Professional Documents
Culture Documents
2022
1
INTRODUCTION
Berau Coal
GAM
Karimun Non-electric Detonator
KPP-MA
PPA-BOSS Assembly Plant
Adaro Indonesia
PAMA PPA-ABP
Kideco
Freeport
Hasnur Riung Sinergi
PPA - BIB
Ammonium
Nitrate Plant
AMNT
02 Area of Concern
Critical structure dan concern area
03 Existing Condition
Pre-determine limit and study
05 Expectation
Output of this trial
3
Chapter One
Background
4
Background
Preliminary
5 5
Chapter Two
Area of Concern
6
Area of Concern
Geotech and Mine Squence KGS
Stage 3
Stage 2
Stage 1
7
Area of Concern
Actual Condition Pasupati
8
Chapter Three
Existing Condition
9
Existing Condition
Treshold Limit for Seismic Load
Tresshold limit
untuk concern
slope pada
sidewall
10
Existing Condition
Recent Study
11
Chapter Four
Signature Hole Analysis
12
Ground Vibration
Faktor-faktor yang mempengaruhi ground vibration
Jarak Peledakan
Topografi
Jenis Bahan Peledak
Waktu Tunda
Bidang Lemah
Keakuratan Sistem Inisiasi
13
Signature Hole Analysis (SHA)
Analisis dengan merekam gelombang dari satu, atau banyak lubang ledak standar. Sensor getaran akan
ditempatkan diantara tempat yang sensitive terhadap struktur getaran, (yaitu dinding, bangunan,
bendungan), hal ini akan memberikan informasi mengenai homogenitas masa batuan.
20 m 20 m 20 m
14
Vibration Control
Passive and Active Ways
PASSIVE ACTIVE
15
Vibration Control
Passive Ways
10.0
1.0
0.1
1 10 100 1000
Square Root Scaled Distance (m/kg^1/2)
16
Vibration Control
Active Ways
Jika dua atau beberapa gelombang yang berbeda fase yang merambat pada medium dan waktu yang sama serta memiliki
amplitudo dan panjang gelombang yang sama yang mana akan menghasilkan simpangan resultan sama dengan nol.
17
Trial Plan
Sceme and Sequence
18
Action
01 Field Observation & Analysis
Komunikasi dengan Pihak Terkait sehubungan dengan langkah perbaikan lanjutan.
(PIC: TS Area 2)
19
Chapter Five
Output
20
Expectation
Output Of this Trial
Scale Distance
Scaled Distance Peak Particle Acceleration (g) - ABP Pit 10
Regression Line For SD 1.SDF Regression Line For SHA - ABP PIT 10_PPA.SDF
95% Line Equation: V = 5.22 * (SD)^(-0.665) 95% Line Equation: V = 10.3 * (SD)^(-1.65)
Coefficient of Determination = 0.212 Standard Deviation = 0.314 Coefficient of Determination = 0.864 Standard Deviation = 0.0658
1.00 1.00
Peak Particle Velocity (mm/s)
0.01 0.01
10 100 1 10 100
Square Root Scaled Distance (m/kg^1/2) Square Root Scaled Distance (m/kg^1/2)
Analysis by Tech. Services Department
PT. Multi Nitrotama Kimia
21
Scale Distance Analysis
Distance / Charge Weight
Charge Weight Berdasarkan Hasil Analysis SHA (Low Wall Pit 10 Elv 17)
Depth Hole
Distance Charge a Prediction
Recommendation PF Max Note
(m) Weight (kg) (g)
(m)
5.5 0.20
6 0.18
6.5 0.17 Recommended menggunakan kedalaman 7-8
50 72.62 0.550
7 0.16 meter dengan design delay hole by hole
7.5 0.15
8 0.15
22
Expectation
Output Of this Trial
Wave modeling
Gelombang dianalisis dan dimodelkan untuk mengeluarkan amplitudo gelombang tersebut keluar
dari fasenya dengan prinsip linear superposition. Data gelombang tersebut dianalisis menggunakan
software dengan advanced module, yang mana hasil analisisnya akan berupa simulasi waktu tunda
(inter-row, inter-hole, dan inter-deck delay) dan prediksi nilai getaran yang dihasilkan
23
Linier Superposition
Interhole & Interow Delay
Interhole 54 ms
IP
Thank You
26