FOOTING

Summation of All of the Above Cost


-----------------------------------------------------------------------------| Item
|
Quantity | Material
Cost | Placement
Cost |
-----------------------------------------------------------------------------| Concrete
|
2.0 m^3 | RM 150.0
RM
304 | RM 250.0
RM
506 |
| LeanConcrete |
0.2 m^3 | RM 15.0
RM
3 |
|
| LeanConcrete |
4.1 m^2 |
| RM 25.0
RM
101 |
| Formwork
|
18.0 m^2 | RM 25.0
RM
450 | RM 30.0
RM
540 |
| Steel T12
|
277.4 kg | RM 1.20
RM
333 | RM 1.90
RM
527 |
| Excavation
|
8.1 m^3 |
| RM 15.0
RM
122 |
-----------------------------------------------------------------------------|
SUMMATION OF ABOVE
|
RM 1090 |
RM 1796 |
------------------------------------------------------------------------------

COLUMN

Summation of All of the Above Cost


-----------------------------------------------------------------------------| Item
|
Quantity | Material
Cost | Placement
Cost |
-----------------------------------------------------------------------------| Concrete
|
2.2 m^3 | RM 150.0
RM
327 | RM 250.0
RM
544 |
| FlatFormwork |
48.8 m^2 | RM 25.0
RM 1221 | RM 30.0
RM 1465 |
| CircularForm |
0.0 m^2 | RM 25.0
RM
0 | RM 30.0
RM
0 |
| Main Bar T12 |
262.0 kg | RM 1.20
RM
314 | RM 1.90
RM
498 |
| Link Bar R 6 |
70.7 kg | RM 1.10
RM
78 | RM 1.80
RM
127 |
-----------------------------------------------------------------------------|
SUMMATION OF ABOVE
|
RM 1940 |
RM 2635 |

BEAM 1B

Total Beam Concrete for 1B Floor Plan:

-------------------------------------------------------| Grade
| Volume,m3 |
Raw Cost | Placement Cost |
-------------------------------------------------------|
G25
|
7.16362 | RM
1074.5 | RM
1790.9 |
-------------------------------------------------------Net Side formwork =
=
=

Gross - Beam-slab interface area


95.515 0.000
95.515

Total Beam Formwork 1B for Floor Plan:


-------------------------------------------------------| Location | Area,m2 |
Raw Cost | Placement Cost |
-------------------------------------------------------| Bottom |
20.468 | RM
511.7 | RM
614.0 |

-------------------------------------------------------| Side
|
95.515 | RM
2387.9 | RM
2865.5 |
-------------------------------------------------------Beam Main Steel Bar for 1B Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
12
|
526.0 | RM
631.1 | RM
999.3 |
-------------------------------------------------------| Total
|
525.9 | RM
631.1 | RM
999.3 |
-------------------------------------------------------Beam Link Steel Bar for 1B Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
10
|
344.7 | RM
379.2 | RM
620.5 |
-------------------------------------------------------| Total
|
344.7 | RM
379.2 | RM
620.5 |

BEAM GB

Total Beam Concrete for GB Floor Plan:

-------------------------------------------------------| Grade
| Volume,m3 |
Raw Cost | Placement Cost |
-------------------------------------------------------|
G25
|
8.40356 | RM
1260.5 | RM
2100.9 |
-------------------------------------------------------Net Side formwork =
=
=

Gross - Beam-slab interface area


112.047 30.720
81.327

Total Beam Formwork for GB Floor Plan:


-------------------------------------------------------| Location | Area,m2 |
Raw Cost | Placement Cost |

-------------------------------------------------------| Bottom |
20.468 | RM
511.7 | RM
614.0 |
-------------------------------------------------------| Side
|
81.327 | RM
2033.2 | RM
2439.8 |
-------------------------------------------------------Beam Main Steel Bar for GB Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
12
|
417.5 | RM
500.9 | RM
793.2 |
|
16
|
197.3 | RM
236.7 | RM
374.8 |
|
20
|
73.0 | RM
87.6 | RM
138.6 |
|
25
|
35.6 | RM
42.7 | RM
67.6 |
-------------------------------------------------------| Total
|
723.3 | RM
868.0 | RM
1374.3 |
-------------------------------------------------------Beam Link Steel Bar for GB Floor Plan:
-------------------------------------------------------| Diameter | Weight,kg |
Raw Cost | Placement Cost |
-------------------------------------------------------|
10
|
349.0 | RM
383.9 | RM
628.2 |
-------------------------------------------------------| Total
|
349.0 | RM
383.9 | RM
628.2 |
--------------------------------------------------------

SLAB GB

Summation of All of the Above Cost


-----------------------------------------------------------------------------| Item
|
Quantity | Material
Cost | Placement
Cost |
-----------------------------------------------------------------------------| Concrete
|
16.5 m^3 | RM 150.0
RM 2476 | RM 250.0
RM 4127 |
| Formwork
|
110.1 m^2 | RM 20.0
RM 2201 | RM 30.0
RM 3302 |
| Bot Bar T10 |
715.4 kg | RM 1.20
RM
858 | RM 1.90
RM 1359 |
-----------------------------------------------------------------------------|
SUMMATION OF ABOVE
|
RM 6394 |
RM 10147 |