Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 12-Jun-2017 Monday No. of Day Report No. DPR- 642

Proj Start Date 2014 Contract Period 1 Year Calendar Day AM PM Fine
Weather
Estimate Completion Date 14-Nov-2017 Remain Period 156 Calendar Day 6~8 8~10 10 ~12 12~2 2~4 4~6 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store Driver Surveyer Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 3 1 1 3 2 1 14 8 35 67 3
Steel Roofing D&W Ceiling Water
Trades Scaffolder Painter Aluminium Total
Erector worker Installer worker Proofing
Today 4 143

Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Excavator 60 Ton Crane Car Crane
Dozer 50 Ton Crane Folk Lift
1.5 Ton Roller 25 Ton Crane Rummer 1
Boom Lift Generator Truck
Material Delivery On Site
Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total

FO-OP-01 REV-00 Page: 1/6


Daily Report

Project Name: Myanmar Aquarium Project

Project Code: 4YG - 04700 Report Date : 12-Jun-2017 Monday No. of Day Report No.
Test Item Remarks
Sampl
e
LTI Free Day UA,UC Near Miss FAI MTC LTA Daily TBT Conducted
HSE Tip for being in the rainy season
718212 0 0 0 0 0 By Safety Officer

Works Carried out Details


Trades Of Work Location Remark
I Block(A) F&B Building
1 Demolition the Brick Wall at 1st Floor In Progress
2 Kalzip Wall Clading installation. In Progress
II Block(B) Aquarium Building
1 Formwork installation & Rebar Fixing work For 2nd Floor Beam. (GL:B9 to B13') In Progress
2 Rebar Fixing Formwork installation For Roof Beam (37.85m Level) In Progress
3 Rebar installation For Main Fish Tank (1st Floor to 2nd Floor) In Progress
4 Rebar installation For Fish Tank Exhibit 1.3/Exhibit - 1.2 In Progress
5 Formwork installation For Lift B-4 & B-2 In Progress
6 Removing Formwork For 500 offset Slab at Basement Office In Progress

III External Work


1 Excavation Work ForRetaining Wall (Near Block - A) In Progress

IV Other Work
1 Cleaning Work at Septic Tank In Progress

Special Event
Visitors Site
Purpose
on Site Instruction
Project Manager
FO-OP-01 REV-00 Project Engineer Prepare By: Site EngineerPage: 2/6
Daily Report

Project Name: Myanmar Aquarium Project

Name Name Sai Thing Nun Name Lin Naing Soe


Project Code: 4YG - 04700 Report Date : 12-Jun-2017 Monday No. of Day Report No.
Signature Signature Signature

Rebar fixing & Formwork installation at 2nd Floor Beam&Slab Formwork installation at Main Fish Tank Rebar Fixing for Exhibit 1.3

Kalzip Wall Clading installaton Formwork For Lift B-4