You are on page 1of 1

KEY PLAN:

LEGEND:

14

CL

25

34
MECCA

U
N

COLUMN / WALL CONTINUATION

P1.0 P2.0
-

P3.0

P4.0

43

COLUMN / WALL PLANTED


L

29

30

COLUMN / WALL TERMINATION

SLAB CUTOUT

CL

T1.0 T2.0

T3.0

T4.0

T5.0

CL

9000
1

29

30

S 210 0

29

30

S 210 0

31

32

NOTE:

S 210 0

CL

14

25

34

43

PARTICULAR NOTES:

FOR RAMP SLOPE & LEVELS


REFER TO ARCH'L. DRAWINGS.
9000

9000

9000

9000

RB2

C3

C3

C21

C 600 x 600

600 x 1620
(UPSTAND)
RAMP BEAM

C21

C 600 x 600

C21

C9

C 600 x 600

RB5

C 600 x 600

RB

3 00
RB 10 AM

6
RA 00
M x1
P 00
BE 0
AM

x E
0 B
60 MP
RA

9200

C 600 x 600

C 600 x 600

B 600 x 1000

RB1

600 x 1000
RAMP BEAM

RB1

600 x 1000
RAMP BEAM

DRAIN CHANNEL REFER TO MEP DWG

RB

RB5
600 x 800
RAMP BEAM

RB4

RB5

RB4

RB5

600 x 1000
RAMP BEAM

600 x 800
RAMP BEAM

6
RA 00
M x1
P 00
BE 0
AM

C23

B 600 x 800
RAMP BEAM

320mm RAMP SLAB


THICKNESS

RAMP FROM GROUND


FLOOR TO PROMENADE

RB2

600 x 1620
(UPSTAND)
RAMP BEAM

600 x 800
RAMP BEAM

RB2

PC1

C 600 x 600

RB1

C1

320mm RAMP SLAB


THICKNESS

600 x 1500
RAMP TRANSFER BEAM

RB1**

320mm RAMP SLAB


THICKNESS

RAMP FROM PROMENADE


TO GROUND FLOOR

RB2

600 x 1620
(UPSTAND)
RAMP BEAM

9200

RB1

B 600 x 1000
RAMP BEAM

320mm RAMP SLAB


THICKNESS

RAMP FROM BASEMENT-1


TO PROMENADE

RB2

B 600 x 1620
(UPSTAND)
RAMP BEAM

9200

N
RB5

C2*
C 600 x 600

PC1

O
RB5

C2*
C 600 x 600

C1*

W 300

9200

W1

C 600 x 600

RB2

C 600 x 600

C1*

RB5

RAMP FROM PROMENADE


TO BASEMENT-1

600 x 800
RAMP BEAM

RB1*

600 x 1000
RAMP BEAM

9200

2
RB

20 )
16 D
x N M
0 TA EA
60 PS P B
(U M
RA

20 )
16 D
x N M
0 TA EA
60 PS P B
(U M
RA

2
RB

RB

6
( 0
RA UP 0 x
M STA 162
P
BE ND 0
AM )

RB1*

COLUMNS & WALL


STOPPING @
RAMP LEVEL
600 x 1000
RAMP BEAM

600 x 1000
RAMP BEAM

RB1*

9200

RB1*

B 600 x 1000
RAMP BEAM

RB2

B 600 x 1620
(UPSTAND)
RAMP BEAM

600 x 1000
RAMP BEAM

COLUMNS & WALL STOPPING @ RAMP LEVEL

9200

1. THIS DRAWING IS THE PROPERTY OF KLING CONSULT AND MUST NOT BE RETAINED, COPIED OR USED WITHOUT
THE CONSULTANT'S AUTHORITY.
2. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS AND SPECIFICATIONS OF THE
SAME AND OTHER DISCIPLINES.
3. THIS DRAWING IS NOT TO BE SCALED. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. ANY DISCREPANCY MUST
BE ADVISED TO THE ARCHITECT AND THE ENGINEER.
4. ALL DIMENSIONS ARE METRIC UNLESS OTHERWISE INDICATED.
5. THE WALLS ARE DIMENSIONED TO THE UNFINISHED FACE OF MASONRY OR CONCRETE UNLESS OTHERWISE NOTED.
6. FINAL COORDINATION IS THE RESPONSIBILITY OF THE CONTRACTOR. ANY DISCREPANCY MUST BE BROUGHT TO THE
ATTENTION OF THE ARCHITECT AND THE ENGINEER AND MUST BE RESOLVED BEFORE COMMENCEMENT OF WORK.
7. ALL LEVEL ANNOTATIONS ARE RELATED TO ARCHITECTURAL LEVEL, UNLESS NOTED AS QNHD

600 x 800
RAMP BEAM

600 x 800
RAMP BEAM

RB1**

B
S 210 0

LEVEL +9.40 M (QNHD) = +/- 0.00 M (ARCHITECTURAL)

600 x 1000
RAMP BEAM

C 600 x 600

C 700 x 700

RB2

W 400

RB5

C22

C 700 x 700

600 x 1620
(UPSTAND)
RAMP BEAM

C2

C22

RB1

RB1

RB2

9200

W2

600 x 1500
RAMP TRANSFER BEAM

RB5
B 600 x 800
RAMP BEAM

B
S 210 0

RB

600 x 1000
RAMP BEAM

RB1

600 x 1620
(UPSTAND)
RAMP BEAM

x E
0 B
60 MP
RA

B 600 x 1000
RAMP BEAM

RB2

9200

B 600 x 1620
(UPSTAND)
RAMP BEAM

6
B AMP
R

C 700 x 700

6
RA 00
M x1
P 00
BE 0
AM

600 x 1620
(UPSTAND)
RAMP BEAM

3 00
RB 10 AM

600 x 1000
RAMP BEAM

B3 000

C20

600 x 800
RAMP BEAM

C22

B 600 x 1000

9200

R00 x 1BEAM

C 600 x 600

RB1*

RB5
B 600 x 800
RAMP BEAM

C2

600 x 800
RAMP BEAM

B 600 x 800
RAMP BEAM

600 x 1000
RAMP BEAM

600 x 1620
(UPSTAND)
RAMP BEAM

600 x 1000
RAMP BEAM

RB1*

RB5

RB2

RB4

C20

B 600 x 1000
RAMP BEAM

S 210 0

DRAIN CHANNEL REFER TO MEP DWG

9200

RB4

C20

600 x 1000
RAMP BEAM

RB1*

B 600 x 1000
RAMP BEAM

9200

6 S B
B UP P
( M
A
R

20 )
16 D
x N M
0 TA EA
60 PS P B
(U M
RA

6
( 0
RA UP 0 x
M STA 162
P
BE ND 0
AM )

RB
2

2
RB

21620 )
B
R00 x TANDEAM

DRAIN CHANNEL REFER TO MEP DWG

M
C24

B 800 x 600

M
C26

C24

C 600 x 600

C19

RB2

C1
C 600 x 600

600 x 1620
(UPSTAND)
RAMP BEAM

RB2

600 x 1620
(UPSTAND)
RAMP BEAM

L
PROJECT NO.

29

30

S 210 0

29

30

S 210 0

31

32

29

A
S 210 0

30

STAGE

8900-09

BUILDING NO.

DISCIPLINE

S.-SUB.NO.

SHEET NO.

REV. NO.

500 6

CO

SERIAL NO.

PROJECT

1 098-Ramp Up from B01

s 210

1 : 100

099-Ramp from PROMENADE to B01


2 / from PROMENADE TO GF

s 210

1 : 100

3 100-Ramp from GF to PROMENADE

s 210

1 : 100

CLIENT

PROJECT
MANAGEMENT

300

LEAD
CONSULTANT

1300
(VER. ARCH'L.)

C26

098-B3

C 600 x 600

ARCHITECT
STRUCTURAL
DESIGN

ARCHITECT
OF RECORD

STAGE

CONSTRUCTION DESIGN

TITLE

P4.0 - REINFORCEMENT MISCELLANEOUS


RAMP

FORMAT

DATE

DRAWN

21.06.16
PROJECT NO.

8900-09

CHECKED

NDC
STAGE

CO

BUILDING NO.

RAH
DISCIPLINE

SERIAL NO.

SCALE

PLOT NO. / AREA

As indicated

Marina-hotel 001 /
Lusail

S.-SUB.NO.

500 6

SHEET NO.

REV. NO.

You might also like