You are on page 1of 10

5.

3 Hasil Akhir
5.3.1 Final Pit

Top View SW Isometric View

SE Isometric View Front View


5.3.2 Volume Sumber Daya

Top View SW Isometric View

SE Isometric View Front View


Volume Sumber Daya = 3.461.589,5257 m3

5.3.3 Volume Bahan Galian Tertambang dan Lapisan Penutup

SW Isometric View
Top View

SE Isometric View Front View


Volume Bahan Galian Tertambang dan Lapisan Penutup = 1.411.446,7359 m3

5.3.4 Volume Lapisan Penutup

Top View SW Isometric View

SE Isometric View Front View


Volume Lapisan Penutup = 79.877,1548 m3

5.3.5 Volume Bahan Galian Tertambang

Top View SW Isometric View

SE Isometric View Front View


Volume Bahan Galian Tertambang = 1.331.569,5811 m3

5.3.6 Mining Recovery ( Perolehan )

Diketahui :

Volume Sumber Daya = 3.461.589,5257 m3

Tonase Sumber Daya = 3.461.589,5257 m3x 2,8 Ton/m3

= 9.692.450,672 Ton

Volume Bahan Galian Tertambang = 1.331.569,5811 m3

Tonase Bahan Galian Tertambang = 1.331.569,5811 m3 x 2,8 Ton/m3

= 3.728.394,827 Ton

3.728 .394,827 Ton


Mining Recovery = 9.692.450,672 Ton x 100% = 38,4669982 %

You might also like