Responsible for the implementation of the quality control system related
electrical works according with project specification and Engineering standards as per project QA/QC Plan. Verify the equipments and devices used in the project requirements and meet the specification as per project requirements, standards tested in accordance with the procedures. Report to the QA/QC Manager and project manager on day to day basis as per project QA/QC Plan. Monitoring the QC Inspectors inspections and documentation work. Coordinate with client representatives regarding the implementation and quality of works. Initiating internal NCRS for all non conformances in project when ever required as per schedule-Q. Verify all inspection report and test records are systematically generated and compiled to the approved QC procedures. Preparation of inspection and test plan for installation and pre commissioning. Preparation of inspection check list in accordance with ITP and project specification. To conduct the inspection of completed works (Request for Inspection). Preparation of energisation procedure as per project specification. Inspections Material receiving inspection for cable trays,cable drums,electrical panels,motors,Transformers, Cables(MV/LV/Control/Heat Tracing),equipments, wielding receptables and all types of JBS. Inspection installation of Transformers,Motors, switch gears,DB panels,JB Installation, wielding receptables. Inspection installation of grounding and Lighting protection installation and Testings. Inspection installation of cable laying, Glanding and Termination works. Inspection of monitoring the motors,Transformers installations ,testings and pre commissioning works. Inspection of monitoring the Batteries installations,Testings and pre commissioning works.