Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 18-Jun-2017 Sunday No. of Day Report No. DPR- 648

Proj Start Date 2014 Contract Period 1 Year Calendar Day AM PM Fine
Weather
Estimate Completion Date 14-Nov-2017 Remain Period 150 Calendar Day 6~8 8~10 10 ~12 12~2 2~4 4~6 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store Driver Surveyer Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 1 1 3 2 31 20 37 67
Steel Roofing D&W Ceiling Water
Trades Scaffolder Painter Aluminium Total
Erector worker Installer worker Proofing
Today 4 167

Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Excavator 60 Ton Crane Car Crane
Dozer 50 Ton Crane 13 Tons Back Hole 1
1.5 Ton Roller 25 Ton Crane Rummer 1
Boom Lift Generator Truck
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total
Sand (river) suds 1.13

FO-OP-01 REV-00 Page: 1/3


Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 18-Jun-2017 Sunday No. of Day Report No.
Test Item Remarks
Sampl
e
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT Conducted
HSE Waste Plan Management For Construction Recycling.
728556 0 0 0 0 0 By Safety Officer

Works Carried out Details


Trades Of Work Location Remark
I Block(A) F&B Building
1 Demolition the Brick Wall at 1st Floor In Progress
Kalzip Wall Clading installation. In Progress
II Block(B) Aquarium Building
1 Formwork installation & Rebar Fixing work For 2nd Floor Beam. (GL:B9 to B13') In Progress
2 Formwork installation For Roof Beam (37.85m Level) In Progress
3 Formworkinstallation For Stair B-4 & Lift B-4 In Progress
4 Rebar Fixing For Stair B-4 In Progress

III External Work


1 Brick Work & Casting Concrete For Retaining Wall (Near Block A)

III Other Work


1 Cleaning Work & Replace the Material at Block A (1st Floor)
2 Broken Brick Laying For Site Pass Way
Special Event
Visitors Site
Purpose
on Site Instruction
Project Manager
FO-OP-01 REV-00 Project Engineer Prepare By: Site EngineerPage: 2/3
Daily Report

Project Name: Myanmar Aquarium Project

Name Name Sai Thing Nun Name Lin Naing Soe


Project Code: 4YG - 04700 Report Date : 18-Jun-2017 Sunday No. of Day Report No.
Signature Signature Signature

Rebar fixing & Formwork installation at 2nd Floor Beam&Slab Formwork installation For Stair B-4 Casting Concrete For Retaining Wall

Re- excavation For Old Drain Broken Brick Laying For Site Pass Way

FO-OP-01 REV-00 Page: 3/3