Kunduzgi smenada qilingan ishlar (shift #4)
 Unit 10 da Kislorod nasoslarda bosim yuqolib qoldi. Syngas rasxodi kamayib
keldi va 130-FSLL-1049 orqali Unit 30 Standby rejimiga o’tdi.
 130-KV-1038 dan Badpv kelib qolib sequence dan chiqib ketdi. Klapan
purjinasi to’g’irlanib Sequence ga qo’yildi.
 130-VH-003 A hopper spargerlari perexod qilindi.
 130-XF-044 A/D filter online qilindi.
 130-XP-010 ga 6 qop perlit yuklandi;
 Unit 30 Train#1 FQI lar stop qilindi.
 Unit 35 Tail gas systemasi stop qilindi. Qolgani ishlab turibdi.

PRODUCT NAME DATE (WITHIN 12H) DATE (HOURLY) UNITS


FT WAX TO UNIT 83 (130-FQI-0015) 326,86 27,24 TONS
HC CONDENSATE TO U35 Fr. 1st Train (130-FQI-1023) 300,82 25,07 TONS
REACTION WATER TO U40 Fr. 1st Train (130-FQI-1024) 1113,97 92,83 M3
MPS EXPORT TO U72 Fr. 1st Train (130-FQI-1021) 2680672,00 223389,33 TONS
HC CONDENSATE TO U35 Fr. 2nd Train (130-FQI-2023) 0,00 0,00 TONS
REACTION WATER TO U40 Fr. 2nd Train (130-FQI-2024) 0,00 0,00 M3
MPS EXPORT TOU72 Fr. 2nd Train (130-FQI-2021) 0,00 0,00 TONS
STRIPPED HC CONDENSATE TO U50 (135-FQI-0077A) 721,80 60,15 M3
TAIL GAS TO U78 (135-FY-0102A) 209200,67 17433,39 NM3
REACTION WATER EXPORT TO U77 (140-FQI-0005) 1378,31 114,86 M3
1 ATR LOAD (START/END/AVERAGE) 84,1 46,8 79,3 %
2 ATR LOAD (START/END/AVERAGE) 0,0 0,6 0,1 %
DAY

1 FT Temp. (START/END/AVERAGE) 229,3 229,5 229,5 °C


2 FT Temp. (START/END/AVERAGE) 177,0 177,0 177,0 °C
Start Date: 15.10.23y Step 1 (POS1-9 Dp 2,5) 58,9 Day
Start Date: 11.02.24y Step 2 (POS10-18 Dp 2,5) 16,5 Day
Step 3 (POS1-18 Dp 2,5) Day
TRAIN 1 FILTERS WORKING DAY Step 4 (POS19-28 Dp 2,5) Day
Step 5 (POS1-28 Dp 2,5) Day
Step 6 (POS1-28 Dp 4) Day
Total 75,4 Day
Start Date: 24.11.2022 Step 1 (POS1-9 Dp 2,5) 48 Day
Start Date: 24.04.2023 Step 2 (POS10-18 Dp 2,5) 37 Day
Start Date: 01.06.2023 Step 3 (POS1-18 Dp 2,5) 44 Day
TRAIN 2 FILTERS WORKING DAY Start Date: 26.07.2023 Step 4 (POS19-28 Dp 2,5) 24 Day
Start Date: 19.08.2023 Step 5 (POS1-28 Dp 2,5) 66 Day
Step 6 (POS1-28 Dp 4) Day
Total 219 Day
TRAIN 1 LOADED CATALYST #52 - 7213,48 kg LATEST LOAD: 24.02.2024 437,7 TONS
TRAIN 2 LOADED CATALYST #38 - 7058,17 kg LATEST LOAD: 02.11.2023 429,7 TONS

Ochilgan naryadlar: Yo’q;


Yopilgan naryadlar: Yo’q.