Professional Documents
Culture Documents
Insp & Test Recds For Outgoing units-LV Switchgear PDF
Insp & Test Recds For Outgoing units-LV Switchgear PDF
page 1 of 2
Client:
Subcontractor:
Project No.:
Project Name:
Substation No.:
Additional information:
Manufacturer:
P.O. No.:
Function
Location:
Rating
Switchboard No:
Panel No.:
Reference Document:
Items to inspect
Subcontractor
inspected
initials/date
Company
Hold
Point
Remarks
inspected*
initials/date
Note: Tests marked (C) are required for precommissioning inspection only
1.0
1.1
Circuit labelling
1.2
Mechanical damage
1.3
Door interlock
1.4
1.5
1.6
1.7
1.8
Signature:
Date:
Signature:
Date:
Signature:
Date:
C:\RB_Forms\RB26E14.DOT\
www.red-bag.com
Record No.:
page 2 of 2
Client:
Subcontractor:
Project No.:
Project Name:
Substation No.:
Additional information:
Manufacturer:
P.O. No.:
Function
Location:
Rating
Switchboard No:
Panel No.:
Reference Document:
Items to inspect
Subcontractor
inspected
initials/date
2.0
Company
Hold
Point
Remarks
inspected*
initials/date
Earthing
Check the condition of the earthing bar and
connections test earthing bar continuity
.......................... Micro Ohm
3.0
4.0
5.0
Class ...............
Rating
...............
Condition ...............
6.0
Signature:
Date:
Signature:
Date:
Signature:
Date:
C:\RB_Forms\RB26E14.DOT\
www.red-bag.com