The distance from the resultant of the column forces to the center of column B is given as:
x'= 1.688 m
Center of gravity of the two footings should coincide with the resultant of the two
column loads to ensure uniform soil pressure below the two footings
B-Interior footing:
Shear force, Vu= 283.91 KN
Shear stressTv= 0.33 N/mm2
Punching shear need not to be considered due to presence of the strap beam
Bending Moment
A-Exterior footing:
Bending moment, Mu= 247.7 KNm
Effective depth required,d= 201.98 mm OK
Ast required
a= 3.405
b= -142253.7
c= 247710638.30
Solving.
ASt= 39952.81 rejected
1820.68 mm2 total approved
827.58 mm2/m
B-interior footing:
Bending moment, Mu= 230.4 KNm
Effective depth required,d= 182.74 mm
Ast required
a= 2.997
b= -142253.7
c= 230425531.91
Solving.
ASt= 45790.66 rejected
1679.22 mm2 total approved
671.69 mm2/m
a= 12.486
b= -339387
c= 613125000.00
Solving.
ASt= 25234.85 rejected
1945.87 mm2 total approved
a= 12.486
b= -339387
c= 398936170.21
Solving.
ASt= 25949.49 rejected
1231.23 mm2 total approved
Spacing, S = Asv σ st d
Vus
Hence provide f 10 mm 4-legged vertical stirrups @
BASE 3291 E7 DCON2 1309.36 960.197
c/c distance(m) BASE 3292 E8 DCON2 896.75 657.617
4.5
5950
A CG B B= 2500 400
Ok
0.15 0.28
0.25 0.36
0.50 0.48
0.75 0.56
1.00 0.62
1.25 0.67
1.50 0.72
1.75 0.75
2.00 0.79
2.25 0.81
2.50 0.82
2.75 0.82
3.00 and above 0.82
2640
1760
11.73333333333
om, giving area of 510.64 510.64
861.70
B E F
102.1 D 223.4
A H
y G
638.30
C
797.87
797.87 = 223.40
KN y 2 -y
613.13
564.26
279.26
-10.21 -398.94
500 50 5 25 68.75
2454.4 mm2
981.7 mm3
3436.1
OK
0.15 0.28
0.25 0.36
0.50 0.48
0.75 0.56
1.00 0.62
1.25 0.67
1.50 0.72
1.75 0.75
1570.8 mm2 2.00 0.79
628.3 mm3 2.25 0.81
2199.1 2.50 0.82
OK 2.75 0.82
3.00 and above 0.82
Percent of Tc
1.00 0.62
1.25 0.67
N/mm2 O.K. 0.54
314 mm2
220 mm c/c
The distance from the resultant of the column forces to the center of column B is given as:
x'= 1.315 m
Center of gravity of the two footings should coincide with the resultant of the two column loads to ensure uniform
soil pressure below the two footings
Taking moments of footing areas about the center of column B;
x'= BL1( 3.683 -L1/2 )
(BL1+BL2)
1.315 =BL1( 3.683 -L1/2
4.86
Let, B= 1.9 m
From quadratic equation,
a= 0.95
b= -6.9977
c= 6.39
Solving.
L1= 6.30 rejected
1.07 approved
Assume, L1= 1.90 m
L2= 0.66 Area= 7.22 m2 Ok
Assume, L2= 1.90 m
B-Interior footing:
Shear force, Vu= 118.59 KN
Shear stressTv= 0.18 N/mm2
Punching shear need not to be considered due to presence of the strap beam
Bending Moment
A-Exterior footing:
Bending moment, Mu= 83.2 KNm
Effective depth required,d= 125.93 mm OK
Ast required
a= 5.724
b= -149640
c= 83161094.86
Solving.
ASt= 25575.91 rejected
568.09 mm2 total approved
298.99 mm2/m
Provide ø 10 mm bars 150 mm c/c
steel = 523.333333333333 mm2 > required ok
B-interior footing:
Bending moment, Mu= 83.2 KNm
Effective depth required,d= 125.93 mm
Ast required
a= 5.724
b= -149640
c= 83161094.86
Solving.
ASt= 25575.91 rejected
568.09 mm2 total approved
298.99 mm2/m
a= 27.188
b= -278400
c= 205464297.93
Solving.
ASt= 9439.39 rejected
800.61 mm2 total approved
Provide ø 20 mm bars, No. reqd.= 2.55
16 mm bars, No. reqd.= -0.71
Provide 3 nos. of 20 mm bars Ast provided= 942.5 mm2
0 nos. of 16 mm bars Ast provided= 0.0 mm3
942.5
OK
Ast required at point of maximum hogging moment ie at G
a= 27.188
b= -278400
c= 117976937.50
Solving.
ASt= 9797.07 rejected
442.93 mm2 total approved
A CG B B= 1900 304.8
2.25 0.81
2.50 0.82
2.75 0.82
3.00 and above 0.82
Percent of Ast Tc
0.25 0.36
0.50 0.48
0.31
261.44 261.44
375.09
B E F
39.8 D 126.7
A H
y G
248.37
C
330.19
330.19 = 126.72
y 1.7476 -y
205.46
174.76
120.38
-3.04 -117.98
500 50 4 20 106.66667
0.15 0.28
0.25 0.36
0.50 0.48
0.75 0.56
1.00 0.62
1.25 0.67
1.50 0.72
1.75 0.75
2.00 0.79
2.25 0.81
2.50 0.82
2.75 0.82
3.00 and above 0.82
Percent of Tc
0.75 0.56
1.00 0.62
0.47