STEAM POWER:
PLANT LAYOUT,
SITE SELECTION
1
Thermal Power Plant
2
3
Site Selection for Thermal Power plant
Availability of raw material 500 MW requires 5000 6000 tones of
coal/day
Availability of land - 3 acres / MW
Nature of land to with stand dead load minimum bearing capacity
should be 1000 kN/m
Cost of land away from city
Availability of water makeup water condenser ash disposal
Transport facilities railway line or road line to transfer coal bringing
heavy machinery for employees access
4
Thermal Power Plant
5
Thermal Power Plant Layout
6
Advantages
7
Disadvantages
It pollutes the atmosphere due to production of large amount of smoke
and fumes.
It is costlier in running cost as compared to Hydro electric plants.
Ash disposal facilities a 500 MW plant requires 10 hectares area to a
height of 7 m to dump ash in a year
Availability of labour from the construction onwards cheap labour are
needed
Load centre near to load centre
Public problems to avoid nuisance from smoke, fly ash and heat
discharge, should be located far from towns
Future extension should allow for extension of power plant with the
estimated growth load.