You are on page 1of 33

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60F TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.63 18.335 22 140 Nil 0 140 32.4 90.3 45.0 0.98480 138 0.069 138 0.12515
2C 14.09 13.796 1,450 9,121 17.654 17.364 172.701 1,086 8,035 33.8 92.8 45.0 0.98355 7,903 3.951 7,899 0.12515
3C 16.65 16.362 590 3,713 Nil 3,713 36.9 98.4 45.0 0.98065 3,641 1.821 3,639 0.12515
4C 16.80 16.513 534 3,359 Nil 3,359 37.2 99.0 45.0 0.98035 3,293 1.647 3,292 0.12515
5C 17.85 17.563 137 862 Nil 862 33.1 91.6 45.0 0.98415 849 0.424 848 0.12515
6C 17.43 17.143 285 1,794 NIL 0 1,794 35.0 95.0 45.0 0.98245 1,762 0.88 1,761 0.12515
7C 16.79 16.503 535 3,365 NIL 0 3,365 38.2 100.8 45.0 0.97945 3,296 1.648 3,294 0.12515
8C 16.90 16.616 454 2,857 NIL 0 2,857 35.6 96.1 45.0 0.98190 2,805 1.403 2,804 0.12515
SL.P 18.23 17.926 9 60 18.518 18.196 0.8 5 55 33.0 91.4 45.0 0.98425 54 0.027 54 0.12515
SL.S 7.05 6.740 365 2,294 11.932 11.610 209.02 1,315 979 32.0 89.6 45.0 0.98515 965 0.482 964 0.12515
TOTAL
TOTAL 4,383 27,564 383 2,406 25,159 24,706 24,693
REMARKS: 931 70 861 847 846

PRODUCTION LOADING INTO COT 2C


INNERTING ALL CARGO OIL TANK

Gross Volume :(T.O.V.) 27,564 Oil Volume @ 60 F :(T.C.V.) 24,706 DRAFT FWD 7.50 m AFT
Less Free Water : 2,406 Less OBQ/ROB :
Oil Volume :(G.O.V.) 25,159 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 24,706 Long tons/Metric tons :
Long Tons/Metric Tons : 3,092 3,142 Vessel Experience Factor :
API 60 F : 45 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.05 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 20-Dec-16

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

17.266 0.12716 17.544


989.034 0.12716 1004.918
455.699 0.12716 463.018
412.153 0.12716 418.772
106.218 0.12716 107.924
220.550 0.12716 224.092
412.506 0.12716 419.131
351.056 0.12716 356.694
6.722 0.12716 6.830
120.724 0.12716 122.663

3,092 3,142

8.50 m TRIM 1.00 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 20-Dec-16 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Pard

Crude Storage Lifting

24 Hours Total (bbls) 931 Last Lifting 19-D

BS and W % 0.05 Lifting Vol (bbls) 141,

Storage Gross (bbls) Next Lifting


25,159

Storage Net / G.S.V (Nbbls) 24,706 Next Lifting Vol (bbls)

Storage Net / N.S.V (Nbbls) 24,693

Days to Tank Tops 331 Vessel ETA

Total Crude This Month (Nbbls) 24,706

Water Offtake

Water Received 24hrs (bbls) 70 Offtake 24 Hours (bbls)

Total Water in Cargo (bbls) 2,406 Note :

Total P/W Received (bbls) 82,304

Water Drawn off (bbls) 0 Loading/Incoming Temp 41.0

Specific Gravity 0 Storage tanks's temperature 33.8

PFW PH 0
Note: PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 INNERTING ALL CARGO OIL TANK

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 240,512 ### 92,427 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 4,900 1,836

Closing (m3) 235,612 90,591 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Check & maintenance LSA & FFA
3. Collecting garbage in to container in lay down
4. Lifting mooring hawser to lay down
5. Release export hose to AHT Tegap jaya
6. De Ballasting
7. Maintenance Auxiliary engine No.2
8. House keeping in engine room
Tool box meeting 06.30

1. Review deck, engine and galley dept. activity


2. Maintenance LSA & FFA
3. Closing action tracker workplace inspection / SPKK
Supervisory Meeting 16.30 4. Cleaning fresh water tank C
5. Change new safety net Gang way STBD side
6. House keeping

Incidents
Type Reference Comments
NIL

Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 22


The details see SPKK sheet *)
###
Capt. Juanda Pardede

19-Dec-16

141,460

deg C

deg C

O COT 2C
TANK

8585 / 24706
e Vessel

Comment

lay down

aya

t. activity

pection / SPKK

TBD side
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
INNERTING ALL CARGO OIL TANK

Mooring/Unmooring :
01.10 : AHT. Tegap jaya starboard side alongside
08.15 : AHT. Tegap jaya cast off

Bunkering/Debunkering :

Personnel & Material Transfer :


10.40 : 2 Persons PKP by KST 51 ( In )
11.45 : 5 Sea good materials Beam Section by KST 51 ( In )
11.50 : 2 Box Sea good materials by KST 51 ( Out )
15.00 : 2 Person PKP by KST 51 ( Out )
16.30 : 5 Persons Prowel & 2 Persons Baker Hughes by KST 51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist transferred PKP, Prowel & Baker Hughes Personnels
2. Checked & maintenance LSA & FFA
3. Collected garbage in to container in lay down
4. Lifted mooring hawser to lay down
5. Released export hose to AHT. Tegap jaya
6. Lifted sea good materials
7. Inner Gas COT
8. De Ballasting
9. House keeping all area main deck

ENGINE :
1. Maintenance Auxiliary engine No.2
2. House keeping in engine room
3. Collected garbage in to container in lay down
4. Running up A/E 1 & 3:
10.00 - 19.00 - Deballasting operation
11.00 - 13.20 - Innerting All tank COT

2. PERMIT TO WORK PW MW HW CSE IP VAL


428 1608 372 166 7 883
2.1 J HA 428 1608 372 166 5 883
3. BUNKERS(M3) CONS RCVD
M.F.O 4,900 0
M.D.O 1,836 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 56 0 0 16
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
9 2
MAN HOURS ( POB X 12 HRS )
Previous man hours 206832 Days W/O LTI 1118 Since 28-Nov-13
Man hours today 264
Total man hours 207096
Safe man hours 207096
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


20-Dec-16 @2400 HRS

TOTAL
3464
3462
TRANS ROB
0 235,612
0 90,591
ROB `
45
85
ROB
200
POB
30

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1572 2 1574
2290 22 2312
3 0 3
0 0 0
34 0 34

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 31,555 0 0 1,338 0 3.0 12.0 9.0 30,217
02 30,217 0 0 1,324 0 16.0 0.0 8.0 28,893
03 28,893 0 0 1,296 0 19.0 0.0 3.0 27,597
04 27,597 0 0 1,310 0 24.0 1.0 0.0 26,287
05 26,287 0 0 1,296 0 24.0 0.0 0.0 24,991
06 24,991 0 0 1,296 0 24.0 0.0 0.0 23,695
07 23,695 0 0 1,324 0 18.0 0.0 6.0 22,371
08 22,371 0 0 1,324 0 2.0 0.0 24.0 21,047
09 21,047 0 0 1,822 0 9.0 0.0 24.0 19,225 Internal Cargo Transferred

10 19,225 0 0 1,752 0 0.0 4.0 24.0 17,473 Internal Cargo Transferred

11 17,473 0 0 1,296 0 0.0 0.0 24.0 16,177


12 16,177 0 0 1,296 0 0.0 0.0 24.0 14,881
13 14,881 0 0 1,752 0 0.0 11.0 13.0 13,129 Internal Cargo Transferred

14 13,129 0 0 1,324 0 0.0 24.0 2.0 11,805 Lifting mooring houser

15 11,805 0 0 1,906 0 15.0 24.0 0.0 9,899 Heating cargo operation


16 9,899 90,000 0 1,608 0 8.0 24.0 0.0 98,291
17 98,291 0 0 2,220 0 8.0 24.0 8.0 96,071 Debottoming PW COT
18 96,071 0 0 2,220 0 16.0 0.0 24.0 93,851 Off take
19 93,851 0 0 1,424 0 24.0 2.0 0.0 92,427
20 92,472 0 0 1,836 0 24.0 0.0 10.0 90,636 De ballasting
21
22
23
24
25
26
27
28
29
30
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Dec-16

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 270,112 0 0 0 0 270,112
02 270,112 0 0 0 0 270,112
03 270,112 0 0 0 0 270,112
04 270,112 0 0 0 0 270,112
05 270,112 0 0 0 0 270,112
06 270,112 0 0 0 0 270,112
07 270,112 0 0 0 0 270,112
08 270,112 0 0 0 0 270,112
09 270,112 0 0 3,500 0 266,612
10 266,612 0 0 1,000 0 265,612 Internal Cargo Transferred
11 265,612 0 0 0 0 265,612
12 265,612 0 0 0 0 265,612
13 265,612 0 0 1,000 0 264,612 Internal Cargo Transferred
14 264,612 0 0 0 0 264,612
15 264,612 0 0 6,500 0 258,112 Heating Cargo Operation
16 258,112 0 0 0 0 258,112
17 258,112 0 0 6,400 0 251,712 Debottoming PW COT 4C
18 251,712 0 0 11,200 0 240,512 Off take OC046
19 240,512 0 0 0 0 240,512
20 240,512 0 0 4,900 0 235,612 Deballasting
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 11 12 12 11 10 14 11 12 13 11 11 14
2 10 10 12 13 10 12 12 11 12 13 11 12
3 14 14 13 11 12 13 11 13 11 12 12 12
4 13 13 12 14 11 11 13 12 14 11 11 13
5 12 11 11 12 13 13 12 11 11 12 12 12
6 11 13 13 12 13 11 11 12 13 12 11 13
7 14 14 13 10 14 12 11 10 14 13 12 11
8 13 12 12 10 14 12 12 10 12 11 11 12
9 10 13 14 11 13 13 12 12 13 12 12 12
10 11 14 14 14 13 11 11 13 11 12 13 11
11 11 14 14 13 12 12 13 14 13 11 10 11
12 14 12 13 13 14 12 12 11 14 13 14 12
13 10 13 14 11 11 11 11 11 13 12 12 13
14 10 14 13 11 11 12 12 12 11 12 12 13
15 12 13 14 12 13 13 13 13 12 11 13 13
16 13 14 12 12 13 14 13 12 12 11 13 12
17 10 11 14 11 14 14 11 14 11 13 11 12
18 11 13 14 14 14 11 13 11 14 12 11 14
19 12 12 12 13 12 11 12 13 12 11 13 13
20 14 11 13 13 11 12 13 14 11 12 10 11
21 10 13 12 12 14 11 12 12 14 11 10
22 12 12 13 12 12 11 12 11 12 12 12
23 11 12 14 14 12 13 10 13 14 11 12
24 12 14 12 11 10 11 10 12 11 13 13
25 14 13 11 12 11 14 11 14 13 12 13
26 13 14 13 12 13 12 11 13 12 13 12
27 12 12 10 11 14 12 12 14 12 13 14
28 14 11 12 11 13 11 12 12 11 13 13
29 12 14 11 13 11 12 11 13 11 12 12
30 14 14 12 13 12 12 14 12 11 14
31 13 12 12 11 12 12

TOTAL 373 368 393 361 383 363 363 381 369 370 360 246
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 7 8 8 7 7 8 8 8 7 7 7 8
2 8 7 8 7 7 8 8 8 7 7 7 8
3 8 8 8 8 8 7 8 7 8 8 8 7
4 7 8 8 8 8 8 7 8 7 8 7 8
5 8 8 7 8 8 8 8 8 7 8 7 8
6 8 8 8 7 7 8 7 8 8 7 8 8
7 7 8 8 7 8 7 8 7 8 8 7 7
8 8 7 8 8 8 8 8 7 8 7 7 8
9 8 8 8 7 8 8 8 7 8 8 8 7
10 8 8 8 8 7 7 7 5 7 8 8 7
11 8 8 8 8 8 8 8 6 8 8 7 7
12 8 8 8 8 8 8 8 8 7 7 8 8
13 7 8 7 7 8 8 8 7 8 8 8 8
14 8 8 8 8 7 8 8 8 7 8 8 8
15 7 8 8 8 8 8 8 7 8 7 7 8
16 7 8 8 8 8 8 7 8 8 7 8 7
17 8 7 8 7 8 8 8 7 8 8 8 7
18 8 8 8 8 8 7 8 8 7 8 7 8
19 8 8 8 8 7 8 8 8 8 7 7 8
20 8 8 7 7 8 8 8 7 8 8 7 7
21 7 7 8 7 8 8 8 7 8 8 7
22 8 8 8 8 7 8 7 8 7 8 8
23 8 8 8 8 8 8 7 7 8 7 8
24 8 8 8 7 7 7 7 8 8 8 8
25 8 8 8 7 8 8 8 7 8 8 7
26 8 8 7 8 8 8 7 7 7 8 8
27 7 8 7 8 8 8 8 8 7 8 8
28 8 7 7 8 8 7 8 8 7 8 8
29 8 8 8 7 7 8 7 8 7 8 7
30 8 8 7 8 8 8 7 8 7 8
31 8 8 8 8 8 7

TOTAL 240 227 242 227 239 234 239 230 227 237 226 152
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,952 4,977 4,963 4,977 4,942 4,980 4,969 4,951 4,979 4,943 4,977 4,978
2 4,938 4,956 4,971 4,945 4,981 4,975 4,974 4,941 4,951 4,982 4,976 4,981
3 4,973 4,962 4,969 4,952 4,975 4,982 4,970 4,962 4,983 4,976 4,978 4,964
4 4,961 4,971 4,967 4,961 4,965 4,968 4,977 4,961 4,962 4,966 4,975 4,959
5 4,946 4,968 4,970 4,988 4,931 4,972 4,969 4,975 4,945 4,962 4,972 4,980
6 4,927 4,955 4,972 4,959 4,929 4,975 4,965 4,972 4,971 4,965 4,973 4,956
7 4,938 4,962 4,968 4,935 4,942 4,973 4,968 4,952 4,939 4,972 4,971 4,967
8 4,981 4,966 4,977 4,964 4,983 4,969 4,971 4,938 4,983 4,975 4,970 4,979
9 4,972 4,959 4,975 4,972 4,957 4,968 4,970 4,944 4,962 4,969 4,971 4,981
10 4,963 4,957 4,968 4,951 4,975 4,977 4,968 4,981 4,955 4,975 4,952 4,973
11 4,959 4,963 4,973 4,974 4,981 4,975 4,972 4,965 4,982 4,970 4,967 4,980
12 4,945 4,968 4,975 4,967 4,939 4,969 4,971 4,976 4,952 4,965 4,978 4,994
13 4,937 4,961 4,972 4,931 4,968 4,971 4,974 4,960 4,984 4,971 4,945 4,982
14 4,962 4,966 4,969 4,925 4,975 4,975 4,969 4,969 4,929 4,973 4,981 4,991
15 4,976 4,971 4,970 4,982 4,952 4,970 4,972 4,975 4,955 4,977 4,962 4,956
16 4,948 4,967 4,968 4,943 4,981 4,982 4,970 4,959 4,972 4,970 4,936 4,983
17 4,952 4,959 4,966 4,954 4,949 4,968 4,971 4,978 4,968 4,975 4,972 4,962
18 4,928 4,967 4,971 4,958 4,975 4,969 4,977 4,965 4,946 4,978 4,954 4,951
19 4,942 4,960 4,977 4,951 4,935 4,973 4,968 4,956 4,982 4,972 4,942 4,950
20 4,965 4,965 4,975 4,985 4,991 4,970 4,975 4,972 4,971 4,975 4,948 4,968
21 4,928 4,963 4,970 4,976 4,972 4,975 4,970 4,982 4,982 4,979 4,951
22 4,951 4,961 4,969 4,972 4,958 4,977 4,952 4,959 4,973 4,976 4,957
23 4,972 4,966 4,973 4,961 4,978 4,971 4,945 4,964 4,959 4,969 4,963
24 4,938 4,972 4,974 4,972 4,984 4,977 4,962 4,987 4,982 4,974 4,952
25 4,944 4,968 4,982 4,931 4,975 4,974 4,980 4,949 4,962 4,978 4,962
26 4,958 4,962 4,958 4,983 4,963 4,970 4,971 4,969 4,981 4,972 4,970
27 4,967 4,951 4,981 4,925 4,961 4,968 4,981 4,935 4,949 4,979 4,982
28 4,935 4,966 4,963 4,971 4,964 4,971 4,975 4,981 4,964 4,977 4,963
29 4,951 4,958 4,972 4,964 4,960 4,968 4,965 4,959 4,977 4,982 4,959
30 4,962 4,957 4,937 4,972 4,972 4,951 4,982 4,948 4,973 4,948
31 4,958 4,981 4,969 4,967 4,979 4,978

TOTAL 153,529 143,947 154,096 148,766 153,882 149,184 154,039 153,898 148,948 154,148 148,907 99,435
Averag
e/Day 4,953 5,141 4,971 4,959 4,964 4,973 4,969 4,964 4,965 4,973 4,803 3,208
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2016

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 130 65 25 140 95 50 45 30 75 95 85 100
2 30 80 90 105 60 45 50 55 95 125 120 70
3 130 125 105 140 70 50 70 90 95 90 115 100
4 40 120 35 115 55 85 80 60 125 40 90 150
5 75 125 95 135 80 65 135 50 45 65 80 155
6 40 70 120 120 120 55 70 60 60 110 130 135
7 125 100 95 125 120 115 85 85 105 90 95 125
8 100 75 115 140 125 110 110 70 130 100 60 145
9 110 85 90 70 105 115 105 80 115 100 110 60
10 135 85 105 135 85 120 100 120 120 55 115 135
11 120 65 75 120 105 115 75 75 90 50 180 40
12 80 105 90 155 115 120 55 80 115 45 140 75
13 50 110 110 60 105 80 45 75 105 140 95 80
14 125 90 75 100 95 95 40 65 115 155 90 140
15 120 60 85 70 40 145 45 45 60 105 140 95
16 95 95 75 60 75 75 45 90 80 105 110 75
17 115 80 85 80 80 40 55 140 115 65 60 115
18 100 95 100 110 65 60 50 130 110 70 105 70
19 105 100 55 120 20 125 55 140 90 145 155 30
20 145 95 125 125 75 135 105 105 125 140 100 80
21 95 85 105 120 115 145 110 130 120 85 75
22 120 100 135 115 70 85 90 65 115 100 95
23 110 70 120 100 105 75 90 80 120 135 120
24 80 50 130 95 100 80 75 125 130 125 150
25 105 25 120 60 60 115 45 110 45 95 105
26 115 70 130 115 100 55 50 120 85 105 155
27 100 70 155 115 85 40 85 125 70 90 105
28 110 75 125 110 95 45 85 130 55 130 105
29 105 95 145 65 90 55 85 100 65 80 130
30 145 135 80 75 45 30 115 125 140 140
31 100 150 70 50 80 105

TOTAL 3,155 2,465 3,200 3,200 2,655 2,540 2,215 2,825 2,900 3,080
DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Dec 2016

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Dec-2016 24 1 16 41
2-Dec-2016 24 1 19 44
3-Dec-2016 24 1 21 46
4-Dec-2016 24 0 21 45
5-Dec-2016 24 0 16 40
6-Dec-2016 24 1 17 42
7-Dec-2016 24 1 15 40
8-Dec-2016 24 0 13 37
9-Dec-2016 23 0 13 36
10-Dec-2016 23 0 8 31
11-Dec-2016 23 0 6 29
12-Dec-2016 23 0 6 29
13-Dec-2016 23 0 6 29
14-Dec-2016 23 0 6 29
15-Dec-2016 23 1 6 30
16-Dec-2016 28 3 8 39
17-Dec-2016 28 4 13 45
18-Dec-2016 26 5 13 44
19-Dec-2016 22 1 0 23
20-Dec-2016 22 1 7 30

TOTAL 479 20 230 729


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 20/Dec/16
Action/Commen Positive /
Reported by Rank Location Description Total
t Negative

Lifting materials supended due wind speed 22 Informed lifting team


1 IHWAN ASRUL Master Main Deck
knots sustained to stop
Negative 1

2 IYYANG C/O Main Deck All in charged DE ballasting activity Positive 1

3 ANDI A UNIT 2/O Main Deck Assist C/O DE ballasting activity Positive 1

4 INDRA 3/O Main Deck Assist released Export hose to AHT tegap jaya Positive 1

All in charged engine team operation auxiliary


5 JULY MANGIRI C/E Engine room
boiler for Deballasting activity
Positive 1

Assist C/E operation auxiliary boiler for DE


6 ACO AKBAR 2/E Engine room
ballasting activity
Positive 1

7 RATNO SITUMORANG 3/E Engine room Maintenance Auxiliary engine no.2 Positive 1
Assist C/E operation auxiliary boiler for DE
8 HENDRA PRATAMA 4/E Engine room
ballasting activity
Positive 1

9 NIKO E/E Engine room Assist 3/E Maintenance Auxiliary engine no.2 Positive 1

Lifting mooring hawser to lay down as crane


10 AANG Bosun Main Deck
operator
Positive 1

11 ACHMAD NURUL HUDA AB Main Deck Assist C/O Lifting mooring hawser to lay down Positive 1

12 UDIYANTO AB Main Deck House keeping on deck starboard side Positive 1

13 BAYU SEGARA AB Main Deck Assist C/O DE ballasting activity Positive 1


Assist 3/O Released export hose to AHT tegap
14 DEDI OS Main Deck
jaya
Positive 1

15 SAIFUL IMAM FTR Engine room Maintenance Auxiliary engine no.2 Positive 1

Steering rear
16 ELIK BUDIANTO FTR room
House keeping in steering gear room Positive 1

17 SUAIB MTM Engine room Assist 3/E Maintenance Auxiliary engine no.2 Positive 1

Assist C/E operation auxiliary boiler for DE


18 NUR ALI MTM Engine room
ballasting activity
Positive 1

19 MASRUDI C/Cook Galley Cleaning galley area floor Positive 1

Store
20 ROCHIM COOK Provision
House keeping in provision store room Positive 1

21 RANGGUN JAWI STWD Deck A House keeping in deck A area Positive 1

22 BOBI MANGOTO STWD Deck B House keeping passage in deck B Positive 1

TOTAL 22

You might also like