2 SURVEYING WORK
2.1 ONSHORE
Benchmark Installation Ea
Onshore Topographical Mapping Ha
2.2 OFFSHORE
Bathymetrical Survey Ha
Velocity Profile Survey Ha
Side Scan Sonar Survey Ha
Sub Bottom Profiling Ha
Magnetometer Survey Ha
Tidal Monitoring Survey Week
Meteorological Survey Lot
3 GEOPHYSICAL WORK
Wenner Soil Resistivity (ASTM G57) Ea
DC Resistivity Survey (ASTM D6431) m
Seismic Refraction Survey (ASTM D5777) m
Ground Penetrating Radar (ASTM D6432) Ha
MASW (Multi-Channel Analysis of Surface Waves) m
4.3 SOUNDING
Cone Penetration Test Mechanical, 10 ton capacity Ea
5.3 SOUNDING
Cone Penetration Test Ea
6 LABORATORY TEST
6.1 INDEX PROPERTIES
Water Content (ASTM D2216) XX Ea @ XX Borehole Ea
Specific Gravity (ASTM D854) Ea
Natural Density (ASTM D7263) Ea
Atterberg Limits (ASTM D4318) Ea
Sieve Analysis & Hydrometer (ASTM D6913 & ASTM D7928) Ea
7 REPORT
A. Onshore Surveying Report Ls 1
B. Offshore Surveying Report Ls 1
C. Geotechnical Report and Recommendation Ls 1
BILL OF QUANTITY - CIVIL
Project :
Location :
Work No. :
RFQ Title :
RFQ Rev. :
WORK ITEM UNIT PRICE TOTAL MANHOURS REMARKS
Number UNIT BQ MATERIAL LABOUR MATERIAL LABOUR SUM UNIT TOTAL
DESCRIPTION BREAKDOWN
L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) MANHOUR MANHOURS
(1) (2) (3) (4) (5) (6) (7) = (4) X (5) (8) = (4) x (6) (9) = (7) + (8) (10) (11) = (4) x (10) (12)
2 SURVEYING WORK
Benchmark Installation Ea
Topographical Mapping Ha
3 GEOPHYSICAL WORK
Wenner Soil Resistivity (ASTM G57) Ea
DC Resistivity Survey (ASTM D6431) m
Seismic Refraction Survey (ASTM D5777) m
Ground Penetrating Radar (ASTM D6432) Ha
MASW (Multi-Channel Analysis of Surface Waves) m
4 SOIL INVESTIGATION
4.1 DRILLING, BORING, AND SAMPLING
Rotary Coring XX Ea @ min XX m or up to hard soil M
Rotary Wash Boring M
Hand Boring M
Boring: Disturbed Samples XX @ XX Ea Ea
Boring: Undisturbed Samples (ASTM D6519, ASTM D1587) XX @ XX Ea Ea
4.3 SOUNDING
Cone Penetration Test Mechanical, 10 ton capacity Ea
5 LABORATORY TEST
5.1 INDEX PROPERTIES
Water Content (ASTM D2216) XX Ea @ XX Borehole Ea
Specific Gravity (ASTM D854) Ea
Natural Density (ASTM D7263) Ea
Atterberg Limits (ASTM D4318) Ea
Sieve Analysis & Hydrometer (ASTM D6913 & ASTM D7928) Ea
6 REPORT
A. Topographical Survey Report Ls 1
B. Geotechnical Report and Recommendation Ls 1
BILL OF QUANTITY - CIVIL
Project : FEED for DHT Refinery Unit Dumai, Cilacap, and Kasim
Location : RU II Dumai
Work No. : PD22007
RFQ Title : Bathymetrical survey, geophysical survey, and offshore soil investigation
RFQ Rev. :D
WORK ITEM UNIT PRICE TOTAL MANHOURS REMARKS
Number UNIT BQ MATERIAL LABOUR MATERIAL LABOUR SUM UNIT TOTAL
DESCRIPTION BREAKDOWN
L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) MANHOUR MANHOURS
(1) (2) (3) (4) (5) (6) (7) = (4) X (5) (8) = (4) x (6) (9) = (7) + (8) (10) (11) = (4) x (10) (12)
2 SURVEYING WORK
Bathymetrical Survey (Optional) 30 Ha for Construction Jetty + 30 Ha for Jetty Product Ha 60
Current Measurement Survey 30 days Ea 21
Side Scan Sonar Survey Ha 10
Sub Bottom Profiling Ha 10
Magnetometer Survey Ha 10
Tidal Monitoring Survey 30 days Lot 1
Meteorological Survey Wind speed measurement, 30 days Lot 1
Water Temperature Measurement Survey for SWI seabed water temperature Lot 1
TEST IN BOREHOLE
Standard Penetration Test (ASTM D1586) Every 2 m Ea 25
Downhole Test (ASTM D7400) Ea Rate Only
TEST IN BOREHOLE
Standard Penetration Test (ASTM D1586) Every 2 m Ea 50
SOUNDING
Cone Penetration Test (Optional) 10 ton capacity Ea 2
5 LABORATORY TEST
INDEX PROPERTIES
Water Content (ASTM D2216) Ea 54 20
Specific Gravity (ASTM D854) Ea 54 20
Natural Density (ASTM D7263) Ea 54 20
Atterberg Limits (ASTM D4318) Ea 54 20
Including TDS (Total Dissolved Solid) and TSS (Total
Sieve Analysis & Hydrometer (ASTM D6913 & ASTM D7928) 54 20
Suspended Solid) measurement for sediment sample Ea
ENGINEERING PROPERTIES
Direct Shear Test (ASTM D3080) or Triaxial UU (ASTM D2850) Ea 15 5
Triaxial CU (ASTM D4767) Ea 3
Consolidation Test (ASTM D2435) Ea 8
6 REPORT
Including metocean study, which consist of Tide Analysis,
A. Marine geophysical survey report Wind Analysis (Wind Rose and Intensity) and Wave Analysis Ls 1
(incl. Extreme Wave)
B. Geotechnical Report and Recommendation Including liquefaction assessment Ls 1
BILL OF QUANTITY - CIVIL
Project : FEED for DHT Refinery Unit Dumai, Cilacap, and Kasim
Location : RU IV Cilacap
Work No. : PD22007
RFQ Title : Bathymetrical survey, geophysical survey, and offshore soil investigation
RFQ Rev. :D
WORK ITEM UNIT PRICE TOTAL MANHOURS REMARKS
Number UNIT BQ MATERIAL LABOUR MATERIAL LABOUR SUM UNIT TOTAL
DESCRIPTION BREAKDOWN
L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) MANHOUR MANHOURS
(1) (2) (3) (4) (5) (6) (7) = (4) X (5) (8) = (4) x (6) (9) = (7) + (8) (10) (11) = (4) x (10) (12)
2 SURVEYING WORK
Bathymetrical Survey Ha 25 10
Current Measurement Survey 30 days Ea 21
Side Scan Sonar Survey Ha 10
Sub Bottom Profiling Ha 10
Magnetometer Survey Ha 10
Tidal Monitoring Survey 30 days Lot 1
Meteorological Survey Wind speed measurement Lot 1
4 LABORATORY TEST
INDEX PROPERTIES
Water Content (ASTM D2216) Ea 3
Specific Gravity (ASTM D854) Ea 3
Natural Density (ASTM D7263) Ea 3
Atterberg Limits (ASTM D4318) Ea 3
Including TDS (Total Dissolved Solid) and TSS (Total
Sieve Analysis & Hydrometer (ASTM D6913 & ASTM D7928) 3
Suspended Solid) measurement for sediment sample Ea
5 REPORT
A. Marine geophysical survey report Including metocean study Ls 1
B. Geotechnical Report and Recommendation Including liquefaction assessment Ls 1
BILL OF QUANTITY - CIVIL
Project : FEED for DHT Refinery Unit Dumai, Cilacap, and Kasim
Location : RU VII Kasim
Work No. : PD22007
RFQ Title : Bathymetrical survey, geophysical survey, and offshore soil investigation
RFQ Rev. :D
WORK ITEM UNIT PRICE TOTAL MANHOURS REMARKS
Number UNIT BQ MATERIAL LABOUR MATERIAL LABOUR SUM UNIT TOTAL
DESCRIPTION BREAKDOWN
L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) L.C(IDR) MANHOUR MANHOURS
(1) (2) (3) (4) (5) (6) (7) = (4) X (5) (8) = (4) x (6) (9) = (7) + (8) (10) (11) = (4) x (10) (12)
2 SURVEYING WORK
Bathymetrical Survey Ha 25 10
Current Measurement Survey 30 days Ea 2
Side Scan Sonar Survey Ha 10
Sub Bottom Profiling Ha 10
Magnetometer Survey Ha 10
Tidal Monitoring Survey 30 days Lot 1
Meteorological Survey Wind speed measurement Lot 1
Water Temperature Measurement Survey for SWI and SWO seabed water temperature Lot 2
TEST IN BOREHOLE
Standard Penetration Test (ASTM D1586) Every 2 m Ea 25
Downhole Test (ASTM D7400) Ea Rate Only
SOUNDING
Cone Penetration Test Mechanical, 10 ton capacity Ea 2
TEST IN BOREHOLE
Standard Penetration Test (ASTM D1586) Every 2 m Ea 25 0
5 LABORATORY TEST
INDEX PROPERTIES
Water Content (ASTM D2216) Ea 37 20
Specific Gravity (ASTM D854) Ea 37 20
Natural Density (ASTM D7263) Ea 37 20
Atterberg Limits (ASTM D4318) Ea 37 20
Including TDS (Total Dissolved Solid) and TSS (Total
Sieve Analysis & Hydrometer (ASTM D6913 & ASTM D7928) 37 20
Suspended Solid) measurement for sediment sample Ea
ENGINEERING PROPERTIES
Direct Shear Test (ASTM D3080) or Triaxial UU (ASTM D2850) Ea 10 5
Triaxial CU (ASTM D4767) Ea 3
Consolidation Test (ASTM D2435) Ea 8
6 REPORT
A. Marine geophysical survey report Including metocean study Ls 1
B. Geotechnical Report and Recommendation Including liquefaction assessment Ls 1