Background
Project Phasing
Salient features
Both corridors will be constructed simultaneously. It is envisaged that the corridors will be fully operational over their entire length by
Eastern Corridor
2018-19. The following table indicates the tentative phasing of the project:-
Western Corridor
Project Funding
Phase I Rewari- Vadodara (920 Kms) 2011-2017
Project Status
Phase II Vadodara- JNPT(430Kms) 2012-2018
Eastern Corridor