NATIONAL UNIVERSITY

551 MF Jhocson Street, Sampaloc, Manila


DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY

V. TABULATION & RESULTS

Width of the channel, b = 0.075 m

A. Spillway Apparatus

Table 1: Actual Values

DEPTH DEPTH ACTUAL


LENGTH OF FLOW RATE,
BEFORE BEFORE HEAD LOSS TIME VOLUME
TRIAL JUMP, Qa
JUMP, JUMP, (m) (sec) ( )
(m)
d1 (m) d2 (m) ( )
1 8 x 103 .029 .263 60 0.019
2 .01 .038 .294 60 .026

3 .013 .046 .331 60 .036

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)
1
2
3
NATIONAL UNIVERSITY
551 MF Jhocson Street, Sampaloc, Manila
DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY

B. Spillway Apparatus with 1 Block

Table 1: Actual Values

ACTUAL
DEPTH DEPTH FLOW
LENGTH HEAD TAIL
BEFORE BEFORE TIME VOLUME RATE,
TRIAL OF JUMP, LOSS WATER
JUMP, JUMP, (sec) ( ) Qa
(m) (m) (m)
d1 (m) d2 (m)
( )
1 .018 .047 .345 .05 60 .044
2 .012 .035 .194 .038 60 .022

3 .021 .041 .349 .053 60 .054

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)
1

3
NATIONAL UNIVERSITY
551 MF Jhocson Street, Sampaloc, Manila
DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY

B. Spillway Apparatus with 2 Block

Table 1: Actual Values

ACTUAL
DEPTH DEPTH FLOW
LENGTH HEAD TAIL
BEFORE BEFORE TIME VOLUME RATE,
TRIAL OF JUMP, LOSS WATER
JUMP, JUMP, (sec) ( ) Qa
(m) (m) (m)
d1 (m) d2 (m)
( )

1 .013 .059 .41 .061 60 .057

2 .01 .048 .274 .053 60 .044

3 .012 .053 .295 .055 60 .050

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)

3
NATIONAL UNIVERSITY
551 MF Jhocson Street, Sampaloc, Manila
DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY
B. Spillway Apparatus with Roughness Bed

Table 1: Actual Values

ACTUAL
DEPTH DEPTH FLOW
LENGTH HEAD TAIL
BEFORE BEFORE TIME VOLUME RATE,
TRIAL OF JUMP, LOSS WATER
JUMP, JUMP, (sec) ( ) Qa
(m) (m) (m)
d1 (m) d2 (m)
( )
.217 .069
1 .023 .062 60 .058
.424 .070
2 .021 .068 60 .057
.429 .067
3 .025 .063 60 .054

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)

1
2
3
NATIONAL UNIVERSITY
551 MF Jhocson Street, Sampaloc, Manila
DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY
B. Spillway Apparatus with Sloping Energy Dissipator

Table 1: Actual Values

ACTUAL
DEPTH DEPTH FLOW
LENGTH HEAD TAIL
BEFORE BEFORE TIME VOLUME RATE,
TRIAL OF JUMP, LOSS WATER
JUMP, JUMP, (sec) ( ) Qa
(m) (m) (m)
d1 (m) d2 (m)
( )
.343 .064
1 .016 .058 60 .058
.304 .059
2 .021 .056 60 .056

.374 .064
3 .019 .064 60 .055

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)

3
NATIONAL UNIVERSITY
551 MF Jhocson Street, Sampaloc, Manila
DEPARTMENT OF CIVIL ENGINEERING
HYDRAULICS LABORATORY
B. Spillway Apparatus with Rectangular Energy Dissipator

Table 1: Actual Values

ACTUAL
DEPTH DEPTH FLOW
LENGTH HEAD TAIL
BEFORE BEFORE TIME VOLUME RATE,
TRIAL OF JUMP, LOSS WATER
JUMP, JUMP, (sec) ( ) Qa
(m) (m) (m)
d1 (m) d2 (m)
( )
.294 .056
1 .017 .053 60 .055
.280 .058
2 .014 .056 60 .047

.332 .039
3 .012 .037 60 .036

Table 2: Theoretical Values

THEORETICAL TOTAL TOTAL FROUDE FROUDE


VELOCITY, VELOCITY, NUMBER NUMBER
TRIAL FLOW RATE, ENERGY, ENERGY,
v1 (m/s) v2 (m/s) FN1 FN2
Qt (m3/s) E1 (m) E2 (m)
(subcritical) (supercritical)
1