LAPORAN KEGIATAN HARIAN PEKERJAAN BENDUNGAN UTAMA

Kontraktor : PT. Wijaya Karya


Jenis Pekerjaan : Pelaksanaan Pembangunan Bendungan Utama
Lingkup Pekerja : Proyek Bendungan Kuningan
Tanggal :
Waktu Kerja Rincian alat & alat bantu yg dipakai Jam kerja
No. Rincian Tenaga Kerja No.
Juml Jam Total Jml Jam Total

A. Management: A Peralatan
1 Construction Manager
2 Site Manager 1 Vibro Compactor
3 Pelaksana 2 Excavator
4 Surveyor 3 Buldozer
5 HSE Officer 4 Mixer Truck
6 Quality Control 5 Compressor
7 Procurement & Logistic 6 Mesin Bor/Drilling
8 Security 7 Mesin Grouting
Total A 8 Genset
9 Tamping Rammer
B Subkont: Total
1 Mandor
2 Tk Batu
3 Tk Bor
4 Tk Besi
5 Tk Las
6 Pembantu Tk
7 Logistic
8 Operator [Genset] C TOOLS
9 Operator A2B 1 Total stasion/Theodolit
10 Driver 2 Waterpass
11 Pekerja 3 Drill tools
12 Signalman/Flagman 4 Pipe tools
5 QC tools
Total B Total
Jumlah Total (A + B)
- -

CUACA
No. Waktu Kondisi CATATAN
1 07.00 ~ 17.00 C
AM PM

Note : C = terang R = hujan


CD = berawan W = angin

Progress hari ini dan rencana besok


No. Progress hari ini Rencana besok

Produksi Sisa
produksi kumulatif produksi Rencana kegiatan
No Uraian Kegiatan kumulatif pada Total BQ No Item Pekerjaan
s/d kemarin hari ini BQ % untuk hari besok
hari ini

MATERIAL ON SITE
NO Jenis Material Qty Cumm. Qty Target Qty %
1
2
3
4
5
6
7
8
Note :
- Pengecoran
-
Tie- Beam
menunggu
-
material
fabrikasi
Wiremesh M- PT. IKA ADYA PERKASA J.O.
9 karena Disiapkan oleh Diketahui oleh
dimensi M-8
di pasaran
tidak
memenuhi
persyaratan
sebagaimana
dalam Deny Surya
spesifikasi
Inspector Bendungan Utama Ass. Dam Construction Engineer
teknis.
- Pekerjaan
install
terganggu
karena
security track
tidak bisa
dilewati
(banyak
kubangan
dan becek)
terutama di
(1+900,
2+300,
2+800-2+900,
3+800,
4+700) dan
sedimentasi
area len
concrete
0
0