You are on page 1of 2

Equipment No.

(Tag)

Heat Exchanger Data Sheet

(PROCEED)

E-001

Descript. (Func.)
Sheet No.

Operating Data

1
2

SIZE
SHELLS PER UNIT

38.234m2

Shell & TUbe

TYPE

SURFACE PER UNIT

No. Of UNITS

HORIZONTAL CONNECTED IN (parallel or series)

SURFACE PER SHELL

5
6
7

Performance of one Unit


SHELL SIDE
FLUID CIRCULATING

TUBE SIDE

Steam

Nitrobenzene

10

TOTAL FLUID ENTERING


IN

OUT

IN

OUT

11

VAPOUR

12

LIQUID

13

STEAM

14

WATER

15

NON-CONDENSABLES

16
17

FLUID VAPOURISED OR CONDENSED


SPECIFIC GRAVITY LIQUID

18

Mol Wt VAPOUR

19

Mol Wt NON-CONDENSABLES

20

VISCOSITY LIQUID

21

LATENT HEAT

SPECIFIC HEAT
THERMAL CONDUCTIVITY

1.926

1.78 kJ/ h m2 K

TEMPERATURE
OPERATING PRESSURE
MASS FLOWRATE
No. OF PASSES
PRESSURE DROP

23
24

0.54 kJ/ h m2 K

600C

165C

25C

350C

25

214.7 psia

290.08 psia

26

3859. 68 kg/hr

3996 kg/hr

27

28

ALLOW

7psi

CALC.

0.456psi

ALLOW

10psi

CALC.

2.291psi

29
30

FOULING RESISTANCE
HEAT EXCHANGED
TRANSFER RATE SERVICE

22

1.381

2

MTD (CORRECTED)
5000W/m2 C

CLEAN

31
32
33
34

Construction of one Shell


DESIGN PRESSURE

35

TEST PRESSURE

36

DESIGN TEMPERATURE

37
38

METAL TEMPERATURE
TUBES

131

No. OD

SHELL

27 in

I.D.

CHANNEL

1.5 in

THICKNESS

LENGTH
27 in

CHANNEL COVER

TUBE SHEET STATIONARY

8 ft

PITCH

39

1.875 in

SHELL COVER

40

FLTNG HEAD COVER

41
42

FLOATING

BAFFLES CROSS

TYPE

SPACING % CUT

25%

43

TUBE SUPPORTS

TYPE

SPACING

6 in

44

LONG BAFFLE

TYPE

SEAL

45

IMPINGEMENT BAFFLE

TYPE

SEAL STRIPS

46

TYPE OF JOINT

TUBE

TUBE ATTACHMENT

47

GASKETS SHELL IN

CHANNEL

FLOATING HEAD

48

CONNECTIONS SHELL IN

INTERCONN

SHELL OUT

49

CONNECTIONS CHANNEL IN

INTERCONN

CHANNEL OUT

50

TUBE SIDE

51

EXPANSION BELLOWS

BOLTS

NUTS

52

DESIGN CODE

X-RAY

S.R.

53

INSPECTION

PAINTING

INSULATION

54

WEIGHT OF ONE UNIT EMPTY

OPERATING

DATE OF ENQUIRY

55

DATE OF ORDER

ORDER No.

DRG. No.

56

CORROSION ALLOWABLE SHELL SIDE

INSPECTION FITTING ATTACHMENT BY

57

MANUFACTURER

Prepared

58

Checked

59

Approved

1
Date

Service

Engineering

Process

REV
Company

60

4
By

Appr.

Date

REV
Address

By

Appr.

Date

61
62

Equipment No.

63

Project No.

64

You might also like