You are on page 1of 2

PROJECT : OROVIA ( PH - I )

WORK: POST TENSIONING WORKS


BILL OF QUANTITIES
Sr.
1

DESCRIPTION

UNIT

Preparing shop drawing, obtaining approval from RCC consultants,Execution of Post


Tensioning works in flat slab for the super imposed loading 5.5 KN / Sqm . including
decoiling the strands, hoisting,shifting to required location,cutting to the required
lengths, supplying and laying of HT strands( TATA make ) sheathing (GI corrugated
ducts 80mm x 20 mm 0.30 mm thick) jointing with couplers, and inserting the strands,
profiling, fixing live end anchorages including the supply of stressing anchorages
suitable for 5-5 & 5-4 Tendons, grout vents, making dead end anchorages including
flowering the strands, fixing tendon support bars, supervising the fixing of anti bursting
reinforcement, stressing the cables, end trimming, grouting the cables with cement and
approved admixtures, with required Plant & Machineries, tools and tackles,
consumables etc., including demarcation on soffit of the slab with 100 mm wide red
paint indicating cable profiles, including obtaining approval from client/consultant for the
work done as per the requirement of Project Manager at site.
Note: All the Material/Labour/Consumables, ,Grout etc/machineries required for
complete execution of the Post Tensioning works shall be to contractor's Account
. (Cement will be supplied Free of cost by client)
Approved Makes of Strands : D P Wires/Usha Martin/Tata

Sqm

Item same as above but for super imposed loading 18 KN / Sqm

Sqm

POST TENSIONING WORK

1.1

1.2
1.3

Item same as above but for Post Tensioning work in Beams ( Only weight of PT
Strands will be measured )

MT

Amount

Add for VAT


Add for Service Tax
Contract Amount

5%
9.80%

QUANTITY

12000

2000
20

RATE

AMOUNT