Project Works Schedule Overview

The document outlines a schedule for construction activities in different areas and zones of a main building and total rooms. It includes details on the number of rooms and levels in each zone, and the duration of activities like HVAC, electrical, and plumbing works. A total of 852 rooms across different levels and zones are scheduled for various construction activities over a total duration of 155 days.

Uploaded by

Javier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views84 pages

Project Works Schedule Overview

The document outlines a schedule for construction activities in different areas and zones of a main building and total rooms. It includes details on the number of rooms and levels in each zone, and the duration of activities like HVAC, electrical, and plumbing works. A total of 852 rooms across different levels and zones are scheduled for various construction activities over a total duration of 155 days.

Uploaded by

Javier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

AREA ZONE ACTIVITY DUR

MAIN BUILDING M1 (ZONE A-> ZONE G) 155

TOTAL ROOM 852

17 #NAME?

BALL ROOM - H/L SERVICES (17 NOS) #NAME?

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

130 #NAME?

82.31% 107 LEVEL-1 (ZONE C & E)-107 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

05/23/2017 SCHEDULE Page 1


AREA ZONE ACTIVITY DUR

ELECTRICAL WORKS

7.69% 10 LEVEL-2 (ZONE E)-10 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

2.31% 3 LEVEL-3 (ZONE E)-3 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

7.69% 10 LEVEL-5 (ZONE E)-10 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

05/23/2017 SCHEDULE Page 2


AREA ZONE ACTIVITY DUR

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

199 #NAME?

17.09% 34 LEVEL-1-34 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

7.54% 15 LEVEL-2-15 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

05/23/2017 SCHEDULE Page 3


AREA ZONE ACTIVITY DUR

12.06% 24 LEVEL-3-24 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

14.57% 29 LEVEL-4-29 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

28.14% 56 LEVEL-5-56 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

05/23/2017 SCHEDULE Page 4


AREA ZONE ACTIVITY DUR

ELECTRICAL WORKS

20.60% 41 LEVEL-6-41 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

24 #NAME?

16.67% 4 LEVEL 1 -4NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

16.67% 4 LEVEL 2-4NOS #NAME?

HVAC WORKS

05/23/2017 SCHEDULE Page 5


AREA ZONE ACTIVITY DUR

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

20.83% 5 LEVEL 3-5NOS #NAME?

05/23/2017 SCHEDULE Page 6


AREA ZONE ACTIVITY DUR

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

20.83% 5 LEVEL 4-5NOS #NAME?

HVAC WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

12.50% 3 LEVEL 5-3NOS #NAME?

HVAC WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

12.50% 3 LEVEL 6-3NOS #NAME?

HVAC WORKS

ELECTRICAL WORKS

05/23/2017 SCHEDULE Page 7


AREA ZONE ACTIVITY DUR

176 65

21.59% 38 LEVEL 1-38 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

9.66% 17 LEVEL 2-17 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

12.50% 22 LEVEL 3-22 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

05/23/2017 SCHEDULE Page 8


AREA ZONE ACTIVITY DUR

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

17.61% 31 LEVEL 4-31 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

23.30% 41 LEVEL 5-41 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

05/23/2017 SCHEDULE Page 9


AREA ZONE ACTIVITY DUR

15.34% 27 LEVEL 6-27 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

102

SHAFT F02,F01 #NAME?

SHAFT F03,F04 #NAME?

SHAFT F05,F06 #NAME?

SHAFT F07,F08 #NAME?

SHAFT M04,M05,M07,M08,M23 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

05/23/2017 SCHEDULE Page 10


AREA ZONE ACTIVITY DUR

ELECTRICAL WORKS

SHAFT M03,M22,M26,M27,M1 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

SHAFT M02,M09,M10,M12,M17,M19 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

SHAFT M20,M25,M30,M31,M32,M34 #NAME?

05/23/2017 SCHEDULE Page 11


AREA ZONE ACTIVITY DUR

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

SHAFT M10,M11,M18,M21,M27,M29 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

13 #NAME?

VILLA 4 #NAME?

VILLA 5 #NAME?

7.69% 1 VILLA 6 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

05/23/2017 SCHEDULE Page 12


AREA ZONE ACTIVITY DUR

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

30.77% 4 VILLA 1 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

30.77% 4 VILLA 2 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

30.77% 4 VILLA 3 #NAME?

05/23/2017 SCHEDULE Page 13


AREA ZONE ACTIVITY DUR

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

#NAME?

LEVEL 2 #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

#NAME?

SWIMMING POOL #NAME?

HVAC WORKS

05/23/2017 SCHEDULE Page 14


AREA ZONE ACTIVITY DUR

CHW SYSTEM WORKS

ELECTRICAL WORKS

CAR PARK #NAME?

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

POOL BAR GRILL #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

MAINTENANCE BUILDING #NAME?

HVAC WORKS

CHW SYSTEM WORKS

05/23/2017 SCHEDULE Page 15


AREA ZONE ACTIVITY DUR

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

VILLA HSKP/LINEN ROOM #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

LPG UNDERGROUND STORAGE PLANT #NAME?

HVAC WORKS

FF PIPING

SECURITY POINT #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

05/23/2017 SCHEDULE Page 16


AREA ZONE ACTIVITY DUR

ELECTRICAL WORKS

CHILLER YARD #NAME?

HVAC WORKS

CHW SYSTEM WORKS

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

EXTERNAL SERVICES #NAME?

HVAC WORKS

CHW SYSTEM WORKS

FF PIPING

DRAINAGE & WATER SUPPLY WORKS

ELECTRICAL WORKS

57 #NAME?

47.37% 27 LEVEL 1-27 NOS #NAME?

HVAC WORKS

05/23/2017 SCHEDULE Page 17


AREA ZONE ACTIVITY DUR

CHW SYSTEM WORKS

ELECTRICAL WORKS

10.53% 6 LEVEL 2-6 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

8.77% 5 LEVEL 3-5 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

10.53% 6 LEVEL4-5 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

12.28% 7 LEVEL 5-7 NOS #NAME?

05/23/2017 SCHEDULE Page 18


AREA ZONE ACTIVITY DUR

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

7.02% 4 LEVEL 6-4 NOS #NAME?

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

3.51% 2 LEVEL 7-2 NOS 9

HVAC WORKS

CHW SYSTEM WORKS

ELECTRICAL WORKS

05/23/2017 SCHEDULE Page 19


PROJECT
WORKS SCHEDULE

START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Feb/16 30/Jul/16

1/Apr/16 30/Jul/16

1/Apr/16 30/Apr/16

1/Apr/16 30/Apr/16 PF

1/Apr/16 30/Apr/16 PL

1/Apr/16 30/Apr/16 EL

1/Apr/16 30/Jun/16

1/Apr/16 1/Jun/16

1/Apr/16 1/Jun/16 DW

1/Apr/16 1/Jun/16 PF

1/Apr/16 1/Jun/16 PF

1/Apr/16 1/Jun/16 PL

05/23/2017 SCHEDULE Page 20


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Apr/16 1/Jun/16 EL

14/May/16 13/Jun/16

14/May/16 13/Jun/16 DW

14/May/16 13/Jun/16 PF

14/May/16 13/Jun/16 PF

14/May/16 13/Jun/16 PL

14/May/16 13/Jun/16 EL

21/May/16 10/Jun/16

21/May/16 10/Jun/16 DW

21/May/16 10/Jun/16 PF

21/May/16 10/Jun/16 PL

21/May/16 10/Jun/16 EL

26/May/16 30/Jun/16

26/May/16 30/Jun/16 DW

26/May/16 30/Jun/16 PF

05/23/2017 SCHEDULE Page 21


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

26/May/16 30/Jun/16 PL

26/May/16 30/Jun/16 EL

1/Apr/16 30/Jul/16

1/Apr/16 12/May/16

1/Apr/16 12/May/16 DW

1/Apr/16 12/May/16 PF

1/Apr/16 12/May/16 PF

1/Apr/16 12/May/16 PL

1/Apr/16 12/May/16 EL

30/Apr/16 15/May/16

30/Apr/16 15/May/16 DW

30/Apr/16 15/May/16 PF

30/Apr/16 15/May/16 PF

30/Apr/16 15/May/16 PL

30/Apr/16 15/May/16 EL

05/23/2017 SCHEDULE Page 22


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

10/May/16 9/Jun/16

10/May/16 9/Jun/16 DW

10/May/16 9/Jun/16 PF

10/May/16 9/Jun/16 PF

10/May/16 9/Jun/16 PL

10/May/16 9/Jun/16 EL

25/May/16 29/Jun/16

25/May/16 29/Jun/16 DW

25/May/16 29/Jun/16 PF

25/May/16 29/Jun/16 PL

25/May/16 29/Jun/16 EL

5/Jun/16 30/Jul/16

5/Jun/16 30/Jul/16 DW

5/Jun/16 30/Jul/16 PF

5/Jun/16 30/Jul/16 PL

05/23/2017 SCHEDULE Page 23


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

5/Jun/16 30/Jul/16 EL

25/Jun/16 30/Jul/16

25/Jun/16 30/Jul/16 DW

25/Jun/16 30/Jul/16 PF

25/Jun/16 30/Jul/16 PL

25/Jun/16 30/Jul/16 EL

2/Apr/16 28/May/16

3/Apr/16 30/Apr/16

3/Apr/16 30/Apr/16 DW

3/Apr/16 30/Apr/16 PF

3/Apr/16 30/Apr/16 PF

3/Apr/16 30/Apr/16 PL

3/Apr/16 30/Apr/16 EL

3/Apr/16 30/Apr/16

3/Apr/16 30/Apr/16 DW

05/23/2017 SCHEDULE Page 24


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

3/Apr/16 30/Apr/16 PF

3/Apr/16 30/Apr/16 PL

3/Apr/16 30/Apr/16 EL

1/May/16 28/May/16

05/23/2017 SCHEDULE Page 25


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/May/16 28/May/16 DW

1/May/16 28/May/16 PF

1/May/16 28/May/16 PL

1/May/16 28/May/16 EL

1/May/16 28/May/16

1/May/16 28/May/16 DW

1/May/16 28/May/16 PL

1/May/16 28/May/16 EL

2/Apr/16 20/Apr/16

2/Apr/16 20/Apr/16 DW

2/Apr/16 20/Apr/16 PL

2/Apr/16 20/Apr/16 EL

2/Apr/16 20/Apr/16

2/Apr/16 20/Apr/16 DW

2/Apr/16 20/Apr/16 EL

05/23/2017 SCHEDULE Page 26


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Apr/16 15/Jun/16

15/May/16 15/Jun/16

15/May/16 15/Jun/16 DW

15/May/16 15/Jun/16 PF

15/May/16 15/Jun/16 PF

15/May/16 15/Jun/16 PL

15/May/16 15/Jun/16 EL

15/May/16 15/Jun/16

15/May/16 15/Jun/16 DW

15/May/16 15/Jun/16 PF

15/May/16 15/Jun/16 PL

15/May/16 15/Jun/16 EL

4/Apr/16 5/May/16

4/Apr/16 5/May/16 DW

4/Apr/16 5/May/16 PF

05/23/2017 SCHEDULE Page 27


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

4/Apr/16 5/May/16 PF

4/Apr/16 5/May/16 PL

4/Apr/16 5/May/16 EL

26/Apr/16 25/May/16

26/Apr/16 25/May/16 DW

26/Apr/16 25/May/16 PF

26/Apr/16 25/May/16 PF

26/Apr/16 25/May/16 PL

26/Apr/16 25/May/16 EL

1/Apr/16 30/Apr/16

1/Apr/16 30/Apr/16 DW

1/Apr/16 30/Apr/16 PF

1/Apr/16 30/Apr/16 PF

1/Apr/16 30/Apr/16 PL

1/Apr/16 30/Apr/16 EL

05/23/2017 SCHEDULE Page 28


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

13/Apr/16 15/May/16

13/Apr/16 15/May/16 DW

13/Apr/16 15/May/16 PF

13/Apr/16 15/May/16 PF

13/Apr/16 15/May/16 PL

13/Apr/16 15/May/16 EL

1/Apr/16 29/Jul/16

1/Apr/16 16/Apr/16 PF

4/Apr/16 26/Apr/16 PF

14/Apr/16 7/May/16 PF

24/Apr/16 16/May/16 PF

1/Apr/16 24/Apr/16

1/Apr/16 24/Apr/16 DW

1/Apr/16 24/Apr/16 PF

1/Apr/16 24/Apr/16 PL

05/23/2017 SCHEDULE Page 29


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Apr/16 24/Apr/16 EL

10/Apr/16 18/May/16

10/Apr/16 18/May/16 DW

10/Apr/16 18/May/16 PF

10/Apr/16 18/May/16 PL

10/Apr/16 18/May/16 EL

3/May/16 11/Jun/16

3/May/16 11/Jun/16 DW

3/May/16 11/Jun/16 PF

3/May/16 11/Jun/16 PL

3/May/16 11/Jun/16 EL

27/May/16 5/Jul/16

05/23/2017 SCHEDULE Page 30


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

27/May/16 5/Jul/16 DW

27/May/16 5/Jul/16 PF

27/May/16 5/Jul/16 PL

27/May/16 5/Jul/16 EL

20/Jun/16 29/Jul/16

20/Jun/16 29/Jul/16 DW

20/Jun/16 29/Jul/16 PF

20/Jun/16 29/Jul/16 PL

20/Jun/16 29/Jul/16 EL

1/Feb/16 25/May/16

1/Feb/16 7/Mar/16

8/Mar/16 15/Apr/16

1/Apr/16 30/Apr/16

1/Apr/16 30/Apr/16 DW

1/Apr/16 30/Apr/16 PF

05/23/2017 SCHEDULE Page 31


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Apr/16 30/Apr/16 PL

1/Apr/16 30/Apr/16 EL

10/Apr/16 15/May/16

10/Apr/16 15/May/16 DW

10/Apr/16 15/May/16 PF

10/Apr/16 15/May/16 PF

10/Apr/16 15/May/16 PL

10/Apr/16 15/May/16 EL

10/Apr/16 15/May/16

10/Apr/16 15/May/16 DW

10/Apr/16 15/May/16 PF

10/Apr/16 15/May/16 PF

10/Apr/16 15/May/16 PL

10/Apr/16 15/May/16 EL

21/Apr/16 25/May/16

05/23/2017 SCHEDULE Page 32


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

21/Apr/16 25/May/16 DW

21/Apr/16 25/May/16 PF

21/Apr/16 25/May/16 PF

21/Apr/16 25/May/16 PL

21/Apr/16 25/May/16 EL

10/Jun/16 30/Jul/16

10/Jun/16 30/Jul/16

10/Jun/16 30/Jul/16 DW

10/Jun/16 30/Jul/16 PF

10/Jun/16 30/Jul/16 PF

10/Jun/16 30/Jul/16 PL

10/Jun/16 30/Jul/16 EL

1/May/16 25/Jul/16

1/May/16 5/Jun/16

1/May/16 5/Jun/16 DW

05/23/2017 SCHEDULE Page 33


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/May/16 5/Jun/16 PF

1/May/16 5/Jun/16 EL

6/Jun/16 6/Jul/16

6/Jun/16 6/Jul/16 DW

6/Jun/16 6/Jul/16 PF

6/Jun/16 6/Jul/16 EL

21/May/16 20/Jun/16

21/May/16 20/Jun/16 DW

21/May/16 20/Jun/16 PF

21/May/16 20/Jun/16 PF

21/May/16 20/Jun/16 PL

21/May/16 20/Jun/16 EL

21/Jun/16 21/Jul/16

21/Jun/16 21/Jul/16 DW

21/Jun/16 21/Jul/16 PF

05/23/2017 SCHEDULE Page 34


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

21/Jun/16 21/Jul/16 PF

21/Jun/16 21/Jul/16 PL

21/Jun/16 21/Jul/16 EL

5/Jul/16 25/Jul/16

5/Jul/16 25/Jul/16 DW

5/Jul/16 25/Jul/16 PF

5/Jul/16 25/Jul/16 PL

5/Jul/16 25/Jul/16 EL

11/May/16 17/Jun/16

11/May/16 17/Jun/16 DW

11/May/16 17/Jun/16 PF

7/Jul/16 27/Jul/16

7/Jul/16 27/Jul/16 DW

7/Jul/16 27/Jul/16 PF

7/Jul/16 27/Jul/16 PL

05/23/2017 SCHEDULE Page 35


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

21/Jun/16 11/Jul/16 EL

30/Apr/16 29/Jun/16

30/Apr/16 29/Jun/16 DW

30/Apr/16 29/Jun/16 PF

30/Apr/16 29/Jun/16 PL

30/Apr/16 29/Jun/16 EL

5/Apr/16 24/Jul/16

5/Apr/16 24/Jul/16 DW

5/Apr/16 24/Jul/16 PF

5/Apr/16 24/Jul/16 PF

5/Apr/16 24/Jul/16 PL

5/Apr/16 24/Jul/16 EL

1/Apr/16 14/Jun/16

22/Apr/16 14/Jun/16

22/Apr/16 14/Jun/16 DW

05/23/2017 SCHEDULE Page 36


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

22/Apr/16 14/Jun/16 PF

22/Apr/16 14/Jun/16 EL

7/May/16 22/May/16

7/May/16 22/May/16 DW

7/May/16 22/May/16 PF

7/May/16 22/May/16 EL

17/May/16 1/Jun/16

17/May/16 1/Jun/16 DW

17/May/16 1/Jun/16 PF

17/May/16 1/Jun/16 EL

27/May/16 11/Jun/16

27/May/16 11/Jun/16 DW

27/May/16 11/Jun/16 PF

27/May/16 11/Jun/16 EL

1/Apr/16 21/Apr/16

05/23/2017 SCHEDULE Page 37


START FINISH PRODUCTIVITY TOTAL QTY COMPLETED QTY BALANCE QTY TRADE

1/Apr/16 21/Apr/16 DW

1/Apr/16 21/Apr/16 PF

1/Apr/16 21/Apr/16 EL

11/Apr/16 26/Apr/16

11/Apr/16 26/Apr/16 DW

11/Apr/16 26/Apr/16 PF

11/Apr/16 26/Apr/16 EL

27/Apr/16 7/May/16

27/Apr/16 7/May/16 DW

27/Apr/16 7/May/16 PF

27/Apr/16 7/May/16 EL

05/23/2017 SCHEDULE Page 38


16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

2
2 2 2 2

4
4 4 4 4

22
22 22 22 22

15
15 15 15 15 15 15 15 15 15

4
4 4 4 4 4 4 4 4 4

2
2 2 2 2 2 2 2 2 2

10
10 10 10 10 10 10 10 10 10

05/23/2017 SCHEDULE Page 39


16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

22
22 22 22 22 22 22 22 22 22

4
4 4 4 4 4

1
1 1 1 1 1

1
1 1 1 1 1

2
2 2 2 2 2

6
6 6 6 6 6

1
1 1 1

1
1 1 1

1
1 1 1

2
2 2 2

4
4 4 4 4 4

1
1 1 1 1 1
05/23/2017 SCHEDULE Page 40
16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

1
1 1 1 1 1

6
6 6 6 6 6

6
6 6 6 6 6 6

2
2 2 2 2 2 2

1
1 1 1 1 1 1

2
2 2 2 2 2 2

10
10 10 10 10 10 10

4
4 4 4

2
2 2 2

1
1 1 1

1
1 1 1

4
4 4 4
05/23/2017 SCHEDULE Page 41
16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

7
7 7 7 7

2
2 2 2 2

1
1 1 1 1

1
1 1 1 1

10
10 10 10 10

10
10 10 10 10 10

1
1 1 1 1 1

2
2 2 2 2 2

12
12 12 12 12 12

13
13 13 13

2
2 2 2

1
1 1 1
05/23/2017 SCHEDULE Page 42
1
3
1
1
1
1
4
2

10
20
10
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

1
3
1
1
1
1
11-Apr-16

1
3
1
1
1
1
18-Apr-16

1
3
1
1
1
1
25-Apr-16

2-May-16

SCHEDULE
9-May-16

16-May-16

23-May-16

30-May-16

6-Jun-16

13-Jun-16
10

20-Jun-16
10

4
2

27-Jun-16
10
20
10

Page 43
3
1
1
MAN

05/23/2017
POWER
REMARKS

4-Apr-16
3
1
1

11-Apr-16
3
1
1

18-Apr-16
3
1
1

25-Apr-16

2-May-16

SCHEDULE
9-May-16

16-May-16

23-May-16

30-May-16

6-Jun-16

13-Jun-16

20-Jun-16

27-Jun-16
Page 44
2
1
2
1
1
3
1
1
3
1
1
1
MAN

05/23/2017
POWER
REMARKS

2
1
2
1
1
4-Apr-16

2
1
2
1
1
11-Apr-16

2
1
2
1
1
18-Apr-16

25-Apr-16

2-May-16

SCHEDULE
3
1
1
3
1
1
1

9-May-16
3
1
1
3
1
1
1

16-May-16
3
1
1
3
1
1
1

23-May-16

30-May-16

6-Jun-16

13-Jun-16

20-Jun-16

27-Jun-16
Page 45
2
7
4
1
1
6
9
3
1
2
13
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

2
7
11-Apr-16

2
7
18-Apr-16

2
7
25-Apr-16

2
7
2-May-16

SCHEDULE
9-May-16

16-May-16
4
1
1
6
9
3
1
2

23-May-16
13

4
1
1
6
9
3
1
2

30-May-16
13

4
1
1
6
9
3
1
2

6-Jun-16
13

4
1
1
6
9
3
1
2

13-Jun-16
13

20-Jun-16

27-Jun-16
Page 46
16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

1
1 1 1 1

1
1 1 1 1

5
5 5 5 5

10
10 10 10 10

2
2 2 2 2

1
1 1 1 1

3
3 3 3 3

8
8 8 8 8

14
14 14 14 14

1
1 1 1 1

1
1 1 1 1

3
3 3 3 3

10
10 10 10 10
05/23/2017 SCHEDULE Page 47
8
1
5
3
3
3
3
7
2
1
1
9
MAN

05/23/2017
POWER
REMARKS

8
1
5
3
4-Apr-16

8
1
5
3
3
11-Apr-16

8
1
5
3
3
7
2
1
1
9

18-Apr-16

8
1
5
3
3
7
2
1
1
9

25-Apr-16

3
3
7
2
1
1
9

2-May-16

SCHEDULE
3
7
2
1
1
9

9-May-16
3
7
2
1
1
9

16-May-16

23-May-16

30-May-16

6-Jun-16

13-Jun-16

20-Jun-16

27-Jun-16
Page 48
3
9
2
3
8
1
5
1

10
MAN

05/23/2017
POWER
REMARKS

4-Apr-16
1

11-Apr-16
3
8
1
5
1

18-Apr-16
3
8
1
5
1

25-Apr-16
3
8
1
5

2-May-16

SCHEDULE
3
9
2
3
8
1
5

9-May-16
10

3
9
2
3
8
1
5

16-May-16
10

3
9
2

23-May-16
10

3
9
2

30-May-16
10

3
9
2

6-Jun-16
10

13-Jun-16

20-Jun-16

27-Jun-16
Page 49
1
6
3
9
2
3
9
2

10
10
MAN

05/23/2017
POWER

Completed
Completed
REMARKS

1
6
4-Apr-16

1
6
11-Apr-16

1
6
18-Apr-16

1
6
25-Apr-16

2-May-16

SCHEDULE
9-May-16

16-May-16

23-May-16
3
9
2

30-May-16
10

3
9
2

6-Jun-16
10

3
9
2

13-Jun-16
10

3
9
2

20-Jun-16
10

3
9
2
3
9
2

27-Jun-16
10
10

Page 50
8
7
1
1
6
8
7
1
1
6
2
2
MAN

05/23/2017
POWER
REMARKS

2
2

4-Apr-16
2
2

11-Apr-16

8
7
1
1
6
8
7
1
1
6
2
2

18-Apr-16

8
7
1
1
6
8
7
1
1
6
2
2

25-Apr-16

8
7
1
1
6
8
7
1
1
6

2-May-16

SCHEDULE
8
7
1
1
6
8
7
1
1
6

9-May-16

8
7
1
1
6
8
7
1
1
6

16-May-16

23-May-16

30-May-16

6-Jun-16

13-Jun-16

20-Jun-16

27-Jun-16
Page 51
1
4
8
7
1
1
6

16
20
12
25
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

11-Apr-16

18-Apr-16
8
7
1
1
6

25-Apr-16
8
7
1
1
6

2-May-16

SCHEDULE
1
8
7
1
1
6

9-May-16

1
8
7
1
1
6

16-May-16

1
8
7
1
1
6

23-May-16
1

30-May-16
1

6-Jun-16
4

13-Jun-16
16
20
12
25

20-Jun-16
16
20
12
25

27-Jun-16
16
20
12
25

Page 52
1
2
5
3
1
1
2
5
1
5
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

11-Apr-16

18-Apr-16

25-Apr-16

2-May-16

SCHEDULE
5
0

9-May-16
5
0

16-May-16
5
3
1
1
2
5
0

23-May-16
5
3
1
1
2
5
0

30-May-16
5
3
1
1
2
5
0

6-Jun-16
5
3
1
1
2
5
0
1

13-Jun-16
5
3
1
1
2
5
0
1

20-Jun-16
1
2
5
0
1

27-Jun-16
Page 53
3
1
2
1
4
3
1
3
3
1

10
10
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

11-Apr-16

18-Apr-16

25-Apr-16

2-May-16

SCHEDULE
9-May-16
1
4

16-May-16
1
4

23-May-16
1
4

30-May-16
1
4

6-Jun-16
1
4

13-Jun-16

20-Jun-16
3
1

27-Jun-16
10

Page 54
16-May-16

23-May-16

30-May-16
11-Apr-16

18-Apr-16

25-Apr-16

13-Jun-16

20-Jun-16

27-Jun-16
2-May-16

9-May-16
4-Apr-16

6-Jun-16
MAN
REMARKS
POWER

5
5

13
13.33 13.33 13.33 13.33 13.33 13.33 13.33 13.33 13.33

4
4 4 4 4 4 4 4 4 4

3
3 3 3 3 3 3 3 3 3

7
7 7 7 7 7 7 7 7 7

14
14 14 14 14 14 14 14 14 14 14 14 14

5
5 5 5 5 5 5 5 5 5 5 5 5

6
6 6 6 6 6 6 6 6 6 6 6 6

12
12 12 12 12 12 12 12 12 12 12 12 12

28
28 28 28 28 28 28 28 28 28 28 28 28

4
4 4 4 4 4 4 4 4
05/23/2017 SCHEDULE Page 55
7
1
2
6
1
2
7
1
2
1

20
MAN

05/23/2017
POWER
REMARKS

4-Apr-16

11-Apr-16

18-Apr-16
1

25-Apr-16
20
1

2-May-16
20

SCHEDULE
7
1
2
1

9-May-16
20

7
1
2
1

16-May-16
20

6
1
2
7
1
2
1

23-May-16
20

7
1
2
6
1
2
1

30-May-16
20

7
1
2
1

6-Jun-16
20
1

13-Jun-16
20

20-Jun-16

27-Jun-16
Page 56
2
1
1
5
1
2
8
1
3
MAN

05/23/2017
POWER
REMARKS

8
1
3

4-Apr-16
8
1
3

11-Apr-16
5
1
2
8
1
3

18-Apr-16
5
1
2

25-Apr-16

2
1
1

2-May-16

SCHEDULE
9-May-16

16-May-16

23-May-16

30-May-16

6-Jun-16

13-Jun-16

20-Jun-16

27-Jun-16
Page 57
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 58
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 59
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 60
05/23/2017
1
2
4-Jul-16

13

1
2
11-Jul-16

13

1
2
18-Jul-16

13

SCHEDULE
1
2
25-Jul-16

13
1-Aug-16

Page 61
1-Aug-16
11-Jul-16

18-Jul-16

25-Jul-16
4-Jul-16
10 10 10 10

20 20 20 20

2 2 2 2

4 4 4 4

10 10 10 10

05/23/2017 SCHEDULE Page 62


05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 63
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 64
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 65
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 66
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 67
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 68
1-Aug-16
11-Jul-16

18-Jul-16

25-Jul-16
4-Jul-16
10

10 10 10 10

2 2 2 2

9 9 9 9

3 3 3 3

05/23/2017 SCHEDULE Page 69


05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 70
1-Aug-16
11-Jul-16

18-Jul-16

25-Jul-16
4-Jul-16
25 25 25 25

4 4 4 4

12 12 12 12

20 20 20 20

16 16 16 16

05/23/2017 SCHEDULE Page 71


05/23/2017
1
2
5
0
1

4-Jul-16

1
2
11-Jul-16

1
2
18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 72
1-Aug-16
11-Jul-16

18-Jul-16

25-Jul-16
4-Jul-16
1 1 1

3 3 3

10 10 10

3 3 3

1 1 1

3 3 3

10 10 10

2 2 2

1 1 1

3 3 3
05/23/2017 SCHEDULE Page 73
1-Aug-16
11-Jul-16

18-Jul-16

25-Jul-16
4-Jul-16
5 5

14 14 14 14

5 5 5 5

6 6 6 6

12 12 12 12

28 28 28 28

05/23/2017 SCHEDULE Page 74


05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 75
05/23/2017
4-Jul-16

11-Jul-16

18-Jul-16

SCHEDULE
25-Jul-16

1-Aug-16

Page 76
MANPOWER

450

400

350

160
165 154
300 156 155
149 140 131
115

250 127
90
92 92 87
118 77
74
200 73 57 64
75 57 57
69 63

47 58
51 55 55
150 52
79 45

122 123
100 107 106 113 116 122 122
102
30 105 92 95 89 89 87
74

50
51

47 49 50 47 50 45 43 47 43
39 36 39 37 37 37 35
19
0

MANPOWER HISTOGRM Page 77


DS WS
3.00% 3.00% 2 5
0 0
0 0
0 0
12.00% 10.00% 9 15
9.88% 8.23% 7 12
0 0
0 0
0 0
0 0
0.92% 0.77% 1 1
0 0
0 0
0 0
0 0
0.28% 0.23% 0 0
0 0
0 0
0 0
0 0
0.92% 0.77% 1 1
0 0
0 0
0 0
0 0
3.00% 6.00% 2 9
0.01 0.01 0 2
0 0
0 0
0 0
0 0
0.23% 0.45% 0 1
0 0
0 0
0 0
0 0
0.36% 0.72% 0 1
0 0
0 0
0 0
0 0
0.44% 0.87% 0 1
0 0
0 0
0 0
0 0
0.84% 1.69% 1 3
0 0
0 0
0 0
0.62% 1.24% 0 2
0 0
0 0
0 0
0 0
3.00% 2.00% 2 3
0.500% 0.333% 0 1
0 0
0 0
0 0
0 0
0.50% 0.33% 0 1
0 0
0 0
0 0
0 0
0.63% 0.42% 0 1
0 0
0 0
0 0
0 0
0.63% 0.42% 0 1
0 0
0 0
0 0
0.38% 0.25% 0 0
0 0
0 0
0 0
0 0
0.38% 0.25% 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
5.00% 6.00% 4 9
1.08% 1.30% 1 2
0 0
0 0
0 0
0 0
0.48% 0.58% 0 1
0 0
0 0
0 0
0.63% 0.75% 0 1
0 0
0 0
0 0
0 0
0.88% 1.06% 1 2
0 0
0 0
0 0
0 0
1.16% 1.40% 1 2
0 0
0 0
0 0
0 0
0.77% 0.92% 1 1
0 0
0 0
0 0
0 0
20.00% 18.00% 15 27
0 0
0 0
0 0
0 0
3.50% 3.35% 3 5
0 0
0 0
0 0
3.50% 3.35% 3 5
0 0
0 0
0 0
4.20% 3.90% 3 6
0 0
0 0
0 0
4.20% 3.90% 3 6
0 0
0 0
0 0
4.20% 3.90% 3 6
0 0
0 0
0 0
10.00% 10.00% 7 15
0 0
0 0
0.77% 0.77% 1 1
0 0
0 0
0 0
3.08% 3.08% 2 5
0 0
0 0
0 0
3.08% 3.08% 2 5
0 0
0 0
0 0
0 0
3.08% 3.08% 2 5
0 0
0 0
0 0
0 0
7.00% 30.00% 5 45
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2.00% 1.00% 1 2
0 0
0 0
0 0
1.00% 1.00% 1 2
0 0
0 0
0 0
1.00% 1.00% 1 2
0 0
0 0
0 0
0 0
0 0
0 0
1.00% 1.00% 1 2
0 0
0 0
0 0
1.00% 1.00% 1 2
0 0
0 0
0 0
31.00% 10.00% 23 15

100.00% 100.00% 74 151


lighting system(wiring) small power cables

zone A 10 10 5

boh 20 20 20

foh 230 30 30 5

suites 5 5 2

abortive

corridor 15 15 5

shaft 0 0 7

villas 5 5 5

plant room 4 4 5

external 8 8 41

electrical 3 3 5
100 100 100
containment equipment installation

5 7

20 17

5 13

2 3

5 5

5 10

41 3

5 42
100 100