You are on page 1of 7

Project :

2G1 CONCRETE BEAM ANALYSIS Building :


Date :
A. STRUCTURE MATERIAL
Fc' = K-250 Fs = BJTD-40 Ec = 21409.519 MPa
Fy = BJTD-40 Es = 200000 MPa

B. BEAM DATA
L = 10 m b = 450 mm .L (E) = 19 mm .S (M)
Lx = 10 m d' = 40 mm .L (M) = 19 mm S (E)
h = 600 mm d = 540.500 mm .S (E) = 10 mm S (M)

C. ETABS OUTPUT
1. End 2. Mid
Flexural reinforcement for moment (M3) Flexural reinf
Mu-top = 18 tm Mu+top
Mu bottom =
+
9.006 tm Mu-bottom
Asreq = 1034.000 mm2 Asreq
As'req = 672.000 mm2 As'req

Shear reinforcement for shear (V2) Shear reinfor


Vu- = ton Vu+
(Av/s)req = (Av/s)req

D. STRUKTUR ANALYSIS
1. Beam section analysis (End) 2. Beam secti
Check flexural reinforcemenet (rebar) Check flexur
Asdes = 1189.375 Asdes =
As = 1432.500 5 - D 19 As =
As' = 672.000 3 - D 19 As' =

Control Control
Astmin = 851.288 mm2 < As . . . OK Astmin =
As = 1432.500 mm2 5 - D 19 As =
As' = 716.25 mm2 3 - D 19 As' =

Check location of netral axis Check locatio


Ast = 2148.750 mm2 Ast =
1 = 0.85 1 =
a = 108.292 mm a =
ab = 275.655 mm > a . . . Undereinforced ab =
c = 127.402 mm c =
Check the strain of bars Check the st
y = 0.0020 y =
s' = 0.0021 > y . . . Yield s' =
s = 0.0097 > y . . . Yield s =

Check nominal strength Check nomin


Mn = 41.802 tm Mn =
Mn = 33.442 tm > Mu-top . . . OK Mn =

Check ratio shear reinforcemenet Check ratio s


Av/s = 1.070 > (Av/s)req . . . OK Av/s =

Check shear reinforcemenet Check shear


Av = 213.900 mm2 3 (stirrup) Av =
Vs = 23.123 ton Vs =
Vc = 18.466 ton Vc =
Vn = 41.589 ton Vn =
Vu = 51.986 ton > Vu- . . . OK Vu =

Check distance between reinforcement Check distan


As As
B' = 395 mm < 450 (1 Layer) B' =
As' As'
B' = 257 mm < 450 (1 Layer) B' =

Detail Picture Detail Picture

5 - D 19 (Top Bar)

As' 1 - D 10 (web Bar)

600 600

As D 10 - 200 (Strirrup)

3 - D 19 (Bot Bar)
450
.S (M) = 10 mm
S (E) = 200 mm
S (M) = 200 mm

Flexural reinforcement for moment (M3)


Mu+top = 11.000 tm
Mu-bottom = 5.000 tm
Asreq = 801 mm2
As'req = 332 mm2

Shear reinforcement for shear (V2)


Vu+ = ton
(Av/s)req =

2. Beam section analysis (Mid)


Check flexural reinforcemenet (rebar)
= 726.84
= 859.500 3 - D 19
= 332.000 2 - D 19

= 851.288 mm2 < As . . . OK


= 859.500 mm2 3 - D 19
= 429.75 mm2 2 - D 19

Check location of netral axis


= 1289.250 mm2
= 0.85
= 64.975 mm
= 275.655 mm > a . . . Undereinforced
= 76.441 mm
Check the strain of bars
= 0.0020
= 0.0014 < y . . . Not yield
= 0.0182 > y . . . Yield

Check nominal strength


= 26.198 tm
= 20.958 tm > Mu-top . . . OK

Check ratio shear reinforcemenet


= 1.070 > (Av/s)req . . . OK

Check shear reinforcemenet


= 213.900 mm2 3 (stirrup)
= 23.123 ton
= 18.466 ton
= 41.589 ton
= 51.986 ton > Vu- . . . OK

Check distance between reinforcement

= 188 mm < 450 (1 Layer)

= 257 mm < 450 (1 Layer)

Detail Picture

2 - D 19 (Top Bar)

As' 1 - D 10 (web Bar)

As D 10 - 200 (Strirrup)

3 - D 19 (Bot Bar)
450
MATERIAL TULANGAN ULIR

Mutu beton Berat Diameter Luas


Kode
(K) (Fc') kg/m mm mm2
K-225 18.68 10 0.56 9.53 71.3
K-250 20.75 13 0.995 12.7 126.7
K-300 24.90 16 1.56 15.9 198.6
19 2.25 19.1 286.5
Mutu baja 22 3.04 22.2 387.1
BJ Fy 25 3.98 25.4 506.7
BJTD-40 400 29 5.04 28.6 642.4
BJTP-24 240 32 6.23 31.8 794.2
35 7.51 34.9 956.6
100 38 8.95 38.1 1140
150
200

2
3
4
LIR JARAK ANTAR TULANGAN (JAPAN STANDRAD)

Perimeter 2 3 4 5 6
mm D10 19.5 23.5 28 33 38
D16
3 D13 21 25 30 34.5 39.5
4 D10 19.5 24 29 34.5 39.5
D19
5 D13 21.5 25.5 30.5 36 41
6 D10 20 25 31 36.5 42.5
D22
7 D13 22 26.5 32.5 38 44
8 D10 21 26.5 33 39.5 46
9 D25 D13 22.5 28 34.5 41 47.5
10 D16 24.5 30 36.5 43 50
11 D13 23.5 30 38 45.5 53
D29
12 D16 25.5 32 39.5 47 55
D13 24.5 31.5 40 48.5 57
D32
D16 26 33.5 42 50 58.5
D13 25 33.5 42.5 52 61
D35
D16 27 35 44.5 53.5 63
(JAPAN STANDRAD)

7 8 9 10
43 48 53 58
44.5 49.5 54.5 59.5
45 50 55 60.5
46.5 51.5 57 62
48 54 60 65.5
50 55.5 61.5 67
52.5 59.5 66 72.5
54 61 67.5 74
56.5 63 69.5 76
61 68.5 76 84
62.5 70 78 85.5
65.5 73.5 82 90.5
67 75.5 84 92
70.5 79.5 89 98
72 81.5 90.5 100

You might also like