You are on page 1of 7

Project :

CONCRETE BEAM ANALYSIS Building :


Date :
A. STRUCTURE MATERIAL
Fc' = K-400 Fs = BJTD-40 Ec = 27081.137 MPa
Fy = BJTD-40 Es = 200000 MPa

B. BEAM DATA
L = 9 m b = 350 mm .L (E) = 25 mm .S (M)
Lx = m d' = 40 mm .L (M) = 25 mm S (E)
h = 700 mm d = 634.500 mm .S (E) = 13 mm S (M)

C. ETABS OUTPUT
1. End 2. Mid
Flexural reinforcement for moment (M3) Flexural reinf
Mu-top = 47 tm Mu+top
Mu bottom = 24.000
+
tm Mu-bottom
Asreq = mm2 Asreq
As'req = mm2 As'req

Shear reinforcement for shear (V2) Shear reinfor


Vu- = ton Vu+
(Av/s)req = 1.281 (Av/s)req

D. STRUKTUR ANALYSIS
1. Beam section analysis (End) 2. Beam secti
Check flexural reinforcemenet (rebar) Check flexur
Asdes = 2645.503 Asdes =
As = 3040.200 6 - D 25 As =
As' = 0.000 0 - D 25 As' =

Control Control
Astmin = 799.740 mm2 < As . . . OK Astmin =
As = 3040.200 mm2 6 - D 25 As =
As' = 1520.1 mm2 3 - D 25 As' =

Check location of netral axis Check locatio


Ast = 4560.300 mm2 Ast =
1 = 0.83 1 =
a = 184.684 mm a =
ab = 315.981 mm > a . . . Undereinforced ab =
c = 222.511 mm c =
Check the strain of bars Check the st
y = 0.0020 y =
s' = 0.0025 > y . . . Yield s' =
s = 0.0056 > y . . . Yield s =

Check nominal strength Check nomin


Mn = 98.896 tm Mn =
Mn = 79.117 tm > Mu-top . . . OK Mn =

Check ratio shear reinforcemenet Check ratio s


Av/s = 1.689 > (Av/s)req . . . OK Av/s =

Check shear reinforcemenet Check shear


Av = 253.400 mm2 2 (stirrup) Av =
Vs = 42.875 ton Vs =
Vc = 21.326 ton Vc =
Vn = 64.201 ton Vn =
Vu = 80.251 ton > Vu- . . . OK Vu =

Check distance between reinforcement Check distan


As As
B' = 506 mm > 350 (2 Layer) B' =
As' As'
B' = 281 mm < 350 (1 Layer) B' =

Detail Picture Detail Picture

6 - D 25 (Top Bar)

As' 1 - D 13 (web Bar)

700 700

As D 13 - 150 (Strirrup)

3 - D 25 (Bot Bar)
350
.S (M) = 13 mm
S (E) = 150 mm
S (M) = 150 mm

Flexural reinforcement for moment (M3)


Mu+top = 26.000 tm
Mu-bottom = 12.000 tm
Asreq = mm2
As'req = mm2

Shear reinforcement for shear (V2)


Vu+ = ton
(Av/s)req = 1.281

2. Beam section analysis (Mid)


Check flexural reinforcemenet (rebar)
= 1463.47
= 1520.100 3 - D 25
= 0.000 0 - D 25

= 799.740 mm2 < As . . . OK


= 1520.100 mm2 3 - D 25
= 760.05 mm2 2 - D 25

Check location of netral axis


= 2280.150 mm2
= 0.83
= 92.342 mm
= 315.981 mm > a . . . Undereinforced
= 111.255 mm
Check the strain of bars
= 0.0020
= 0.0019 < y . . . Not yield
= 0.0141 > y . . . Yield

Check nominal strength


= 53.659 tm
= 42.927 tm > Mu-top . . . OK

Check ratio shear reinforcemenet


= 1.689 > (Av/s)req . . . OK

Check shear reinforcemenet


= 253.400 mm2 2 (stirrup)
= 42.875 ton
= 21.326 ton
= 64.201 ton
= 80.251 ton > Vu- . . . OK

Check distance between reinforcement

= 206 mm < 350 (1 Layer)

= 281 mm < 350 (1 Layer)

Detail Picture

2 - D 25 (Top Bar)

As' 1 - D 13 (web Bar)

As D 13 - 150 (Strirrup)

3 - D 25 (Bot Bar)
350
MATERIAL TULANGAN ULIR

Mutu beton Berat Diameter Luas


Kode
(K) (Fc') kg/m mm mm2
K-225 18.68 10 0.56 9.53 71.3
K-250 20.75 13 0.995 12.7 126.7
K-400 33.20 16 1.56 15.9 198.6
19 2.25 19.1 286.5
Mutu baja 22 3.04 22.2 387.1
BJ Fy 25 3.98 25.4 506.7
BJTD-40 400 29 5.04 28.6 642.4
BJTP-24 240 32 6.23 31.8 794.2
35 7.51 34.9 956.6
100 38 8.95 38.1 1140
150
200

2
3
4
LIR JARAK ANTAR TULANGAN (JAPAN STANDRAD)

Perimeter 2 3 4 5 6
mm D10 19.5 23.5 28 33 38
D16
3 D13 21 25 30 34.5 39.5
4 D10 19.5 24 29 34.5 39.5
D19
5 D13 21.5 25.5 30.5 36 41
6 D10 20 25 31 36.5 42.5
D22
7 D13 22 26.5 32.5 38 44
8 D10 21 26.5 33 39.5 46
9 D25 D13 22.5 28 34.5 41 47.5
10 D16 24.5 30 36.5 43 50
11 D13 23.5 30 38 45.5 53
D29
12 D16 25.5 32 39.5 47 55
D13 24.5 31.5 40 48.5 57
D32
D16 26 33.5 42 50 58.5
D13 25 33.5 42.5 52 61
D35
D16 27 35 44.5 53.5 63
(JAPAN STANDRAD)

7 8 9 10
43 48 53 58
44.5 49.5 54.5 59.5
45 50 55 60.5
46.5 51.5 57 62
48 54 60 65.5
50 55.5 61.5 67
52.5 59.5 66 72.5
54 61 67.5 74
56.5 63 69.5 76
61 68.5 76 84
62.5 70 78 85.5
65.5 73.5 82 90.5
67 75.5 84 92
70.5 79.5 89 98
72 81.5 90.5 100

You might also like