Report of FANAR 5 Site: Checked By: Dr. Moustapha SOUBRA
Report of FANAR 5 Site: Checked By: Dr. Moustapha SOUBRA
Dear Sir
First of all, we should mention that the building has four stories.
The structural system of the building is in a good condition . The roof is
covered with a an isolation layer (asphalt roles ). But, because of the bad
execution of the isolation we noticed several of rainwater spots laying on
the roof.
During our visit we have seen that the existing site on the roof is
constituted of :
Upon your request the new poles and the equipment cabinet will be
placed on the roof in addition of the existing site. The new poles will be
placed on the existing concrete foundations (220x220x20H). The brackets
of those two poles will be fixed on two new foundations (80x80x20H) ( as
for the locations check the AutoCad drawings).