You are on page 1of 1

TYPICAL ROADWAY SECTIONS

SCALE

COMPUTATION OF PCCP AREAS AND VOLUME


LENGTH OF PROJECT

1 : 50

M.

CUT SECTION

3,280. m

NEW CONSTRUCTION

MAIN ROAD (ROAD TO BEACH)


A = Length x Width
A = 1409.74 x 6.10
A = 8,599.414 m

WIDENING
AREA WIDENING TOTAL = 731.51 m

MAIN ROAD (ROAD TO BEACH)


V = Area x Thickness
V = 8,599.414 x 0.23
V = 1,977.86 m

WIDENING
V = Area x Thickness
V = 731.51 x 0.23
V = 168.24 m

MAIN ROAD (ROAD TO BOARDWALK)


A = Length x Width
A = 2,000 x 6.10
A = 12,200.00 m

WIDENING
AREA WIDENING TOTAL = 571.22 m

MAIN ROAD (ROAD TO BOARDWALK)


V = Area x Thickness
V = 12,200.00 x 0.23
V = 2,806.00 m

WIDENING
V = Area x Thickness
V = 571.22 x 0.23
V = 131.38 m

1.00

1.50

3.05

3.05

1.50

ITEM 506- SLOPE PROTECTION


0.3
0

PROVIDE 75 mm PVC PIPE

3.00 %

FOR WEEPHOLES AT 1.50 m.

INTERVAL STAGGERED
1

ARRANGEMENT BOTH

HORIZONTALLY & VERTICALLY


W/ 2.00% SLOPE

0.30 m THK. ITEM 506 GROUTED RIPRAP

0.60

0.20 m.THK. ITEM 200 - AGGREGATE SUB BASE COURSE


0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE
ITEM 102 - COMMON SURPLUS EXCAVATION

WELL-GRADED GRAVEL WITH


LARGER ONES PLACED ADJACENT
TO WEEPHOLES AS SHOWN

0.40

TOTAL VOLUME OF PCCP


= 8,599.414 m

WIDENING (ROAD TO BEACH)

MAIN ROAD (ROAD TO BOARDWALK)


WIDENING (ROAD TO BOARDWALK)

731.51 m

= 12,200.00 m

TOTAL CONCRETE AREA =

571.22 m

MAIN ROAD (ROAD TO BEACH)

WIDENING (ROAD TO BEACH)

MAIN ROAD (ROAD TO BOARDWALK)


WIDENING (ROAD TO BOARDWALK)

EARTH DITCH (LINE DITCH)

2,806.00 m
131.38 m

(TO BE USED AT STEEPCUT SECTION)


3

1.50

1.00

FILL SECTION

NET CONCRETE VOLUME

22,102.14

1,977.86 m
168.24 m

5,083.48 m

1.50

3.05

0.10

TOTAL AREA OF PCCP


MAIN ROAD (ROAD TO BEACH)

3.05

1.50

NOTE:
ITEM 102, ITEM 103, ITEM 104(2), ITEM 200, ITEM 505(5)
SEE QUANTITY SHEETS.

0.33 m.THK. ITEM 200 - AGGREGATE SUB BASE COURSE


0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE
0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
VARIABLE THICKNESS ITEM 104 - EMBANKMENT (SELECTED BORROW)

0.20 m.THK. ITEM 200 - AGGREGATE SUB BASE COURSE


0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE

SUPER ELEVATED SECTION


1.50

3.05+"W"

3.05

1.50

FILL SECTION
1.50

ITEM 506- STONE MASONRY

3.05

3.05

1.50

0.45

0.20 m.THK. ITEM 200 - AGGREGATE SUB BASE COURSE


0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE
ITEM 506 - GROUTED RIPRAP

0.60

0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

0.20 m.THK. ITEM 200 - AGGREGATE SUB BASE COURSE


0.23 m.THK. ITEM 311 - PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)
910 mm dia. RCPC ITEM 500 (1) PIPE CULVERT
VARIABLE THICKNESS ITEM 104 - EMBANKMENT (SELECTED BORROW)

VARIABLE THICKNESS ITEM 104 - EMBANKMENT (SELECTED BORROW)


0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE

0.10 m.THK. ITEM 300 - AGGREGATE SURFACE COURSE


ITEM 506 - STONE MASONRY
ITEM 506 - STONE MASONRY
SURVEYED

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS

REGION VII

BOHOL II DISTRICT ENGINEERING OFFICE

UBAY

BOHOL

CONCRETING OF TALIBON MUNICIPAL


CIRCUMFERENTIAL ROAD
TALIBON, BOHOL

TALIBON

BOHOL

TYPICAL ROADWAY SECTIONS,


DRAINAGE CROSS SECTION, EARTH &
LINED DITCH DETAIL, SLOPE
PROTECTION DETAIL,

CHECKED

SUBMITTED

ARCHIE B. DAPAR

SIMPLICIA G. AGUIMAN

JUNIBE C. FROILAN

ENGINEER II

ENGINEER II

OIC-ASST. DISTRICT ENGINEER

REVIEWED

RECOMMENDING APPROVAL

SHEET NO.

APPROVED

DESIGNED

ROLANDO T. CERICOS

JOHN RICAFORD I. CRISTAL

MARIO M. MONTEJO DM, MNSA

ENGINEER II

ENGINEER II

OIC-ASST. DISTRICT ENGINEER

NONATO M. PAYLADO

JUBY B. CORDON CSO

ADOR G. CANLAS, CESO IV

OIC -PLANNING & DESIGN DIVISION

ASSISTANT REGIONAL DIRECTOR

REGIONAL DIRECTOR

04
18