Figure above shows a plan view of a school building. It is constructed using cast in-
situ method and the slab spans 3 x 8 m each. Prepare a complete design of beam
2/A-D for both maximum moment and maximum shear at mid-span and support.
Design data:
Slab thickness = 110 mm
Characteristic dead load (including self weight), gk = 15 kN/m
Characteristic live load, qk = 9 kN/m
Nominal cover, c = 30 mm
Concrete’s characteristic strength, fck = 25 N/mm2
Steel characteristic strength (main), fyk = 500 N/mm2
Beam size, bw x h = 225 x 500 mm
Design Moment, M
Design Ultimate Load, w
w = 1.35gk + 1.5qk
= 1.35(15) + 1.5(9)
= 33.75 kN/m
Design Moment, M
F = wL = ( 33.75 ) x ( 8 ) = 270 kN
w = 33.75 kN
bw = 225mm
b = b1 + b2 + bw = 3000mm
beff i = 0.2bi + 0.1 lo < 0.2 lo
lo values
Mid span A-B & C-D => lo = 0.85 (8000) = 6800 mm
Mid span B – C => lo = 0.7 (8000) = 5600 mm
So,
beff = (beff 1 + beff 2) + bw < b = (958 + 958) + 225 = 2141 < 3000 ===ok
Main Reinforcement for span A-B & C-D
K = M / fckbd2
= 194.4 x 106
25 (2141) (425)2
= 0.02 < 0.167
so, used singly reinforcement
As,max = 4.0bh/100
= 4(225 x 425) / 100
= 3825 mm2, As max > As ok
Shear reinforcement design
Vmax =162 kn
VRd,c = [0.12(1.67)(100x0.01x25)1/3](225)(452)
= 59.6kN
K = M / fckbd2
= 237.6 x 106
25 (225) (452)2
= 0.207 > 0.167
so, used doubly reinforcement (compression steel is required)
Tension steel, As
As = Kbalfckbd2 + As’
0.87fyk z
= 0.167 x 25 x 225 x 4522 + 261
0.87 x 500 x 0.82 x 452
= 1190 mm2
From Table A.1, provide 4H20, As = 1260 mm 2
Crack Checking
Check min spacing of reinforcement
Clear distance between bars, s
s = (width,b – 2cnom – 2no of Ø link - no of Ø bar)
No. of spacing
= 225 – (2x30) – (2x8) - (4x20)
3
= 89
3
= 23mm < max[Øbar ; dg (say 20 mm)+5 mm ; 20]