B. BEAM DATA
L = 10 m b = 450 mm .L (E) = 19 mm .S (M)
Lx = 10 m d' = 40 mm .L (M) = 19 mm S (E)
h = 600 mm d = 540.500 mm .S (E) = 10 mm S (M)
C. ETABS OUTPUT
1. End 2. Mid
Flexural reinforcement for moment (M3) Flexural reinf
Mu-top = 18 tm Mu+top
Mu bottom =
+
9.006 tm Mu-bottom
Asreq = 1034.000 mm2 Asreq
As'req = 672.000 mm2 As'req
D. STRUKTUR ANALYSIS
1. Beam section analysis (End) 2. Beam secti
Check flexural reinforcemenet (rebar) Check flexur
Asdes = 1189.375 Asdes =
As = 1432.500 5 - D 19 As =
As' = 672.000 3 - D 19 As' =
Control Control
Astmin = 851.288 mm2 < As . . . OK Astmin =
As = 1432.500 mm2 5 - D 19 As =
As' = 716.25 mm2 3 - D 19 As' =
5 - D 19 (Top Bar)
600 600
As D 10 - 200 (Strirrup)
3 - D 19 (Bot Bar)
450
.S (M) = 10 mm
S (E) = 200 mm
S (M) = 200 mm
Detail Picture
2 - D 19 (Top Bar)
As D 10 - 200 (Strirrup)
3 - D 19 (Bot Bar)
450
MATERIAL TULANGAN ULIR
2
3
4
LIR JARAK ANTAR TULANGAN (JAPAN STANDRAD)
Perimeter 2 3 4 5 6
mm D10 19.5 23.5 28 33 38
D16
3 D13 21 25 30 34.5 39.5
4 D10 19.5 24 29 34.5 39.5
D19
5 D13 21.5 25.5 30.5 36 41
6 D10 20 25 31 36.5 42.5
D22
7 D13 22 26.5 32.5 38 44
8 D10 21 26.5 33 39.5 46
9 D25 D13 22.5 28 34.5 41 47.5
10 D16 24.5 30 36.5 43 50
11 D13 23.5 30 38 45.5 53
D29
12 D16 25.5 32 39.5 47 55
D13 24.5 31.5 40 48.5 57
D32
D16 26 33.5 42 50 58.5
D13 25 33.5 42.5 52 61
D35
D16 27 35 44.5 53.5 63
(JAPAN STANDRAD)
7 8 9 10
43 48 53 58
44.5 49.5 54.5 59.5
45 50 55 60.5
46.5 51.5 57 62
48 54 60 65.5
50 55.5 61.5 67
52.5 59.5 66 72.5
54 61 67.5 74
56.5 63 69.5 76
61 68.5 76 84
62.5 70 78 85.5
65.5 73.5 82 90.5
67 75.5 84 92
70.5 79.5 89 98
72 81.5 90.5 100