You are on page 1of 34

369 Tamer Al Naggar .

1- ? pass
aim a p pull lock
s sweep s squeeze

2- B . O . P
Blow out preventer

3- HCR
High closing ratio

4- SWL
Safe working load

5-

6- R.R.C.P
Reduce Rate Circulation Pressure
stk
formation

7- yield point yield strength


Strength at which new drill pipe starts to deform

8- burst strength
The internal press that can cause pipe to burst

9-
1-collapse 2- slip cuts, metal tears 3- corrosionn
4- washout 5- twistoff

10-
1-slick 2- spiral

stuck string

11-
1- provides weight on bitt
2- to keep string under tensionn
3- To provid the pendolume effect in straight hold

12- stabilizer
redue the buckling 1-
increase bit life 2-

3- provide angle control in directional drillingg
- allow applying of higher (WOBB ) 4
reduce chance of stuck 55-

13-
- lubricate and cool the thread and shoulderss 1
to make a good seal on shoulders 22-
- prevent galling 3
- help to make a good make up torque4

14-
-
-
-
-

15- Rotary
- String Slips
- Kellyy
- center
16- Kelly
- -

17- wash pipe


string

18- swivel
-
- wash pipee
-

19-
0.7854

20-
-
- 5.614
-
- 12

21- pump out put


eff 33
d diameter
l length of stroke
eff efficiency

22- Anchor
- dead line
-

23- 5
- -
- kick HP
- string trip casingg
- filter cake

24-
--shale shaker - Desander - Desilter - mud cleaner - centerfuger - sand trap

25- mud balance

26- marsh funnel

27- :-
shale shaker , degasser , desander , mud cleaner desilter , centerfuger
- micron 74 shale shaker
- degasser
- 35 psii 45
- sand desander micron 40 to 744
capacity 500 gpm /cone , psi 45 355
- silt desilter micron 20 400
cap 75 gpm / cone psi 35- 45
- 20 mud cleaner micron 77
- Capacity 75 gpm / cone
- center fuge micron 4 7

28- ) M.G.S) mud gas separator


-

29- chock manifould


- flow felarr system separator
- deal with kick in safety and flexibility way

30- adjustable chock valve


- string casing kick swaco
- control back pressure

31- B.O P
- 1- Factory body test ;-
-If working press 10.000psi and more psi 15.0000
( %) 150
if working press 5.000 psi and lesss-
%) ) . 200
Initial test :- ram test (100%)-2
)Annular test ( 70%
Working press tese :- -33
well head work presss
casing burst press

32- B.O.P.stack
-
- 211

33- test plug cup tester


cup testerr
*
* casing - test well headd
- :-
- 1- stuck casing test
- 2- bling ramm
- 3- rupperr
" " Test plug
*
* test ramss
-: test well head.

34- mud mixer


jet hopper



hopper mixer
35- annular
Cameron shaffer hydril comy

36-
shear - ram (3000) psi
37- pipe rams
5" ram 600.000 lbss
3. " ram 425.000 lbs
fixed ram only
test hang off

38- hang off string


string ram .
semi-submersible rig

39- fast line "drilling line "47


" 6**19 1

40- twist off


- * drop weightt
- * drop press
- * RPM increase
- * increase SPMM

41- MUD PUMPS


* Duplex pumpp
* Triplex pump
triplex pump :
-
- horse power triplex pump
% 98 - %95
duplex 85%
- Lighter than duplex in work

42- ........ ( )

43- filter cake


-
-
- cement jop
- :-
Thick impermeable increase with water losses sizee
- minimize formation damagee 1
2- improve hole stability to avoid Drag and stuckk
3-reduce fluid losss
44- kick
An intrusion of formations fluid into the well bore
" "
45- gain influx flow kick
- kickk
- influxx
- floww
- gain

46- kick
- primary warning signn
- secondary warning sign

47- wash out


-
-
- ph
- H2S
- slips area stringg
* press decrease
* R.O.P decrease
* tourqe increase
* SPM increase

48- stuck
* Mechanical stuck
**Deferential stuck

49- ph
- * to prevent corrosion
- * to overcomes h2s gas
- *To Reduce High temperature
- * HP To Make stability in HP

50- MAASP
- Maximum Allowable Annular Surface Pressure
51- GPM Gallon Per Minute
- stk pump out 42

52- ) STK ( strokes


gpm pump out 42

53- swabbing
- stringg
- swab :-
1- tripp
2- stabilizerr
3- string
4- B.H.AA
55-

54- surge press


trip

55- surge press


- trip
-
-
- float valve
56- B.H.A" Bottom hole assemble

57- R.R.C.P


5000
pumpp

58- TEST line pump pump


" 2 release
safety valve pump
59-
"" Hard shut in
""Soft shut inn
Hardd :-
- Close pipe ram or annular
- Open chock line
- Read press on swaco while adjustable chock valve is closed
Soft :-
- Open chock line valve
- Close B.O.P stack
- Close adjustable chock valve
- Read press on swaco

60-
* Driller method * volumetric method* Wait and weight method *concurrent method
1- Driller methodd
) system (circulate the influx
cycle ( kill the well)2
2- Wait and weight methodd

one cyclee
)(circulate the kick +kill the well
3- Volumetric methodd

string plugged
4- Concurrent method
concurrent
61- one cycle
Wait and weight method

62- two cycle


Driller method

63-
shale sloughing -
Lost circulation -
Kick and blowout -
- High BTM hole temperaturee
Stuck -

64-
Ppg * pcf * sg * psi 1000 Ft

65-
8.34 ppg
66-
quart second
67-
26.8 sec quart

68 - marsh funnel quart


marsh funnel quart

69- gel strength


cutting pump

70- yield strength


cutting pump
pump
71- ph ............. . .............
9 _ 11

72- sand
pump damage in pump parts -
reduce rate of penetration -
cause bit nozzle plug-
rig down time -

73- :-
Bentonite , duvis , Biopoly , viscotyy
viscosity material Bentonite
Soltex shale support and control
water loss control Resin temperature control
c.soda increase ph in mud , reduce h2s gas

74-
Stuck
Kick
lossess
cutting still on BTM
press decreasee

75- slug trip


- trip
-
- string rig floor

76-
new M.WTT
NEW PRESS = old press
old M.wtt
77- spm
= presspress

78- screen mesh


( (screen
79- hopper
jet
mix

80- pump flow line


1- Surface line press losss
1 to 3%
2- Drill string internal losss
25 to 35 %
3- Bit nozzle press loss :-
50 to 65%
4- Annular pressure losses :-
5 to 10 %

81- kommy
-
- powerr

82-
-
- pre jop
- pump lock pump
- " 4 " 2 suction pump
- pump
- pump
:-
- pump
- suction "4 " 2
- lock pump
- safety
-
- scr unit pump
- pump

83- " " Rotation


Conventional & Top Drive

84- Master Bushing


Split Type
Solid Type
Hinged Type

85- Area
= Pressuree
Force = Pressure Area
P ~~ psi F~~lbs A~~~ sq in

86- Hydrostatic Pressure


HP = Con't M.wT TVD
0.052 MwT True Vertical Depth

87- Specific Gravity


= 8.34

88- HP Gradient Pressure


HP = Gradient Press TVD
89- Yield Point
Viscometer
90- Water losses and filter cake
Filter cake increase with water losses increase

91- Heavy Weight DP


1. Support weight on Bit
2. Transition zone between DP and Drill collar
3. Make string under tension with DC
4. Enable in Directional controll
5. Prevent deferential stuck

92- Monel
Non-Magnetic slick D/CC
Use in survey with tetko bar while Drop it to know the direction of the well
93- Torque
85 % Torque

94- : pump pump


Annular Press Losses "Dynamic" APL
Formation Press HPFlow
pump (( Apl HP Apll Formation

95- Sweep Spot


Sweep ~~ Hi vis pil to circulate the hole clean
sweep hole trip
Spot ~~ Hi vis pil to put in on BTM before Trip
spot trip Pooh
"Sweep " :-
1. BBL SweepSTK
2. Annular Vol. STK
3. String Capacity. STK
4. STK
5. STK sweep
6.
7. STK String Cap + Ann. Cap
" Spot " :-
1. BBls Spot STK STK500
2.
3. BBL STK 500 String Capacity STK 500 pump

96- Anchor Gap


Anchor 8/3 5/8

97- Overbalance
HP Formation Presss.

98- Losses Surface


High rate of penetrationn
High formation porosity
Because of sand and silt
High permeability

99- String Trip


HP
Collapse

100- : Break Circ RIH Trip



HP

101- Trip Tank


Trip Pooh RIH Losses Gain
Trip Sheet Trip

102- H2S
-:
-:

103- H2S
PPM = Parts Per Million

104- H2S
1.
2. H2SS
3.
44.

105- Gas Detectors


" "Personal Sys
" "Portable Sys
" " Fixed Syss
106- AC Motors DC Motors
__ DC RBM Blower
__ ACC

107-
Anchor

Crown
Elevator Rig Floor

108- :

109- Function Test


Annular ,, Rupper

110- : Function Test BOP




111- OD ID

Fishing
Fishing Line Jops

112- Shaker Man




Kick Loss

113- : Inspection pump trip logging


Pumpp

114- Kommy Unit


* Air Pump * Electric Pump
Or any two power source

115-
BOP

116- " Pulsation Dampener "


pump
Smooth

117- New Liner


New piston

118- pump
Wash Mud cut

119- : pump

120- HCR - Kill Line


HCR Kill Line ___ HCR
HCR Back Press
121- Slips Casing
Slips 3 size
Safety clamp 2 size
Slips Casing 5 Size Casing

122- Pick up.wt Rot. wt slack /D .wt


String ~~~~ P/U .wt
String ~~~~ Rot .wt
String Connection ~~~~ S/D .wt

123- string string


D2 d2 HH
1029.4
D2 HH
1029.4

124- pump
Sand
Short System
solid control

pump

125- Limitation Man Riding


Limit Stuck Limit

126- Lost Circulation


1. Bad Cement Jop
2. Formation's break down
3. Natural fracture in formation

127- slug System


1 PPGG 2

128- Swaco Rig floor


Chock Adjustable
Swaco

129- easy torque


Torque .99 26 - 17 - 12

130- Accident Incident


~~ Incident
~~ Accident " " incident

131-

132-
:::: +
::: +
:::: CO2

133-
1. Stop
2. Drop
3. Roll
4. Cooll

134- pump Unit



Close Annular
Open HCR
22

:-
Pumps
Close Annular
Close All Rams
Open HCR
psi 200 precharge press

135- Rings
R , RX , BX
: RX , BX Leak Ring
R , RX ~~~~~~~~~~~~~~ 6B
BX ~~~~~~~~~~~~~~ 6BX

136- Rig Floor


1. Inside BOP
2. Safety Valve
3. Circulating Sub

137- Kommy
Pre-Charge Press. 1000 psi
Minimum Press. 1200 psi
Maximum Press. 3000 psi

138- U Separator
: -
U
separator HP
GAS VENT LINE

139- Rams
Elostomer Ram
Shearing Blind Ram
Dowal Ram
Variable bore Ram

140- MWD LWD


Depth ~~~~ MWD
Logg ~~~~~~~~~~ LWDD

141-

142- : pump Panel driller


Because of Dynamic losses Press.
pump Surface line pump
143- Casing
Casing
Spider Elevator
144- " "
1000

145- Kommy
) Manifold Press. ( 1500 PSI
) Annular Press ( 600 1500 PSI
) Accumulator Press. (3000 PSI
146- 0.052
It's a press gradient of a fluid having weight 1 ppg

147- Bentonite
Increase Viscosity
Decrease Water Losses

148- Flanges
6B , 6BX

149-
Composition
Compression
Temperature

150- Rubber Annular



151-
65.44

152- Casing Shoe


one way valve

153- : Float Collar 2 Casing



80 Rubber Float
Shoe SHOE

154-
1000 psi

155- pulsation pump


156- Complete Losses


Barite Plug ~~ Should be high enough " 300 Ft " . It's a good way to seal the kick zone
Gunk Plug ~~ Bentoute + Diesel 5 bbl Diesel before and after the plug

157-
BOP
Divelter

158-
Diesel
159-

:-
Rig Floor , Mud Tanks , Cement Unit , Rig Officers
160- ID T-Card


161- tool joint HWDP


Tool Joint

162- Dog Leg


Direction

163- Top Drive 47


65.000 lbs

164-
Top Drive

165- Tongball

Tong

166- ( system ) level


" "Active

167- Pipe Ram


1. Alanki
2.
3.
44.

168- Power
3
Power :-

169- Stripping Operation


Trip Kick BTM Ram two pipe rams top
Trip

170- Position 4 Ways Valve 3


Kommy 33 :
Neutral , Close , Open 4 Kommy

171- BTM Plug Top Plug cement jop


BTM Plug : ram Casing
Top Plug :

172- : Pump
Pump psi " 15"

173- Many Cycles


Concurrent Method
174-
Isolation Valve
175- : Bentonite
Make filter cake
Decrease water loss
Carrying heavy cuttings

176- "4 "2


1.
2.
3.
4.
5.
66.

177- Safety
Out

178- Liner
Liner ~~~~ 900 HRS
Seat ~~~~~ 2000 HRS

179- Test Kill line


Leak check valve
180- psi Test Adjustable
750 1000 psi
181- Gam

Frack psi 10.000

182-
Martin Dicker Oil

183- Chock Sub


184- Below JAR


JAR JAR

185- " Liner , 7" Liner 5


Mechanical Way
Pressure Way

186- Rabbit
ID size casing

187- Crown

188- : Block guard


Crown Rotary Crown
189-
30
30 Sec pipe Rams
Sec annular 30
190- Annular kommy
Accumulator Press.
Annular Presss.

191- Chock Sub JAR


Chock Subb : Rig floor
JAR : 2 Stuck

192- Rig floor


Rig floor:
3
2/1 44/1

193- Well Head


Tubing Head Spool

194- Wear bushing


Well Head Damage

195- Drilling Break


Bits Conditions, Information changes, Change in drilling parameter

196-
Atmospheric Press. = 14.7 psi
197- pipe Rams
Bonnet seal rubber

198- STK STK


Swaco Adjust Choke

Kick surface
capacity separator

199- . . ... ...


Shale

200- Shale
Mechanical Shale
Pressurize Shale
Caved Shale

201- Pilot Hole



Blow out

202- Marker Joint Casing


Casing Depth logging "
" 200 Marker Logging

203- :

204- Well Head Test Plug BOP Test


Side outlet valve BOP Test Plug :-
1. Damage Casing Open hole
2. Leak Test Plug

205- Test Safety valves psi


Each the time BOP is Tested
To the same pressure as the BOP
BOP Pressure

206- SICP
Hole packed off
207- SCRslow circ rate
1. The Mixing Capacity Of The Rig
2. The Chock Line Capacity
3. The Mud Gas Separator Capacity
4. The Maximum Available Pump Pressure
5. Lower Annular Velocity To Minimize The Possibility Of Choke Plugging

208- Hole Clean


Size and weight of cutting
Flow rate
Annular Velocity
Hole angle
Hole stability

209-
1. From the cutting
2. From the logging
3. By coringg

210- : Swaco )(Manual


Adjust pump Manual Al-Choke

211- Ton-Mile
The weight of the drill string multiplied by the depth of the hole
string depth

212- 19*6 Wire


6 199

213- Sleep Cut




214- Jop 8/3 13


Mud circulation rig pump
Pressure test 3000 psi line
Pumping wash cutting Hole
Pumping spacer
Drop bottom plug casing
Pump lead casing
Pump tail slurry Shoe
Drop top plug casing
Displacement Unit Rig pump
Bleed off and check returns Bleed off

215- Leak off Test


shoe formation MAASP
:-
1. Casing Shoe
2. shoe 5 15
3. Circulation in = out
4. String Casing
5. Cement Unit
6. BOP String
7. Unit pressure
Press
8. pump Press
9. Bleed off
216- Point of Tangency
The point at which the drill collar string changes from compression to tension
string
217- kick
1. Slow circulating rate
2. Shut the well in
3. Kick tolerance
4. killing method

218- :- Boyel's Law


P 1 (Press.) V1 ( Volume ) = P2 V2
219-
Toxic Gas
Explosive Gas
Hydrocarbon
Smothering Gas

220- Surface Hole


Control rate of penetrations
Drill pilot hole
Pump out of hole

221- Stripping Snubbing


Stripping: Trip Kick Trip Stands
String

Snubbing: Trip string


String .

Stripping Operation

222- Pump out Put


For Triplex pumps :-
= 0.000243 D2 Stroke Length eff
:-
D ~~~ Liner Diameter
eff ~~ Efficiency

223- MAASP
1. Incorrect casing shoe depth
2. large kick size kick
3. low fracture pressure
4. long open hole section
5. Gas migration
6. Bad kill practices
7. Chock line friction loss chock
8. unexpected High pressure

224-
Blockages (string , Annuals, Chock) *-
*Wash out (string, chock ) -
)-Surface equipment failure (losses, Hydratess

225- Pre-use Examination


*ID number is evident
+ *SWL is Marked
*Color code is incorrect

226- P.V.T System


Pit Volume Totalizer sensor Mud logger Unitdriller panel
227- Scavenger Cement Jop
Hole Hole Gutting " "
228- "Safety valve " Full Opening " " B.O.P" "inside , "One way safety valve
Full opening safety inside B.O.P string inside BOP
safety

229- Working pressure


5.000 psi
230- casing
A.M.S *Batric *New Vam *Vam top

Tamer Al Naggar

231- Work permit
3 :




232- Mud Mix
50 psi to 60 psi
233- Connection
- :-
Annuals
- cutting pump String
- Float valve
234- guns system Hopper
*
* Foam
235- Trip Tank Trip
500 - 25
236- Annular Kelly
Annular mill stabilizer- bits
237- -:

238- ............. ...
4000 Lbs
239- 4 kick
- - Insufficient Mud Weightt 1
- - Lost circulation - 2 - Abnormal High Formation Pressure - 3
- Mud cut by gas or water4
240- Diverter
Surface hole vent line

241-
)1
)2
)3
)4 tension
)5
)6 Tag-line
)7 ""safe working load
)8
)9
10- " "Banks man Jackett
242- -: Cement Jop
Make lower cement contamination

243- :
)1
)2
* " " 15
* 9
244- Shackles
Bow Shackles - Dee Shackles
- U ~~~~~~~~~~~~~~~~~ Dee Shackles
- U ~~~~~~~~ Bow Shackless
245- HP sp.gr
HP = Const (0.052) sp.gr 8.34 TVD
246- H2S
) 10 PPM ( Part Per Million
247- P.P.E
Personal Protective Equipment
248- Rig Floor kick Trip
:
Soft shut in Hard Shut in
Soft
-position stringg
1) Install full opening safety valve on string.
2) Close the safety valve.
3) Position drill string.
4) Open HCR
5) Close BOP
6) Close adjustable choke.
7) Read and record SICP and pit gainn.
Hard
position stringg
1) Install full opening safety valve.
2) Close the safety valve.
3) Position drill string.
4) Close BOP
" 5) Open HCR " Adjustable closed
6) Read and record and pit gainn.
:-
" 1) Adjustable choke "
" 2) Open Close "
249- Weep Hole Pipe Rams
* Damage in opening chamber
* Leak .
250- Possimbile Shacker
* Mud Degasser
* Gas Detector
* Flow Sensor
251- By Pass Valve Kommy
* Manifold Manf ~~~ 1500 psi
Shear psi 3000
By-Pass (psi) Maniflod 3000
252- Master Valve 5
Signal Build up Pressure Rams
253- Weep Hole Mud pumps
Damage Pump leak Weep
flow end.
254- Mud cleaner Rig 47
Feet Working press :-
X system 0.052 X
45 35 psi
255- Hunger slips
Casing Well Head Casing Casing Hunger
.
256- ? Crown Travelling Block( ( rig 47
Travelling Block - 6 -
Crown - 7 -
257-
1 bbl = 5.614 ft3
1 bbl = 42 Gal
1 ft3 = 7.48 Gal
1 Met = 3.281 ft
258- .. .
Drawwork ? 630 Gearbox
Swivel ? 630 Gearbox
Rotary ? 630 Gearbox
Horse ? 25 Hydraulic
Pump ? 630 Gearbox
259- 8 Kick
1) Increase flow rate ) Increase Bit gain 2
3) Well flow with pump off
4) Hole Dose not take the correct Dispp
5) Drilling break fast breakk
6) Increase in Rotary torque
7) Increase in connection gass .
8) Decrease pump pressure presss
260- BHA
HWDP :-
1- Length 2- Fishneck 3- OD 4-ID 5- Serial Number
261- Chock sub Tetco Ring
Tetco Ring
262-
1) Length 2) Size 3) Type 4) Manufacture 5) Gets 6) Serial Number
263- Trip
* Trip tank with "25 ~ 50" bbl Volume
* Trip sheet filled correctly
264- Metal Displacement
= Metal Disp = bbl / ft2748
265- Pre-Tour safety meetingg
Pre-Jop safety meeting
: Pre-Tour safety meeting

safety .
: Pre-Jop safety meeting

.
266-
= 5 Wob
: 5 = 5.2
267- Mud pump Rig 47
Oil well A1700 PT
Triplex Single Act
268- Position 4 ways valv 3 open
1500 psi
269- Closing Ratio 6 : 1
psi 6000
psi 1000
-: Hole Press Closing Pressure
270- Unit
*
* psi 5000
: 1966
271-
Purifrie filtration
272- BOP 47
Shaffer 10.000 psi
273-
3. " DP ~~~~~~~~~~~ 3. F
5 " DP ~~~~~~~~~~~ 4. IF
Drill Collarr:
4. ~~~~~~~~~~~~~3. IF
6. ~~~~~~~~~~~~~ 4. IF XH
8. ~~~~~~~~~~~~~~ 6 5/8 Regular
9. ~~~~~~~~~~~~~~ 7 5/8 Regular
274-
6" ~~~~~~~~~~~~~~~ 3. Regular
8. ~~~~~~~~~~~~~~ 4. Regular
12. ~~~~~~~~~~~~~~ 6 5/8 Regular
17. ~~~~~~~~~~~~~~ 7 5/8 Regualr
26 ~~~~~~~~~~~~~~ 7 5/8 Regular
275- Kick off point
Direction
276- " Bits "
" Roller Cones "Rock Bit" Fixed Cutter " Fixed Head
pdc
277-
Malti Gas Detector
.

278-


279- safety
:
)(1 - : Warning
)(2 - : Mandatory
)(3 -: Prohiption
280- Check
~~~~~~~~~~~~~~~~~~ " "Guagee
~~~~~~~~~~~~~~~~~~~~ CO2

~~~~~~~~~~~~~~ CO2
281- Eye wash
Anti Bacteria Sloution
eye wash
282- safety factor ..
Wires ~~~~~~~~~~~ 1 To 5
Shackles ~~~~~~~~~~~ 1 To 6
Weep Sling ~~~~~~~~~~~ 1 To 7 ()
Safe working load
283-
=
Litre / Minutee 40
284-


285- SCR Unit
Silicon Control Reactifire
286- Fork lift
20 30 : -
)1
)2
)33

287- " " " Buoyancy Factor


= MWT - 65.44
65.44
288- Insepction
:-
)(1 .
)(2
)(3 Drume 5.1
)(4
)(5
)(66
289- Kick Drill, Fire Drill, H2S, Drills
: -




Team Work
290- " "Maggo

291- Steal plate Rams
Rupper
Corossion
292- Rams BOP " "U
Rams
Close ... Close Open
Close Ramss

293- -: Intermaidite Flange BOP
.. Blind Ram intermaidite flange BOP
294-
?? How to know that the well have a good clean
Normal Drag
Normal Tourqe
Normal Cutting on shackers
No back flow in connection
Normal ROP
295- vent line Diverter
Big diamter
straight
the same direction with wind
296-
)(usable fluidee
297- Elecrtic pump
It will automatically start when system pressure decreased to 90% of system working pressure
%90
pump
298- Frequency rate
:-
Frequency Rate = 1.000.000
299-

2 3



300- Drum
"" Drum 4 -:
Under wind Right to Left
Under wing Left to Right
Over wind Right to Left
Over wind Left to Right
301- Kick
"Trip (5 BBL ) "In case Tripp
'"Drilling " (10 BBL ) "In case Drillingg
302- Normal Drage
Stand :
Lbs10.000 ~~~~ 5000
303- : Mechanical Stuck Differential Stick

304- LTI
Lost Time Incidentt
6

305- IWCF
International Well Control Forums
306- Agetator
%75

307- Agetator



308- Centerlizer
Center Casing
Cement Jop casing
309- Drawork Drume Travilling

8 Drume Top Drive Kelly
310- SIDPP < SICP
Because of the influx denisity less than mud denisity
influx system
311- Choke Kill line
Hydraulic valves closed
Manual valves open
312- Permeability __ Porosity
Porosity :- The pore spaces within the rock matrix measured in % percentage . or ratio of avoid
space to the total volume

Permeability :- The pore spaces are connected allowing pore fluids to flow through the rocks
measured in darcies . or the ability of the rock to let the fluide to bath through

313- Function Test API RP53
At least once a weakk
314- Rated working pressure
The maximum internal pressure the equipment is designed to contain and / or control

315- Test kill line
From the well bore side:-
With the check valve removed
And kill line vented it's pressure
BOP Check valve kill
316-
Amper
317- Kick SCIP SIDPP
SCIP = SIDPP TVD Influx
318- Oil mud Water mud kick

319- Stand off


Distance between two flanges

320- Annular preventer


Outside bodyy
Opening chamberr
Piston
Closing Chamber
Element, Packing Unit
321- Annualar Stripping
The minimum press of BOP closure that ensure proper sealing
BOP Good Seal
322- float valve
Dart Float
Flapper Float
323- :-Full opening safety valve non return safety valve
Full Open ~~~~ * Must run in hole in open position
* Need key to close
Non-Return ~~~* Read SIDPP
* Not allow wire line to be run inside the string
* Keep in open position by road
324- Sleep and cut Jop
String : -
string slips
string Full opening valve open
Travilling Hang Off

Anchor

Drawork Drume
Reserve Drawork

Rig floor
FMS Drawork
Drawork Anchor
Anchor
" "Traviling
Hang line
Full opening valve string
325- Break
- Disk break
- Band break
- Maggo break
326- wire
- Wire rope - center
- Strand - wire - core
327- travilling crown
- distribut the load
328- anchor
- anchor :-
fixed
movable
-
- 3 6 88

- anchor driller panel
329- wash pipe
- wash pipe leak 250 -:
- 250 hours circulation all these hours
330- casing
1- Tensile 2- collapse 3- burst
331-
1- Density - viscosityy
2- Gel strength - filtration
332-
1- Hoisting system
2- Power system
3- Circulation system
4- Rotation system
5- Well control system

333- compansator system


- :-
Sem-sub rigs - drill ship
- :-
- Crown - draw work - travillingg
- . string

334- Specify the desander on your rig
- Number of cones 2
"- Cone size 12
- Capacity 500 gpm
- Working pressure from 35 45 psi
- Removes sand from 40 20 micronn
335- What is the methods of control hole deviation
1- Start straight
2- Use the right BHA include :-
- Pendolum assy
- Packed pendolum assy
- Packed hole assy
- Down hole mud motor assy
3- Reduce bit weight
336-
- Cooling
- Smothering
- Starving
337- Specify the desilter on your rig
Cone size 4"
Number of cons 16"
Capacity 50- 75 gpm / cone
Working pressure 35- 45 psi
Remove silt and solids from 20 7 micron
338-
High speed make up torque
Cause galling 1-
Cause damage in threads and shoulders 2-
339- Why the Kelly becomes un usable
1- Thread damage
2- Crooked or bent
3- Fatigue in drive section
4- Rounding of the drive corners
Hoisting system 340-
1- Draw work
2- Fast line
3- Derrieck
4- Crown
5- Travilling
6- Dead line
7- Anchor
4 direction 341-
- TVD - MD
- ANGLE - AZIMUTH
TARGET -
:- 342-
1- Tetcoo
2- Single shoot survyy
- Tetco
- Single shoot
M.W. D 343-
- Sensor
- Bettary denamo
- Computer
- Rotor
- Stator
1 -
casing 344-
Conductor
Service casing
Intermadite casing
Production casing
345-
- Collapse - burst
- Tensile torsional

346- compression drilling


- heavy weight drill pipe
D.C direction drilling
347- :-
? Wear bad
? Hard face
- Wear bad HWDPP
- Hard face tool joint
stuck
348- margin of over pull
rot.wt % 90 tensile strength

349- pressure compensation system


- cone cone cone
350- PDC direction
- formation .
351- nominal wt adjusted wt
tool joint :- N
tool joint :- A
352- tool joint
- By friction welding
- Sudden cooling
353- upset
Transition zone between thick tool joint and thin pipe body
upset
- Internal upset
- Exetarnal upset
354-
Allow fluids to reach bit
Transmit movement to bit
To reach the depth require
355- PDC bits
Polycrystalline Diamond Compact
356-
Tungestane carbide
TRY CONE :-
- Insert tooth
- Milled tooth
357- journal angle
The angle formed by the line prepared to the axis of the journal and the axis of bit
358- nozzle
Snap ring
Thread
Nail retentiol
Studs
359- L offset
The horzintal distance between axis of the bit and the axis of the cone
360-
? What is the normal formation gradiant presss
" 0.465 psi/ft "normal
up normal
sub normal

361-
? How to control surface holee
Control rate of penetration
Drilling a pilot hole
Pump out of the hole
362- RX BX ring
pressure
363-
Size ID
Rated working press
Ring gasket type and numper

364- B.O.P CAMERON


Cameron have a weep hole
Cameron have 2 mechanical seal
" Cameron have intermediate flange "thick and widthh
365- well bore assist
"
" good seal
366- relief valve kommy
valve psi 3000 %100 psi 3300
valve psi 3000
366- relief valve kommy
valve psi 3000 %100 psi 3300
valve psi 3000

367- SPOOL B.O.P


Less expensive than rams
If damaged I can repair it or replacement
To localize possible erosion
To facilities , hang off , stripping , shear operations
368- packer lock float shoe
shoe track packer lock

369- B.O.P
Internal diameter
Rated working pressure
Desing
-
"- Single ram "R
"- Duple ram "RD
"- Drilling spool "SS
" - Triplex ram " RT
"- Annular "AA