 23.13

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.13

8.10

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

24.2 24.2 24.2 24.2 24.2

24.7

29.7

44.7 44.7 34.7

34.7

34.7

34.7

34.2

34.2

34.2

34.7

34.7

34.7

34.7

34.7

34.7

34.7

34.7

32.7 31.63

Total

Ganeshpahad: 8.8 - 9.3 MW

As per Approval
Maximum allotted Power
For the Date : 06.09.16

Tandur
IEX

5 MW

LDC Pre-Curtailment MSG.No: 45

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

7:00:00

9:00:00

6:30:00

7:00:00

9:00:00

24:00:00

15

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Prepared by:

Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

2:00:00

70% BD (35MW)
0:00:00

6:30:00

Total Hrs
(70%BD)

6:30:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

15:30:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

(0-1)

07.09.2016 (Wednesday)

(1- (2.30(5- (6:45(3-4) (4-5)


(7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
2.30) 3)
6:45)
7)

TSPCC 50.0 50.0 35.0 35.0 35.0

AVG
Load

35.0

50.0

50.0 50.0 50.0

50.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0 39.22

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.13

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

59.2 59.2 44.2 44.2 44.2

44.7

59.7

59.7 59.7 59.7

59.7

44.7

44.7

44.2

44.2

44.2

44.7

44.7

44.7

44.7

44.7

44.7

44.7

44.7

48.8

Total

Aftr BD
Avg Ld

Ganeshpahad: 8.8 - 9.3 MW

As per Approval
Maximum allotted Power
For the Date : 07.09.16

Tandur
IEX

5 MW
15

LDC Pre-Curtailment MSG.No: 56

30% BD (15MW)
From

To

2:30:00

6:45:00

11:00:00

24:00:00

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Prepared by:

Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

17:15:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

17:15:00

Total BD Hrs

17:15:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

(0-1)

07.09.2016 (Wednesday)

(1- (2.30(5- (6:45(3-4) (4-5)


(7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
2.30) 3)
6:45)
7)

TSPCC 50.0 50.0 35.0 35.0 35.0

AVG
Load

Aftr BD
Avg Ld

35.0

50.0

50.0 50.0 50.0

50.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0 39.22 39.22

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.13

9.62

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

59.2 59.2 44.2 44.2 44.2

44.7

59.7

59.7 59.7 59.7

59.7

44.7

44.7

44.2

44.2

44.2

44.7

44.7

44.7

44.7

44.7

44.7

44.7

44.7

48.8 49.24

Total

21.20

Ganeshpahad: 8.8 - 9.3 MW

As per Approval
Maximum allotted Power
For the Date : 07.09.16

Tandur
IEX

5 MW
15

LDC Pre-Curtailment MSG.No: 56

30% BD (15MW)
From

To

2:30:00

6:45:00

11:00:00

24:00:00

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption: 230900

Units

Wagon Tippler Auxiliary Consumption :

Units

456

Precurtailment Hrs

17:15:00

Back Down Hrs

17:15:00

Scheduled Export/Day
(AfterBD)

Prepared by:

Total Hrs
(30%BD)

17:15:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

17:15:00

Total BD Hrs

1181760 / 49.24

Actual Export/Day

986898 / 41.12

Auxlary consumption(%)

12.22%

Excess/Shortage

194862 / -8.12

Prepared by:

B.Ramesh

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Actual
Exp

31.28

9.62

0.22

0.00

41.12

Load schedule for the date:

Hrs

(0-1)

08.09.2016 (Thursday)

(1- (2.30(5- (6:45(3-4) (4-5)


(7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
2.30) 3)
6:45)
7)

TSPCC 50.0 50.0 35.0 35.0 35.0

AVG
Load

35.0

50.0

50.0 50.0 50.0

50.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0 39.22

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

9.13

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

61.3 61.3 46.3 46.3 46.3

46.8

61.8

61.8 61.8 61.8

61.8

46.8

46.8

46.3

46.3

46.3

46.8

46.8

46.8

46.8

46.8

46.8

46.8

46.8

48.8

GP

Total

Aftr BD
Avg Ld

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 08.09.16

Tandur

5 MW

IEX

15

Prepared by:

Sandesh

LDC Pre-Curtailment MSG.No: 56

30% BD (15MW)
From

To

2:30:00

6:45:00

11:00:00

24:00:00

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

17:15:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

17:15:00

Total BD Hrs

17:15:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

08.09.2016 (Thursday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 50.0 44.4 38.8 35.0 35.0

35.0

38.8

50.0 50.0 50.0

50.0

30.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0 39.22 38.83

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

9.13

9.80

TND

0.0

0.4

0.4

0.4

0.4

0.4

0.4

0.0

0.0

0.0

0.0

0.0

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

60.9 55.7 50.1 46.3 46.3

46.8

50.6

61.4 61.4 61.4

61.4

41.4

46.8

46.3

46.3

46.3

46.8

46.8

46.8

46.8

46.8

46.8

46.8

46.8

48.8 49.03

GP

Total

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 08.09.16

Tandur

5 MW

IEX

15

Prepared by:

Sandesh

LDC Pre-Curtailment MSG.No: 56

30% BD (15MW)
From

To

2:30:00

6:45:00

11:00:00

24:00:00

BACKDOWN

50% BD (25MW)
From

To

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

17:15:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

17:15:00

Total BD Hrs

17:15:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

09.09.2016 (Friday)

(3-4) (4-5)

(5-6)

(6- (6:4521- (22.15(11- (12:15(23-24)


(8-9) (9-10) (10-11) 12:15) 13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21)
6:45) 8)
22.15 23)

TSPCC 50.0 50.0 35.0 35.0 35.0

25.0

35.0

50.0 50.0 50.0

50.0

50.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0 39.58

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

9.13

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

65.9 65.9 50.9 50.9 50.9

41.4

51.4

66.4 66.4 66.4

66.4

66.4

51.4

50.9

50.9

50.9

51.4

51.4

51.4

51.4

51.4

51.4

51.4

51.4

53.7

Hrs

GP

Total

(0-1)

(12:30)

(2:303)

AVG
Load

Aftr BD
Avg Ld

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 09.09.16

Tandur

5 MW

LDC Pre-Curtailment MSG.No: 66

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

2:30:00

5:00:00

5:00:00

6:00:00

IEX

15

6:00:00

6:45:00

Prepared by:

Sandesh

12:15:00

24:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

15:00:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

1:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

16:00:00

Total BD Hrs

16:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

09.09.2016 (Friday)

(3-4) (4-5)

(5-6)

(6- (6:45(11- (12:15(8-9) (9-10) (10-11) 12:15) 13) (13-14) (14-15)


6:45) 8)

TSPCC 42.5 42.5 38.8 35.0 35.0

25.0

38.8

50.0 50.0 50.0

50.0

42.5

36.9

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

39.58

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

9.13

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

58.4 58.4 54.7 50.9 50.9

41.4

55.2

66.4 66.4 66.4

66.4

58.9

53.3

50.9

50.9

50.9

51.4

51.4

51.4

51.4

51.4

51.4

51.4

51.4

53.7

Hrs

GP

Total

(0-1)

(12:30)

(2:303)

(15-16) (16-17) (17-18) (18-19) (19-20) (20-21)

21- (22.15(23-24)
22.15 23)

AVG
Load

Ganeshpahad: 10.9 - 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 09.09.16

Tandur

5 MW

LDC Pre-Curtailment MSG.No: 66

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

2:30:00

5:00:00

5:00:00

6:00:00

IEX

15

6:00:00

6:45:00

Prepared by:

Sandesh

12:15:00

24:00:00

Total Hrs
(30%BD)

15:00:00

70% BD (35MW)

0:00:00

Total Pre curtailment Hrs

FROM

0:00:00

To

MW

% of
BD

Total Hrs
(50%BD)
100% BD
(50MW)

Total Hrs
(100%BD)

0:00:00

16:00:00

Total BD Hrs

Wagon Tippler Auxiliary Consumption :


Precurtailment Hrs

16:00:00

Back Down Hrs

3:45:00

Scheduled Export/Day
(AfterBD)

1:00:00

0:00:00

MSG
NO

177800

1371
19:45:00

2:30:00

11:00:00 12:15:00

0:00:00

Total Hrs
(70%BD)

HOURS

GP Cement Plant Power Consumption:

3:45:00

1219674.99999999

Actual Export/Day

1209797

Auxlary consumption(%)

11.27%

Excess/Shortage

-9877.5800000001

Prepared by:

RAVIKIRAN

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

1.00

25

25

15.00

35

525

4.25

50

212.5

3.75

42.5

159.375

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

19.75

Err:520 Err:520

50 MW

921.875

AVg

38.41

Aftr BD
Avg Ld

38.41

7.41

5.00

0.00

50.82

Units
Units

Load schedule for the date:

10.09.2016 (Saturday)

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6- (6:30(11- (12:15(8-9) (9-10) (10-11) 12:15) 13) (13-14) (14-15)


6:30) 8)

TSPCC 42.5 42.5 35.0 35.0 35.0

25.0

42.5

50.0 44.4 42.5

42.5

42.5

36.9

35.0

35.0

35.0

35.0

35.0

35.0

35.0

35.0

42.5

36.9

35.0 39.22 37.94

Hrs

(15-16) (16-17) (17-18) (18-19) (19-20) (20-21)

(21- (22:15AVG Aftr BD


(23-24) Load Avg Ld
22:15) 23)

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.13

8.80

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

56.3 56.3 48.8 48.8 48.8

39.3

56.8

64.3 58.7 56.8

56.8

56.8

51.2

48.8

48.8

48.8

49.3

49.3

49.3

49.3

49.3

56.8

51.2

49.3

53.4 51.74

Total

Ganeshpahad: 8.8 - 9.3 MW

As per Approval
Maximum allotted Power
For the Date : 10.09.16

Tandur

5 MW

LDC Pre-Curtailment MSG.No: 74

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

2:00:00

5:00:00

5:00:00

6:00:00

HOURS
FROM

% of
BD

MW

2:00:00 15%

7.5

76

To

MSG
NO

GP Cement Plant Power Consumption:

211100

Units

Wagon Tippler Auxiliary Consumption :

576

Units

Precurtailment Hrs

15:00:00

Back Down Hrs

7:15:00

22:15:00

0:00:00

IEX

15

6:00:00

6:30:00

8:15:00 12:15:00 15%

7.5

82

Prepared by:

sesharao

12:15:00

21:00:00

21:00:00 22:15:00 15%

7.5

89

22:15:00

24:00:00

Total Hrs
(30%BD)

14:00:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

1:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

15:00:00

Total BD Hrs

7:15:00

Scheduled Export/Day
(AfterBD)

1241725

Actual Export/Day

1229764.12

Auxlary consumption(%)

11.00%

Excess/Shortage

-11960.87999999

Prepared by:

ravi

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.00

15

Err:520

1.00

25

25

14.00

35

490

1.75

50

87.5

7.25

42.5

308.125

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

22.25

Err:520 Err:520

50 MW

910.625

AVg

37.94

Load schedule for the date:

Hrs

11.09.2016 (Sunday)
AVG
Load

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 25.0 25.0 25.0 25.0 25.0

25.0

25.0

25.0 25.0 25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0 25.00

GP

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.80

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.4

0.4

0.4

0.4

0.4

0.4

0.4

3.66

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

38.8 38.8 38.8 38.8 38.8

38.8

38.8

38.8 38.8 38.8

38.8

38.8

38.8

38.8

38.8

38.8

38.8

34.2

34.2

34.2

34.2

34.2

34.2

34.2

37.5

Total

Aftr BD
Avg Ld

Ganeshpahad: 8.8 MW

As per Approval
Maximum allotted Power
For the Date : 11.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 86

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

0:00:00

24:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

24:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

11.09.2016 (Sunday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 25.0 25.0 25.0 25.0 25.0

25.0

25.0

25.0 25.0 25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0 25.00 25.00

GP

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.80

8.86

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.4

0.4

0.4

0.4

0.4

0.4

0.4

3.66

3.66

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

38.8 38.8 38.8 38.8 38.8

38.8

38.8

38.8 38.8 38.8

38.8

38.8

38.8

38.8

38.8

38.8

38.8

34.2

34.2

34.2

34.2

34.2

34.2

34.2

37.5

37.5

Total

Ganeshpahad: 8.8 MW

As per Approval
Maximum allotted Power
For the Date : 11.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 86

30% BD (15MW)
From

To

GP Cement Plant Power Consumption: 212600

BACKDOWN

50% BD (25MW)
From

To

0:00:00

24:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

Wagon Tippler Auxiliary Consumption :

Units
Units

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00

Scheduled Export/Day
(AfterBD)

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)
100% BD
(50MW)

0:00:00

Total Hrs
(70%BD)

0:00:00

Total Pre curtailment Hrs

24:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

900400

Actual Export/Day

900598.28

Auxlary consumption(%)

11.65%

Excess/Shortage

198.2800000057

Prepared by:

Sandesh

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

6.50

15

97.5

Err:520

15.50

25

387.5

2.00

35

70

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

555

AVg

23.13

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 15.0 15.0 15.0 15.0 15.0

12.09.2016 (Monday)

(5- (6.15- (6.45(8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
6.15) 6.45)
8)

AVG
Load

15.0

25.0

35.0 35.0 35.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

15.0 23.33

10.8 10.8 10.8 10.8 10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

10.8

10.8

10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3 11.13

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

26.2 26.2 26.2 26.2 26.2

26.7

36.7

46.7 46.7 46.7

36.7

36.7

36.7

36.2

36.2

36.2

36.7

36.7

36.7

36.7

36.7

36.7

36.7

26.7

34.9

GP

Total

Aftr BD
Avg Ld

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 12.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 106

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:45:00

10:00:00

6:15:00

6:45:00

10:00:00

23:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

3:15:00

70% BD (35MW)
0:00:00

6:15:00

23:00:00

24:00:00

Total Hrs
(70%BD)

7:15:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

13:30:00

100% BD
(50MW)

0:00:00

Total Hrs
(100%BD)

0:00:00

0:00:00

24:00:00

Total BD Hrs

24:00:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

7.25

15

108.75

Err:520

13.50

25

337.5

3.25

35

113.75

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

560

AVg

23.33

Load schedule for the date:

Hrs

12.09.2016 (Monday)
AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

25.0

35.0 35.0 35.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

25.0

15.0 23.33 23.33

10.8 10.8 10.8 10.8 10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

10.8

10.8

10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3 11.13

8.70

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

26.2 26.2 26.2 26.2 26.2

26.7

36.7

46.7 46.7 46.7

36.7

36.7

36.7

36.2

36.2

36.2

36.7

36.7

36.7

36.7

36.7

36.7

36.7

26.7

34.9

32.43

GP

Total

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 12.09.16

Tandur

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 106

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:45:00

10:00:00

6:15:00

6:45:00

10:00:00

23:00:00

Total Hrs
(30%BD)

3:15:00

70% BD (35MW)
0:00:00

6:15:00

23:00:00

24:00:00

Total Hrs
(70%BD)

7:15:00

Total Pre curtailment Hrs

Total Hrs
(50%BD)

HOURS
FROM

To

Total Hrs
(100%BD)

0:00:00

24:00:00

MSG
NO

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs

629
24:00:00

24:00:00
Scheduled Export/Day
(AfterBD)

13:30:00

0:00:00

% of
BD

Units

Back Down Hrs

100% BD
(50MW)

0:00:00

MW

GP Cement Plant Power Consumption: 208800

Total BD Hrs

778320 / 32.43

Actual Export/Day

778132 / 32.42

Auxlary consumption(%)

13.06%

Excess/Shortage

188

Prepared by:

S.Krishna

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

7.25

15

108.75

Err:520

13.50

25

337.5

3.25

35

113.75

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

560

AVg

23.33

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 15.0 15.0 15.0 15.0 15.0

13.09.2016 (Tuesday)

(5- (6:15- (6:45- (8:15


(17- (18:15- (19- (20:15
(21-22) (22-23) (23-24)
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) 18:15) 19)
20:15) -21)
6:15) 6:45) 8:15) -9)
15.0

25.0

35.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

25.0

15.0

15.0

15.0

15.0

10.8 10.8 10.8 10.8 10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

10.8

10.8

10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

26.2 26.2 26.2 26.2 26.2

26.7

36.7

46.7

36.7

36.7

26.7

26.7

26.7

26.2

26.2

26.2

26.7

26.7

36.7

36.7

26.7

26.7

26.7

26.7

GP

Total

AVG
Load

Aftr BD
Avg Ld

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 13.09.16

Tandur
IEX

5 MW

LDC Pre-Curtailment MSG.No: 120

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:45:00

8:15:00

6:15:00

6:45:00

8:15:00

10:00:00

18:15:00

20:15:00

15

Prepared by:

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

1:30:00

70% BD (35MW)
0:00:00

6:15:00

10:00:00

18:15:00

20:15:00

24:00:00

Total Hrs
(70%BD)

18:15:00

Total Hrs
(50%BD)

4:15:00

100% BD
(50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

7.25

15

108.75

Err:520

13.50

25

337.5

3.25

35

113.75

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

560

AVg

23.33

Load schedule for the date:

Hrs

13.09.2016 (Tuesday)

(8
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
-9)

AVG
Load

Aftr BD
Avg Ld

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

25.0

35.0

27.5

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

20.9

21.3

17.5

15.0

15.0

15.0 17.80 18.02

10.8 10.8 10.8 10.8 10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

10.8

10.8

10.8

11.3

11.3

8.7

8.7

11.3

11.3

11.3

11.3 10.91 8.66

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

26.2 26.2 26.2 26.2 26.2

26.7

36.7

46.7

39.2

36.7

26.7

26.7

26.7

26.2

26.2

26.2

26.7

26.7

30.0

30.4

29.2

26.7

26.7

26.7

29.1 27.08

GP

Total

30.00

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 13.09.16

Tandur
IEX

5 MW

30.00

16.7

1.6

LDC Pre-Curtailment MSG.No: 120

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:45:00

8:15:00

6:15:00

6:45:00

8:15:00

10:00:00

18:15:00

20:15:00

15

Prepared by:

Total Hrs
(30%BD)

1:30:00

70% BD (35MW)
0:00:00

6:15:00

10:00:00

18:15:00

20:15:00

24:00:00

Total Hrs
(70%BD)

18:15:00

Total Hrs
(50%BD)

HOURS
FROM

To

MSG
NO

207800

Wagon Tippler Auxiliary Consumption :

Units
Units

8736

Precurtailment Hrs

Scheduled Export/Day
(AfterBD)

4:15:00

Total BD Hrs

0:00:00

% of
BD

GP Cement Plant Power Consumption:

24:00:00

Back Down Hrs

100% BD
(50MW)

Total Hrs
(100%BD)

MW

0.4

649920

Actual Export/Day

639799

Auxlary consumption(%)

14.55%

Excess/Shortage

10121

Prepared by:

seshu

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

18.25

15

273.75

Err:520

4.25

25

106.25

1.50

35

52.5

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

432.5

AVg

18.02

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 15.0 15.0 15.0 15.0 15.0

14.09.2016 (Wednesday)

(5- (6:15- (6:45- (8:15


(17- (17:15- (20- (20:15
(21-22) (22-23) (23-24)
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) 17:15) 20)
20:15) -21)
6:15) 6:45) 8:15) -9)

AVG
Load

15.0

25.0

35.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

35.0

25.0

15.0

15.0

15.0

15.0 19.69

10.8 10.8 10.8 10.8 10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

10.8

10.8

10.8

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3 11.13

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

30.8 30.8 30.8 30.8 30.8

31.3

41.3

51.3

41.3

41.3

31.3

31.3

31.3

30.8

30.8

30.8

31.3

41.3

51.3

41.3

31.3

31.3

31.3

31.3

35.8

GP

Total

Aftr BD
Avg Ld

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 14.09.16

Tandur
IEX

5 MW
15

LDC Pre-Curtailment MSG.No: 139

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
To

% of
BD

MSG
NO

Units

Wagon Tippler Auxiliary Consumption :

Units

From

To

From

To

6:45:00

8:15:00

6:15:00

6:45:00

17:15:00

20:00:00

8:15:00

10:00:00

17:00:00

17:15:00

Actual Export/Day

20:00:00

20:15:00

Auxlary consumption(%)

Prepared by:

FROM

MW

GP Cement Plant Power Consumption:

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

4:15:00

70% BD (35MW)
0:00:00

6:15:00

10:00:00

17:00:00

20:15:00

24:00:00

Total Hrs
(70%BD)

17:00:00

Total Hrs
(50%BD)

2:45:00

100% BD
(50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

17.00

15

255

Err:520

2.75

25

68.75

4.25

35

148.75

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

472.5

AVg

19.69

Load schedule for the date:

Hrs

14.09.2016 (Wednesday)

(0-1) (1-2) (2-3) (3-4) (4-5) (5-6) (6-7) (7-8) (8-9) (9-10) (10-11)(11-12)(12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0 15.0 25.0 35.0 27.5 25.0 15.0

AVG
Load

Aftr BD
Avg Ld

15.0

15.0

15.0

15.0

15.0

15.0

32.5

35.0

35.0

17.5

15.0

15.0

15.0 19.69 19.69

14.58

GP

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

11.13 9.59

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

5.00

3.25

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

0.00

29.6 29.6 29.6 29.6 29.6 29.6 39.6 49.6 42.1 39.6

29.6

29.6

29.6

29.6

29.6

29.6

29.6

47.1

49.6

49.6

32.1

29.6

29.6

29.6

35.8 34.28

Total

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 14.09.16

Tandur
IEX

5 MW
15

LDC Pre-Curtailment MSG.No: 139

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
To

% of
BD

MSG
NO

Units

Wagon Tippler Auxiliary Consumption :

Units

From

To

From

To

6:45:00

8:15:00

6:15:00

6:45:00

17:15:00

20:00:00

8:15:00

10:00:00

17:00:00

17:15:00

Actual Export/Day

20:00:00

20:15:00

Auxlary consumption(%)

Prepared by:

FROM

MW

GP Cement Plant Power Consumption: 230200

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

4:15:00

70% BD (35MW)
0:00:00

6:15:00

10:00:00

17:00:00

20:15:00

24:00:00

Total Hrs
(70%BD)

17:00:00

Total Hrs
(50%BD)

2:45:00

100% BD
(50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

24:00:00

9.59

27.42

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

17.00

15

255

Err:520

2.75

25

68.75

4.25

35

148.75

0.00

50

Average

MW

1900to1to5 10

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

472.5

AVg

19.69

Load schedule for the date:

Hrs

14.09.2016 (Wednesday)

(0-1) (1-2) (2-3) (3-4) (4-5) (5-6) (6-7) (7-8) (8-9) (9-10) (10-11)(11-12)(12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

TSPCC 15.0 15.0 15.0 15.0 15.0 15.0 19.0 19.0 19.0 19.0 15.0

AVG
Load

Aftr BD
Avg Ld

15.0

15.0

15.0

15.0

15.0

15.0

19.0

19.0

19.0

17.5

15.0

15.0

15.0 19.69 19.69

16.30

GP

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

11.13 9.59

TND

5.0

5.0

5.0

5.0

5.0

5.0

0.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.0

0.0

0.0

0.0

5.0

5.0

5.0

5.00

5.00

1.53

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

0.00

29.6 29.6 29.6 29.6 29.6 29.6 28.6 28.6 28.6 28.6

29.6

29.6

29.6

29.6

29.6

29.6

29.6

28.6

28.6

28.6

27.1

29.6

29.6

29.6

35.8 34.28

Total

Ganeshpahad: 10.8 to 11.3 MW

As per Approval
Maximum allotted Power
For the Date : 14.09.16

Tandur
IEX

5 MW
15

LDC Pre-Curtailment MSG.No: 139

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
To

% of
BD

MSG
NO

Units

Wagon Tippler Auxiliary Consumption :

Units

From

To

From

To

6:45:00

8:15:00

6:15:00

6:45:00

17:15:00

20:00:00

8:15:00

10:00:00

17:00:00

17:15:00

Actual Export/Day

20:00:00

20:15:00

Auxlary consumption(%)

Prepared by:

FROM

MW

GP Cement Plant Power Consumption: 230200

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

4:15:00

70% BD (35MW)
0:00:00

6:15:00

10:00:00

17:00:00

20:15:00

24:00:00

Total Hrs
(70%BD)

17:00:00

Total Hrs
(50%BD)

2:45:00

100% BD
(50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

24:00:00

9.59

27.42

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

17.00

15

255

Err:520

2.75

25

68.75

4.25

35

148.75

0.00

50

Average

MW

1900to1to5 10

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

472.5

AVg

19.69

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

(5- (6:15(7-8)
6:15)
7)

15.09.2016 (Thursday)

(8
(1819:15- (20:15 (21:30(22-23) (23-24)
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) 19:15)
20
-21:30) 22)
-9)

AVG
Load

0.0

0.0

0.0

0.0

0.0

15.0

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

25.0

15.0

15.0

0.0

0.0

0.0

11.72

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

11.13

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

13.8 13.8 13.8 13.8 13.8

14.3

29.3

39.3

39.3

39.3

29.3

29.3

29.3

28.8

28.8

28.8

29.3

39.3

39.3

29.3

29.3

14.3

14.3

14.3

27.8

Total

Aftr BD
Avg Ld

Ganeshpahad: 11.8 to 12.3 MW

As per Approval
Maximum allotted Power
For the Date : 15.09.16

Tandur
IEX

5 MW

LDC Pre-Curtailment MSG.No: 156

30% BD (15MW)
From

To

15

BACKDOWN

50% BD (25MW)
From

To

7:00:00

10:00:00

17:00:00

19:15:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Prepared by:

Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)

5:15:00

100% BD
(50MW)

6:15:00

7:00:00

0:00:00

6:15:00

10:00:00

17:00:00

21:30:00

24:00:00

19:15:00

21:30:00

Total Hrs
(70%BD)

10:00:00

Total Hrs
(100%BD)

8:45:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

17.00

15

255

Err:520

5.25

10

52.5

4.25

35

148.75

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

26.5

Err:520 Err:520

50 MW

456.25

AVg

19.01

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

(5-6)

15.09.2016 (Thursday)

(8
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
-9)

(6-7) (7-8)

AVG
Load

Aftr BD
Avg Ld

0.0

0.0

0.0

0.0

0.0

11.3

21.0

21.0

21.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

23.0

22.0

16.8

15.0

7.5

0.0

0.0

11.72 10.98

GP

8.8

8.8

8.8

8.8

8.8

9.3

9.3

9.3

9.3

9.3

9.3

9.3

9.3

8.8

8.8

8.8

9.3

7.3

7.9

9.3

9.3

9.3

9.3

9.3

8.35

8.35

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

0.0

0.0

3.8

5.0

5.0

5.0

5.0

5.00

3.96

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

13.8 13.8 13.8 13.8 13.8

14.3

25.6

30.3

30.3

30.3

29.3

29.3

29.3

28.8

28.8

28.8

29.3

30.3

29.9

29.8

29.3

21.8

14.3

14.3 25.07 23.29

Total

Ganeshpahad: 11.8 to 12.3 MW

As per Approval
Maximum allotted Power
For the Date : 15.09.16

Tandur
IEX

5 MW

LDC Pre-Curtailment MSG.No: 156

30% BD (15MW)
From

To

15

BACKDOWN

50% BD (25MW)
From

To

7:00:00

10:00:00

17:00:00

19:15:00

HOURS
FROM

To

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)

5:15:00

100% BD
(50MW)

6:15:00

7:00:00

0:00:00

6:15:00

10:00:00

17:00:00

21:30:00

24:00:00

19:15:00

21:30:00

Total Hrs
(70%BD)

10:00:00

Total Hrs
(100%BD)

8:45:00

% of
BD

MSG
NO

Units

Wagon Tippler Auxiliary Consumption :

Units

Total BD Hrs

495

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00
Scheduled Export/Day
(AfterBD)

Prepared by:

Total Hrs
(30%BD)

MW

GP Cement Plant Power Consumption: 200400

601680 / 25.07

Actual Export/Day

559066 / 23.29

Auxlary consumption(%)

11.82%

Excess/Shortage

42614 / 1.78

Prepared by:

B.Ramesh

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

10.00

15

150

Err:520

5.25

25

131.25

0.00

35

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

281.25

AVg

11.72

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

15.0

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

25.0

25.0

15.0

0.0

0.0

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

TND

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.0

3.0

3.0

14.4 14.4 14.4 14.4 14.4

14.9

26.9

36.9

36.9

36.9

26.9

26.9

26.9

26.4

26.4

26.4

26.9

36.9

36.9

36.9

26.9

14.9

14.9

14.9

Total

0.0

0.0

(8
(20 (21:30(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) 19-20 -21:30) 22) (22-23) (23-24)
-9)

0.0

GP

0.0

(5- (6:15- (6:306:15) 6:30) 8)

16.09.2016 (Friday)
AVG
Load

Aftr BD
Avg Ld

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 16.09.16

Tandur

5 MW

IEX

15

Prepared by:

sesharao

LDC Pre-Curtailment MSG.No: 170

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

6:30:00

10:00:00

17:00:00

20:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)

6:30:00

100% BD
(50MW)

6:15:00

6:30:00

0:00:00

6:15:00

10:00:00

17:00:00

21:30:00

24:00:00

20:00:00

21:30:00

Total Hrs
(70%BD)

8:45:00

Total Hrs
(100%BD)

8:45:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

8.75

15

131.25

Err:520

6.50

25

162.5

0.00

35

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

293.75

AVg

12.24

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

AVG
Load

Aftr BD
Avg Ld

0.0

16.3

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

25.0

25.0

15.0

7.5

0.0

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 8.98

TND

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.50

0.50

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

1.5

3.0

3.0

1.09

1.09

14.4 14.4 14.4 14.4 14.4

14.9

28.9

36.9

36.9

36.9

26.9

26.9

26.9

26.4

26.4

26.4

26.9

36.9

36.9

36.9

26.9

20.9

14.9

14.9

25.1 22.81

Total

0.0

(8
(20 (21:30(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) 19-20 -21:30) 22) (22-23) (23-24)
-9)

0.0

GP

0.0

(5- (6:15- (6:306:15) 6:30) 8)

16.09.2016 (Friday)

12.24 12.24

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 16.09.16

Tandur

5 MW

IEX

15

Prepared by:

sesharao

LDC Pre-Curtailment MSG.No: 170

30% BD (15MW)
From

To

BACKDOWN

50% BD (25MW)
From

To

6:30:00

10:00:00

17:00:00

20:00:00

HOURS
FROM

To

MW

% of
BD

GP Cement Plant Power Consumption:


MSG
NO

Units

215500

Wagon Tippler Auxiliary Consumption :

Units

602

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00

Total Hrs
(30%BD)

0:00:00

70% BD (35MW)

Total Hrs
(50%BD)

Scheduled Export/Day
(AfterBD)

6:30:00

100% BD
(50MW)

6:15:00

6:30:00

0:00:00

6:15:00

10:00:00

17:00:00

21:30:00

24:00:00

20:00:00

21:30:00

Total Hrs
(70%BD)

8:45:00

Total Hrs
(100%BD)

8:45:00

Total BD Hrs

547500

Actual Export/Day

507499.27

Auxlary consumption(%)

13.20%

Excess/Shortage

-40000.73

Prepared by:

ravi

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

8.75

15

131.25

Err:520

6.50

25

162.5

0.00

35

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

293.75

AVg

12.24

actual
AVG

10.72

8.98

0.36

1.09

21.15

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

(21
-22)

(22- (22.15AVG Aftr BD


(23-24) Load Avg Ld
22.15) 23)

0.0

15.0

25.0

25.0

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

25.0

35.0

25.0

25.0

15.0

0.0

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.0

3.0

1.00

14.3 14.3 14.3 14.3 14.3

14.8

26.8

36.8

36.8

36.8

36.8

36.8

26.8

26.3

26.3

26.3

26.8

36.8

46.8

36.8

36.8

26.8

14.8

14.8 28.05

Total

0.0

(8
(17- (17.15- 19.45(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) 17.15) 19.45)
21
-9)

0.0

GP

0.0

(5- (6:15- (6:306:15) 6:30) 8)

17.09.2016 (Saturday)

15.42

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 17.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 189

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

17:15:00

19:45:00

6:30:00

12:00:00

IEX

15

17:00:00

17:15:00

Prepared by:

sesharao

19:45:00

22:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

2:30:00

70% BD (35MW)

Total Hrs
(50%BD)

8:00:00

100% BD
(50MW)

6:15:00

6:30:00

0:00:00

6:15:00

12:00:00

17:00:00

22:15:00

24:00:00

22:00:00

22:15:00

Total Hrs
(70%BD)

5:30:00

Total Hrs
(100%BD)

8:00:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

8.75

15

131.25

Err:520

6.50

25

162.5

0.00

35

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

293.75

AVg

12.24

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

(20
AVG Aftr BD
(21-22) (22-23) (23-24) Load Avg Ld
-21)

0.0

16.3

25.0

25.0

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

32.5

35.0

32.5

25.0

25.0

3.8

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 9.88

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.40

0.40

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.8

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

2.3

3.0

1.00

1.00

14.3 14.3 14.3 14.3 14.3

14.8

28.8

36.8

36.8

36.8

36.8

36.8

26.8

26.3

26.3

26.3

26.8

44.3

46.8

44.3

36.8

36.8

17.8

14.8 28.05 26.70

Total

0.0

(8
(17- (17.15- 19.45(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) 17.15) 19.45)
21
-9)

0.0

GP

0.0

(5- (6:15- (6:306:15) 6:30) 8)

17.09.2016 (Saturday)

15.42 15.42

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 17.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 189

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

17:15:00

19:45:00

6:30:00

12:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

237100

Units

Wagon Tippler Auxiliary Consumption :

3160

Units

Precurtailment Hrs

24:00:00

Back Down Hrs

24:00:00

IEX

15

17:00:00

17:15:00

Prepared by:

sesharao

19:45:00

22:00:00

Total Hrs
(30%BD)

2:30:00

70% BD (35MW)

Total Hrs
(50%BD)

Scheduled Export/Day
(AfterBD)

8:00:00

100% BD
(50MW)

6:15:00

6:30:00

0:00:00

6:15:00

12:00:00

17:00:00

22:15:00

24:00:00

22:00:00

22:15:00

Total Hrs
(70%BD)

5:30:00

Total Hrs
(100%BD)

8:00:00

Total BD Hrs

640700

Actual Export/Day

549099

Auxlary consumption(%)

12.48%

Excess/Shortage

-91600.78

Prepared by:

ravi

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

5.50

15

82.5

Err:520

8.00

25

200

2.50

35

87.5

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

16

Err:520 Err:520

50 MW

370

AVg

15.42

Actual

11.77

9.88

0.23

1.00

22.88

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

(8
(18(15- (16:3019.15(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) 16:30) 17) (17-18) 19:15)
21
-9)

(21
-22)

(22- (22.15AVG Aftr BD


(23-24) Load Avg Ld
22.15) 23)

0.0

15.0

25.0

25.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

25.0

25.0

35.0

25.0

25.0

25.0

25.0

25.0 16.88

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

0.4

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

3.08

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.75

14.3 14.3 14.3 14.3 14.3

14.8

26.8

36.8

36.8

36.8

41.4

31.4

31.4

30.9

30.9

30.9

41.4

41.4

51.4

41.4

41.4

41.4

41.4

41.4 31.94

Total

0.0

(6- (6:156:15) 8)

0.0

GP

0.0

(5-6)

18.09.2016 (Sunday)

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 18.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 201

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

18:00:00

19:15:00

6:15:00

11:00:00

IEX

15

16:30:00

18:00:00

Prepared by:

sesharao

19:15:00

24:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

1:15:00

70% BD (35MW)
6:00:00

6:15:00

11:00:00

16:30:00

Total Hrs
(70%BD)

5:45:00

Total Hrs
(50%BD)

11:00:00

100% BD (50MW)

0:00:00

Total Hrs
(100%BD)

6:00:00

6:00:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

8.75

15

131.25

Err:520

6.50

25

162.5

0.00

35

0.00

50

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

293.75

AVg

12.24

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5) (5-6)

TSPCC 0.0

0.0

(20
AVG
(21-22) (22-23) (23-24) Load
-21)

Aftr BD
Avg Ld

0.0

18.8

20.0

20.0

19.0

19.0

15.0

15.0

15.0

15.0

15.0

17.5

21.0

22.0

23.0

15.0

15.0

15.0

15.0 13.14 15.21

10.9 10.9 10.9 10.9 10.9

11.4

9.8

9.6

9.7

10.3

10.2

10.1

10.0

9.8

8.9

8.9

8.9

8.9

7.9

6.7

6.7

6.7

6.7

6.6

9.26

9.04

TND

0.4

0.4

0.4

0.4

0.4

0.4

0.0

0.0

0.0

0.0

0.0

4.0

4.0

4.0

5.0

5.0

3.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

1.98

3.08

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.75

0.75

14.3 14.3 14.3 14.3 14.3

14.8

28.5

29.6

29.7

29.3

29.2

29.1

29.0

28.8

28.9

28.9

29.4

29.9

29.9

29.7

26.7

26.7

26.7

26.6 25.12 28.08

Total

0.0

(8
(9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) 19-20
-9)

(6-7) (7-8)

0.0

GP

0.0

18.09.2016 (Sunday)

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 18.09.16

Tandur

upto 21-09-16

5 MW

21.4
LDC Pre-Curtailment MSG.No: 201

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

18:00:00

19:15:00

6:15:00

11:00:00

IEX

15

16:30:00

18:00:00

Prepared by:

sesharao

19:15:00

24:00:00

Total Hrs
(30%BD)

1:15:00

70% BD (35MW)
6:00:00

6:15:00

11:00:00

16:30:00

Total Hrs
(70%BD)

5:45:00

Total Hrs
(50%BD)

HOURS
FROM

To

Total Hrs
(100%BD)

6:00:00

MSG
NO

Wagon Tippler Auxiliary Consumption :


Precurtailment Hrs

Units
24:00:00

24:00:00
Scheduled Export/Day
(AfterBD)

11:00:00

6:00:00

% of
BD

Units

217000

Back Down Hrs

100% BD (50MW)

0:00:00

MW

GP Cement Plant Power Consumption:

Total BD Hrs

674000

Actual Export/Day

576999.1

Auxlary consumption(%)

12.81%

Excess/Shortage

97000.9

Prepared by:

Sandesh

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

8.75

15

131.25

Err:520

6.50

25

162.5

0.00

35

0.00

50

Average

MW

1900to1to5 10

Total

4.5

Err:520

149.625

15.25

Err:520 Err:520

50 MW

293.75

AVg

12.24

ACT
EXP

12.27

9.04

1.98

0.75

24.04

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

(10- (11:30
(16- (17:30(19- (19:15
(12-13) (13-14) (14-15) (15-16) 17:30) 18) (18-19) 19:15) -20) (20-22) (22-23) (23-24)
11:30) -12)

AVG
Load

0.0

15.0

25.0

35.0

25.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

35.0

25.0

15.0

15.0

0.0

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

15.9 15.9 15.9 15.9 15.9

16.4

31.4

41.4

51.4

41.4

41.4

31.4

31.4

30.9

30.9

30.9

31.4

41.4

51.4

41.4

31.4

31.4

16.4

16.4 30.08

Total

0.0

(6- (6:15- (7- (8:15


6:15) 7) 8:15) -10)

0.0

GP

0.0

(5-6)

19.09.2016 (Monday)
Aftr BD
Avg Ld

13.85

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 18.09.16

Tandur

upto 21-09-16

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 221

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

From

To

From

To

7:00:00

8:15:00

6:15:00

7:00:00

18:00:00

19:00:00

8:15:00

11:30:00

17:30:00

18:00:00

Actual Export/Day

19:00:00

19:15:00

Auxlary consumption(%)

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

2:15:00

70% BD (35MW)

Total Hrs
(50%BD)

4:45:00

100% BD (50MW)

6:00:00

6:15:00

0:00:00

6:00:00

11:30:00

17:30:00

22:00:00

24:00:00

19:15:00

22:00:00

Total Hrs
(70%BD)

9:00:00

Total Hrs
(100%BD)

8:00:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

9.00

15

135

Err:520

4.75

25

118.75

2.25

35

78.75

8.00

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

332.5

AVg

13.85

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

(9
-10)

(1011)

(11
(12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
-12)

AVG
Load

Aftr BD
Avg Ld

0.0

22.5

35.0

27.5

25.0

25.0

20.0

15.0

15.0

15.0

15.0

15.0

20.0

35.0

17.5

15.0

15.0

0.0

0.0

10.9 10.9 10.9 10.9 10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

10.9

10.9

10.9

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4 11.23 6.47

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.00

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

15.9 15.9 15.9 15.9 15.9

16.4

38.9

51.4

43.9

41.4

41.4

36.4

31.4

30.9

30.9

30.9

31.4

36.4

51.4

33.9

31.4

31.4

16.4

16.4 30.08 25.32

Total

0.0

(6-7) (7-8) (8-9)

0.0

GP

0.0

(5-6)

19.09.2016 (Monday)

13.85 13.85

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 18.09.16

Tandur

upto 21-09-16

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 221

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

From

To

From

To

7:00:00

8:15:00

6:15:00

7:00:00

18:00:00

19:00:00

8:15:00

11:30:00

17:30:00

18:00:00

Actual Export/Day

19:00:00

19:15:00

Auxlary consumption(%)

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

2:15:00

70% BD (35MW)

Total Hrs
(50%BD)

4:45:00

100% BD (50MW)

6:00:00

6:15:00

0:00:00

6:00:00

11:30:00

17:30:00

22:00:00

24:00:00

19:15:00

22:00:00

Total Hrs
(70%BD)

9:00:00

Total Hrs
(100%BD)

8:00:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

9.00

15

135

Err:520

4.75

25

118.75

2.25

35

78.75

8.00

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

332.5

AVg

13.85

Actual
Avg Ld

12.81

6.47

3.69

0.00

22.97

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

(5-6)

19.09.2016 (Monday)

(6-7) (7-8) (8-9) (9-10) (10-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)

AVG
Load

0.0

0.0

0.0

0.0

0.0

22.5

24.0

24.0

24.5

25.0

20.0

15.0

15.0

15.0

15.0

15.0

20.0

25.0

17.5

15.0

15.0

0.0

0.0

13.85

GP

6.3

6.3

6.3

6.3

6.3

6.3

6.5

6.5

6.7

6.6

6.3

6.8

7.2

5.9

6.4

6.4

6.6

6.4

6.6

7.2

7.0

5.5

5.5

5.6

11.23

TND

5.0

5.0

5.0

5.0

5.0

5.0

1.0

0.0

0.0

0.0

0.0

2.5

5.0

5.0

5.0

5.0

5.0

5.0

0.0

5.0

5.0

5.0

5.0

5.0

3.69

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

11.3 11.3 11.3 11.3

11.3

11.3

30.0

30.5

30.7

31.1

31.3

29.3

27.2

25.9

26.4

26.4

26.6

31.4

31.6

29.7

27.0

25.5

10.5

10.6 28.77

Total

Ganeshpahad: 10.9 to 11.4 MW

As per Approval
Maximum allotted Power
For the Date : 18.09.16

Tandur

upto 21-09-16

5 MW

IEX

15

Prepared by:

Ramesh

LDC Pre-Curtailment MSG.No: 221

30% BD (15MW)

BACKDOWN

50% BD (25MW)

HOURS
FROM

To

MW

% of
BD

GP Cement Plant Power Consumption:


MSG
NO

Wagon Tippler Auxiliary Consumption :

From

To

From

To

7:00:00

8:15:00

6:15:00

7:00:00

18:00:00

19:00:00

8:15:00

11:30:00

17:30:00

18:00:00

Actual Export/Day

19:00:00

19:15:00

Auxlary consumption(%)

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

Excess/Shortage
Prepared by:
Total Hrs
(30%BD)

2:15:00

70% BD (35MW)

Total Hrs (50%BD)

4:45:00

100% BD (50MW)

6:00:00

6:15:00

0:00:00

6:00:00

11:30:00

17:30:00

22:00:00

24:00:00

19:15:00

22:00:00

Total Hrs
(70%BD)

9:00:00

Total Hrs
(100%BD)

8:00:00

Total BD Hrs

24:00:00

24:00:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

9.00

15

135

Err:520

4.75

25

118.75

2.25

35

78.75

8.00

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

332.5

AVg

13.85

Aftr BD Actual
Avg Ld Avg Ld

13.85 12.81

6.47

6.47

3.69

3.69

0.00

0.00

24.01 22.97

Units
Units

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 15.0 15.0 15.0 15.0 15.0

20.09.2016 (Tuesday)

(5- (6:15- (6:30- (7- (8:15 (8.456:15) 6:30) 7) 8:15) -8:45)


9)

(9
(16- (17:30(19- (19:15
(12-13) (13-14) (14-15) (15-16) 17:30) 18) (18-19) 19:15) -20) (20-22) (22-23) (23-24)
-12)

15.0

25.0

35.0

50.0

35.0

25.0

15.0

15.0

15.0

15.0

15.0

15.0

25.0

35.0

25.0

15.0

15.0

15.0

15.0

GP

5.7

5.7

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

25.7 25.7 25.7 25.7 25.7

26.2

36.2

46.2

61.2

46.2

36.2

26.2

26.2

25.7

25.7

25.7

26.2

36.2

46.2

36.2

26.2

26.2

26.2

26.2

Total

AVG
Load

Aftr BD
Avg Ld

Ganeshpahad: 5.7 to 6.2 MW

As per Approval
Maximum allotted Power
For the Date : 20.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 236

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:30:00

7:00:00

6:15:00

6:30:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

IEX

15

8:15:00

8:45:00

8:45:00

9:00:00

Prepared by:

Ramesh

18:00:00

19:00:00

17:30:00

18:00:00

Actual Export/Day

19:00:00

19:15:00

Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

2:00:00

70% BD (35MW)
0:00:00

6:15:00

9:00:00

17:30:00

19:15:00

24:00:00

Total Hrs
(70%BD)

19:30:00

Total Hrs
(50%BD)

1:15:00

100% BD (50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

22:45:00

22:45:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

9.00

15

135

Err:520

4.75

25

118.75

2.25

35

78.75

8.00

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

332.5

AVg

13.85

Load schedule for the date:

20.09.2016 (Tuesday)

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6-7) (7-8) (8-9) (9-10) (10-11)

(11
(12-13) (13-14) (14-15) (15-16) (16-17) (17-18) (18-19) (19-20) (20-21) (21-22) (22-23) (23-24)
-12)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

27.5

50.0

36.3

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

20.0

35.0

17.5

15.0

15.0

15.0

15.0 19.01 19.01

Hrs

AVG
Load

Aftr BD
Avg Ld

GP

5.7

5.7

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.03

4.28

TND

5.0

5.0

5.0

5.0

5.0

5.0

0.0

0.0

0.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

3.7

0.0

5.0

5.0

5.0

5.0

5.0

5.00

5.00

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

0.00

25.7 25.7 25.7 25.7 25.7

26.2

33.7

56.2

42.5

26.2

26.2

26.2

26.2

25.7

25.7

25.7

26.2

29.9

41.2

28.7

26.2

26.2

26.2

26.2 30.04 28.29

Total

Ganeshpahad: 5.7 to 6.2 MW

As per Approval
Maximum allotted Power
For the Date : 20.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 236

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:30:00

7:00:00

6:15:00

6:30:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs

22:45:00

Back Down Hrs

22:45:00

Scheduled Export/Day
(AfterBD)

IEX

15

8:15:00

8:45:00

8:45:00

9:00:00

Prepared by:

Ramesh

18:00:00

19:00:00

17:30:00

18:00:00

Actual Export/Day

609565

19:00:00

19:15:00

Auxlary consumption(%)

11.71%

Excess/Shortage

-69405

Prepared by:

seshu

Total Hrs
(30%BD)

2:00:00

70% BD (35MW)
0:00:00

6:15:00

9:00:00

17:30:00

19:15:00

24:00:00

Total Hrs
(70%BD)

19:30:00

Total Hrs
(50%BD)

1:15:00

100% BD (50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

678970

22:45:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

9.00

15

135

Err:520

4.75

25

118.75

2.25

35

78.75

8.00

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

332.5

AVg

13.85

Actual
Avg Ld

17.01

4.28

4.11

0.00

25.40

Load schedule for the date:

21.09.2016 (Wednesday)

(0-1) (1-2) (2-3) (3-4) (4-5)

(5-6)

(6- (6:30- (6:45(11- (12:30- (12:45(22- (22:30(16- (17:15- (17:30- (17:45- (19- (19:30(9-10) (10-11) 12:30) 12:45) 14) (14-16) 17:15) 17:30) 17:45) 19) 19:30) 21) (21-22) 22:30) 24)
6:30) 6:45) 9)

TSPCC 15.0 15.0 15.0 15.0 15.0

15.0

25.0

35.0

50.0

50.0

35.0

35.0

25.0

15.0

15.0

15.0

25.0

35.0

50.0

35.0

25.0

35.0

25.0

15.0 26.56

Hrs

AVG
Load

GP

5.7

5.7

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

5.7

5.7

5.7

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.2

6.03

TND

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

5.0

3.7

3.7

3.7

3.7

3.7

3.7

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

0.5

2.99

IEX

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

25.7 25.7 25.7 25.7 25.7

26.2

36.2

46.2

61.2

59.9

44.9

44.9

34.9

24.4

24.4

21.2

31.7

41.7

56.7

41.7

31.7

41.7

31.7

21.7 35.58

Total

Aftr BD
Avg Ld

Ganeshpahad: 5.7 to 6.2 MW

As per Approval
Maximum allotted Power
For the Date : 21.09.16

Tandur

upto 21-09-16

5 MW

LDC Pre-Curtailment MSG.No: 243

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:30:00

6:45:00

6:00:00

6:30:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)

IEX

15

10:00:00

12:30:00

12:30:00

12:45:00

Prepared by:

Ravikiran

17:30:00

17:45:00

17:15:00

17:30:00

Actual Export/Day

19:00:00

19:30:00

19:30:00

21:00:00

Auxlary consumption(%)

21:00:00

22:00:00

22:00:00

22:30:00

Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

4:30:00

70% BD (35MW)
0:00:00

6:00:00

12:45:00

17:15:00

22:30:00

24:00:00

Total Hrs
(70%BD)

12:00:00

Total Hrs
(50%BD)

3:00:00

100% BD (50MW)
Total BD Hrs

Total Hrs
(100%BD)

0:00:00

19:30:00

19:30:00

Total Pre curtailment Hrs


Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

12.00

15

180

Err:520

3.00

25

75

4.50

35

157.5

4.50

50

225

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

637.5

AVg

26.56

Load schedule for the date:

Hrs

(0-1) (1-2) (2-3) (3-4) (4-5)

TSPCC 0.0

0.0

AVG
Load

0.0

15.0

25.0

35.0

50.0

50.0

50.0

50.0

50.0

50.0

50.0

50.0

50.0

50.0

35.0

35.0

25.0

15.0

0.0

10.0 10.0 10.0 10.0 10.0

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.0

10.0

10.0

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5 10.33

TND

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.00

IEX

3.0

3.0

3.0

3.0

3.0

3.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

3.0

0.00

13.0 13.0 13.0 13.0 13.0

13.5

25.5

35.5

45.5

60.5

60.5

60.5

60.5

60.0

60.0

60.0

60.5

60.5

60.5

45.5

45.5

35.5

25.5

13.5 41.27

Total

0.0

(6- (6:15- (6:30- (6:45(18- (19:15- (20- (21:30- (22- (22:30(8-11) (11-12) (12-13) (13-14) (14-15) (15-16) (16-17) (17-18) 19:15) 20) 21:30) 22) 22:30) 24)
6:15) 6:30) 6:45) 8)

0.0

GP

0.0

(5-6)

18.11.2016 (Friday)
Aftr BD
Avg Ld

30.94

Ganeshpahad: 10.5to 10 MW

As per Approval
Maximum allotted Power
For the Date : 18.11.16

Tandur
IEX

15

Prepared by:

Ravi kiran

LDC Pre-Curtailment MSG.No: 230

30% BD (15MW)

BACKDOWN

50% BD (25MW)

From

To

From

To

6:30:00

6:45:00

6:15:00

6:30:00

19:15:00

21:30:00

21:30:00

22:00:00

HOURS
FROM

To

MW

% of
BD

MSG
NO

GP Cement Plant Power Consumption:

Units

Wagon Tippler Auxiliary Consumption :

Units

Precurtailment Hrs
Back Down Hrs
Scheduled Export/Day
(AfterBD)
Actual Export/Day
Auxlary consumption(%)
Excess/Shortage
Prepared by:

Total Hrs
(30%BD)

2:30:00

70% BD (35MW)

Total Hrs
(50%BD)

0:45:00

100% BD (50MW)

6:00:00

6:15:00

0:00:00

6:00:00

22:00:00

22:30:00

22:30:00

24:00:00

Total Hrs
(70%BD)

0:45:00

Total Pre curtailment Hrs

Total Hrs
(100%BD)

7:30:00

11:30:00

Total BD Hrs

11:30:00

Average

Hrs

MW

Total
Err:520

21:15:00

31.5

149.625

10:00:00

22.5

168.75

31:15:00

Hrs

Time
(Hrs)

MW

Total

0.75

15

11.25

Err:520

0.75

25

18.75

2.50

35

87.5

12.50

50

625

Average

MW

1900to1to5 1

Total

4.5

Err:520

149.625

24

Err:520 Err:520

50 MW

742.5

AVg

30.94