Bhd
Tender Submission
Tender Created by: Bong Wei Jie
Tender Evaluation: Group Persistence Sdn.Bhd.
Client: Potato Corp
Project: Mars Rover Design
Date: 16 April 2017
Revision: 16 April 2017
Executive Summary
This tender has been written by Persistence Sdn.Bhd. in response to the
requirements of the designing company Potato Corp. The purpose of this tender is to
demonstrate to Potato Corp that the company, Persistence Sdn.Bhds understanding of
the design and construction method makes it the most suitable company to construct
the Mars Rover for them
The main reason why this tender should be taken into consideration is that
the tender evaluation criteria (TEC) set by Potato Corp have been perfectly matched
for Persistence Sdn.Bhd. The designers of Potato Corp require that the contracting
company have work experience and good performance in an engineering company or
have an active participation in engineering related club or societies. Persistence
Sdn.Bhd. have provided sources that could act as evidence that they have worked for
a certain company as part-time job for 3 months and they have also attended
engineering workshops hosted by big companies actively for the past 6 months until
they were forced to quit in order to further their studies.
The designers also do not have to worry as Persistence Sdn.Bhd. have the
relevant capabilities as required by them in the tender evaluation criteria (TEC). The
members of Persistence Sdn.Bhd. are not only well versed in skills, but they are also
known for their communication skills and perfect teamwork.
Persistence Sdn.Bhd. has a lot of faith in its members and it believes that the members
of Persistence Sdn.Bhd. can complete a Mars Rover of the highest quality within the
time given.
Table of Contents
1.0 Introduction..4
2.0 Design package review....5
2.1 Understanding of Design...6
2.2 Perspective on Construction Method7
2.3 Dimensional Constraints...8
2.4 Materials of Construction..9
2.5 Distance..10
2.6 Energy Source11
2.7 Ease of Use.12
2.8 Construction & Maintenance..13
2.9 Support14
2.10 Concerns & Solutions.15
3.0 Tender Evaluation Criteria.16
3.1 Time Management..17
3.2 Teamwork18
3.3 Organization Skills..19
3.4 Understanding.20
3.5 Safety..21
3.6 Communication Skills.22
4.0 Reference List....24
5.0 Appendices....25
Appendix A: Minutes of meeting..25
Appendix B: Meeting Agenda...26
Appendix C: Screenshots of Email Conversations27
Appendix D: List of Workload Distribution..............................28
Appendix E: List of Suggestions and Improvements 29
Appendix F: List of Safety Precaution..............................30
Appendix G: Result of ECS Unit...31
Appendix H: Screenshots of WhatsApp messages...32-34
Appendix I: Latest designers Stage 1 Design Package..35
Appendix J: Image of the workplace with protective gears & first-aid kits36
Appendix K: Certificate of Experience37
Appendix L: Time Management..38
Appendix M: Teamwork..39
Appendix N: Professionalism..........40
Appendix O: Understanding41
Appendix P: Communications.42
1.0 Introduction
This document contains Persistence Sdn.Bhd.s tender submission for
the construction of Potato Corps Mars Rover. This document has been written
in response to the criteria as defined by Potato Corps documents.
2.0 Design Package Review
A design review has been performed to ensure that Persistence
Sdn.Bhd. has a full and complete understanding of the project.
2.1 Understanding of Design
The design is based on using the China Iron Shelves as barriers in order to
protect the cargo. To further the protection of the cargo, wires were used
to cover the top of the Mars Rover and a transparent paper wrap was
wrapped around the vehicle. Sponge was used to cover the wheels so that
it can produce friction and absorb impact.
Total: 29.34
1) Wont the wooden board break due to too many holes drilled
into it? The holes drilled may also produce slight cracks and
may result in chain reaction in causing several cracks on the
wooden board due to the weight of the cargo and its parts.
Solution: Use 2 wooden boards instead of one and layer them
together.
2) Wont the #16 Gi wires shear away the wooden board as the
axle starts its motion? This may result in damaging the wooden
board and causing the entire Mars Rover to collapse.
Solution: Cover the holes using sponge and then sew the wire
through the sponge on the axle.
3) Isnt the wooden board too thin to be able to hold the cargo
and parts? The Mars Rover suffers a high risk of collapsing.
Solution: Use 2 wooden board instead of one and layer them
together or use a thicker board.
Addressing Criteria:
Persistence Sdn.Bhd. guarantees Potato Corp that the
contractors of Persistence Sdn.Bhd had already sent a softcopy of
the Minutes of Meeting (Refer to Appendix C) to the designers of
Potato Corp (Refer to Appendix A) and that the members of
Persistence Sdn.Bhd had attended the meeting held and proposed
by Potato Corp (Refer to Appendix A). This is further clearly
shown by the agenda items in the meeting agenda (refer to
Appendix B) and action items in the minutes of meeting (refer to
Appendix A)
3.2 Teamwork
Description of Criteria:
In order to complete a project smoothly, teamwork among
designers and contractors is one important aspect. Potato Corp will be
expecting contractors who work well as a team, not as an outstanding
individual. Each contractor should be able to contribute the same
amount of time during the construction progress. Also, working as a
team, each member should be independent and carry out works without
having reminded by others. Lastly, each member must be responsible
in playing their own part in the team and complete all tasks given
within the period given. Evidence should be given by listing down
everything stated above into the weekly progress reports. Potato Corps
will be expecting Persistence Sdn.Bhd. to distribute the amount of
work evenly among members and no free riders will be allowed as
marks will be awarded to each individual. (Description taken from
Potato Corps design package, refer to Appendix M)
Addressing Criteria:
Persistence Sdn.Bhd. guarantees that none of its contractors
are sloths and free riders and that they will be made sure that they are
earning their keep by list of work distributed.(Refer to Appendix D)
They will complete the work in time through their unparalleled
strengths in teamwork together.
Addressing Criteria:
Persistence Sdn.Bhd. fully assures Potato Corp that the
contractors of Persistence Sdn.Bhd. will not do anything such as
plagiarizing works of others or anything which will damage or
compromise the reputation of the company and the contractors of
Persistence Sdn.Bhd. fully understand the consequences of
plagiarizing as they have taken the academic integrity course study
and have passed the course with a minimum mark of 80%. A
contractor of Persistence Sdn.Bhd. have past experiences from a 3
month part time job at a certain engineering company and he has
also attended an engineering workshop hosted by a the same
company but he had to quit in both cases in order to further his
studies in which case, it is believed that these experiences will be
enough.
3.4 Understanding
Description of Criteria:
Potato Corp has implied that understanding between
contractors and designer is a crucial part, to ensure the outcome of
the product from the contractors is same as the idea of the
designer. Contractors are required to understand the design
package provided by the designer, summarize, and re-present it to
the designer to check for common understanding. Besides, after
understanding the design, contractors should be able to mention a
flaw of the design, and figure out a solution for the flaw and
discuss it with the designer. Furthermore, designers of Potato Corp
will ask 5 questions to the contractors regarding the design, where
contractors must answer all the questions correctly to prove that
they understand the design clearly. Contractors can prove that they
meet the criteria by having a presentation to show their
understanding and list down the suggestion that are useful to
improve the prototype. (Description taken from Potato Corps
design package, refer to Appendix O)
Addressing Criteria:
Persistence Sdn.Bhd. assures Potato Corp that the contractors of
Persistence Sdn.Bhd will be made sure that they did their
homework and that their progress will also be kept tracked at all
times so that the contractors will be able to do more than just
answering, they will also be able to detect the flaws in the design
and be able to give suggestions and improvements to the Mars
Rover. (Refer to Appendix E) Persistence Sdn.Bhd. will also
encourage its contractors to ask any questions should any doubt
regarding the vehicle arises.
3.5 Safety
Description of Criteria:
Potato Corp further implied that safety must be the priority of
contractors at all times. Potato Corp will not make any contract
with companies who does not put the safety of its contractors as its
priority. Potato Corp would also like the contractors to take first-
aid lesson courses if possible so that the contractors will be able to
handle an emergency situation more wisely should it happen.
Potato Corp also requires the contractors of Persistence Sdn.Bhd
to read and understand the safety manual provided by Potato Corp
in order to be able to tackle emergencies should it arise. Potato
Corp also expects the contractors of Persistence Sdn.Bhd. to work
in a place where there is a first-aid kit box standby ready and also
a telephone. It is also advisable by Potato Corp to work under
supervision of peers or seniors where they might be able to deal
with the situation more efficiently.
Addressing Criteria:
Persistence Sdn.Bhd assures Potato Corp that a contractor of
Persistence Sdn.Bhd. is well versed in dealing with emergency
situation as he have have past work experiences (Refer to
Appendix J) and it is assumed that he have learnt first-aid lesson
courses from his previous part time jobs (Refer to Appendix J) and
workshops (Refer to Appendix J). It is also assumed that a safety
handbook had been given to him during his work as a part-timer
(Refer to Appendix J) and that he fully understand what he should
do should an accident arise. Persistence Sdn.Bhd. will also make
sure that its contractors will be wearing protective gears such as
gloves and goggles during the construction of the project. The
contractors of Persistence Sdn.Bhd. will also be briefed on how to
use the protective gears and tools provided. (Refer to Appendix F)
The contractors of Persistence Sdn.Bhd will be working in a place
with protective gears and first-aid kits prepared and ready to use.
(Refer to Appendix J)
3.6 Communication Skills
Description of Criteria:
Potato Corp further explains that communication is very important
between designers and contractors. Contractors are required to
have good communication skills to avoid miscommunication
among designers and contractors. Besides, good communication
skills can avoid conflicts or misunderstanding during the
construction process. Contractors have to reply WhatsApp group or
text, check and reply email and communicate with designers when
there is problem during the construction process. As evidence,
contractors can provide the conversation in WhatsApp group or
email and also minutes of meetings after having a meeting with
designers. (Description taken from Potato Corps design package,
refer to Appendix P)
Addressing Criteria:
Persistence Sdn.Bhd. assures Potato Corp that the contractors of
Persistence Sdn.Bhd. are always alert and that they check their
inboxes every hour on the go (Refer to Appendix H and Appendix
C). The contractors of Persistence Sdn.Bhd are also perfectly
capable of communicating with each other in fluent English and
there is also a certificate (Refer to Appendix G). Each contractor of
Persistence Sdn.Bhd. will also notify each other should there be a
message missed by either one of the contractors.
5.0 Appendices
Appendix A: Minutes of Meeting
Appendix B: Meeting Agenda
To make clarifications on the design, give advice and suggestions in
order to make improvements. Meeting was held in discussion room 7
in library at 3.00 p.m. and ended at 4.00 p.m. on 7 April 2017
Appendix C: Screenshots of Email
Conversations
Appendix D: List of Workload
Distribution
Kabir Baig- Responsible for gathering of materials and helping team
members assemble the vehicle. He will also be responsible for
swapping out the faulty materials, should there be any at all.
Lo Joe Lerk- Will be responsible for overseeing the entire project and
asking the designers should there be any confusion regarding the
project. He will also be helping the other members with managing the
tools.
Bong Wei Jie- Has experience with most of the tools so he will be
leading the team with the construction work and also managing the
teams work.
Appendix K: Certificate of
Experience
Appendix L: Time Management
Appendix M: Teamwork
Appendix N: Professionalism
Appendix O: Understanding
Appendix P: Communications