Professional Documents
Culture Documents
Cumption : FRM-MRE-015
MINUTES of MEETING
Konsumsi : 00
Date : 30-Apr-23 Lokasi : Office Infra
Materi Pembahasan Tindakan Perbaikan PIC Due Date Status
ENGINEERING
Yearly: PROBLEM UA
Plan YTD: SHIFT 1 renaldo
Act. YTD:
Ach : #DIV/0!
Rain : 5
Slippery: 2 SHIFT 2
Coal (Daily) Coal (MTD) hujan 5 jam
Plan: 1.096,00 Plan:
Actual: 336 Actual: 0,00
Ach : 30,7% Ach: #DIV/0! PROBLEM COAL
shift 1
REMAINING TARGET OB: bcm/day shift 2 tidak ada terkendala timbangan
REMAINING TARGET COAL: ton/day Problem expose
No Dz375
SCM Review Activity:
Problem Productivity: Plan
- PA : 6 fleet; exp S44, exp s43, ex 53, ex 54, progres S48; strip pit
- Running fleet plan 7; act 6-7 41;
Problem Productivity
SHIFT 1 SHIFT 2
front undulating, change dt BD front lembek/amblas, change dt bd
1 Recountoring disposal final sisa disposal RL 120; cek Wiwit TBA open
2 perbaikan settling pond kompartemen 4 wait eksternal problem Ernanda tba Open
6 Resloping Pit48 HW barat Wait ex324; cross section by survey Suzena TBA continue
7 perbaikan paritan belakang workshop Progress ex231; cek survey Riyan dan Renaldo TBA open
8 Pengukuran Debit Continue Riyan dan Sena TBA continue
9 perbaikan paritan SP wait info eksternal Riyan TBA continue
13 Inspeksi Waterfill bersama EBH progres di area transtank lama Wiwit 25-Apr-23 closed
Follow up observasi resloping HW Observasi; wait 324 rfu Riyan dan Arif TBA open
Dumping good material ke arah disposal PIT 41 progress ex229 Riyan TBA continue
Dumping soil di gudang handak wait prepare area Riyan TBA open
CPSD
1 Fingerprint wait konfigurasi mesin untuk departemen plant Januar tba Open
OSPD
3 Ajuan training WP 35 volvo 150 electric Wait info HO; dari GL plant Arif tba continue
Driver FT simper Canter Pegajuan simper Sri dan Arif TBA open
PLANT
1 UPDATE STATUS UNIT RFU Ex400 6; Ex300 0; Ex200 4; Dz85 2; Dz375 2
A UPDATE PROGRESS UNIT
A2B
1 EX 458 INSIDEN Wait pengerjaan mal kaca (trinity); 5 Mei 2023; Ekos dan Sri TBA continue
8 Dz029 overheat oli transmisi, oli transmisi leak Pengecekan; progres Agus L TBA open
11 Dz314 error 03 order supply pump; PO; estimasi 2 hari after PO; progres 1 hari Agus TBA open
DZ310 equalizer bar worn out wait man Agus TBA closed
GD707 temuan fire suppression reservasi; penawaran (PR); ETA completed 2 Mei 2023; PS4000 Agus dan Sri TBA open
DZ066 temuan kerusakan pintu Wait trinity + UT; progres penawaran; komunikasi KTT Agus TBA open
GD108 Joint cylinder Steering Rod Progress Deni A akhir shift open
Dz312 investigasi change dengan 310; bekas 312 ditaruh di transtank Deni A dan Riyan TBA open
Dz050 cant start cek after hujan Deni A Rest time open
DT OB 25
DT3262 bolt torque plate tire no.2 broken wait part; ETA RFU 28/4/23; eta jam 10 29/4/23 Agus 28/04/2023 closed
DT3217 steering hard (steering gear box & timming gear broken) PR; wait quotation; release PO (Senin) Agus TBA open
DT3208 engine sinjal ground test; harness; quotation dan approve PR 3 (senin) Agus dan Mandala TBA open
DT3232 Bolt U bolt loose Progress; ETA RFU 12.00 29/4/23 Agus 29-Apr-23 closed
DT3251 Hose air pressure leak jam 15.00 Agus TBA closed
DT3209 PTO abnormal Modifikasi Shaft PTO; ETA RFU 15.00 29/4/23 Agus 29-Apr-23 closed
3219 PS4000 Progress; ETA RFU 10.00 29/4/23 Deni A 29-Apr-23 closed
DT3233 Bolt U-Bolt loose Progress; ETA RFU 12.00 29/4/23 Deni A 29-Apr-23 closed
DT3243 Tyre No. 3 Leak Progress; ETA RFU 10.00 29/4/23 Deni A 29-Apr-23 closed
DT3205 Spring front RH no. 1 Progress; ETA RFU 14.00 29/4/23 Deni A 29-Apr-23 closed
DT3226 Jog Abnormal, Rembesan oli hydraulic di PTO observasi jog abnormal; pengecekan Deni A TBA closed
DT3214 Spring front LH No. 1 and Front RH no 2 broken 4 jam after weather Deni A 30-Apr-23 open
DT HINO RFU 5
DT253 exhaust brake abnormal Progress; ETA RFU 12.00 29/4/23 Deni A 29-Apr-23 closed
DT246 main harness battery to ECU Loose Wait man Agus TBA open
UNIT SUPPORT
2 TL 478 ND compresor engine leak proposal warranty; update vendor Agus tba open
3 WP21 contine troubleshoot electric cleaning fuel tank; flashing; update soft ware 2 mei 2023 Agus TBA Open
Daily Maintenance
DM wheel : 3220, 3222, 3224, 3232, 250 Riyan eom april continue
83
ISSUE
1 clear area pit stop lama Dt3174 (wait man); Ex441 dan WP021 agus after Ied continue
2 Recommissioning unit wheel (DM); Track (PS); Agus dan Rohmad TBA Open
4 Transmisi LT04 yang dipinjam B09 Progres cek by Khusnul Khusnul dan Agus EoM Mei open
Plan Service
1 453 PS 250
2 447 PS 250 terlewat 2x PS
3 3235 PS500 6 jam
4 3222 ps 1000 8 jam
1 Stock Fuel Stock fuel di 72.000 L, kedatangan 30.000 L Sri eom april continue
4 Warehouse InFra progres pemindahan kontainer; wait 458 Sri EoM Mei open
HCGS
5 Risalah dan uang muka Risalah : Ilmawan All dept TBA open
6 grade golongan WT Tetap 1A; wait sundul OSPD HO Bagas dan Arif 24-Apr-23 open
8 Kedatangan siswa persiapan mess dan lain-lain Arif dan Khusnul week 1 mei open
Perbaikan pintu B06 Foto tampak belakang; ajuan ke SCM Khusnul TBA open
HSE
1 Inspeksi level 1 week 17 progres PICA (27/4/23) All dept 27-Apr-23 open
2 Safety Patrol & OSPD feedback PICA; update ke dept terkait HSE-OSPD TBA Continue
CBT JSA (Kamis - Jumat - Sabtu - Minggu)
Plant :
OSPD :
3 Training CBT Prod : Rhafli 30-Apr-23 Continue
Eng :
HCGS :
SCM :
7 collecting point infra workshop kebutuhan area dan material, wait design Bagas dan Deni A TBA continue
8 QCC & QCP konfirmasi HO; Plant (30/4/23) all dept 16-Apr-23 open
10 permit kerja di area kritiikal Review JSA dan surat izin rohmat 18-Apr-23 open
14 DT250 vessel miring Wait report dari HSE all dept tba open
Update recommissioning unit rekap dan update grup Rohmad TBA open
2 Pengajuan simpol BI dan BII untuk mekanik OPSD-HSE-Plant komunikasi ke EBH; week 2 Mei all dept EoM Mei Open
Dokumentasi:
Plan 25.036
Actual 20.603
ach 82,29%
Plan 1.096
Actual 336
ach 30,66%
Plan Service
1 EX457 PS 500 est 9 jam
2 GD114 PS4000 est 9 jam
3 DT 3226 PS 2000 est 9 jam
4 DT 258 PS250 est 3 jam
No Activity
1 Prepare akses segmen 2 untuk coal hauling
2 Persiapan front loading untuk running fleet. (4xfleet OB)
3 Continue progres casting dozing area infra
4 Progres casting di area highwall soil
5 Prepare dumping point untuk running 4xfleet
6 Skema kepulangan karyawan shift 1 (reguler)
7 Need inspeksi bareng EBH untuk akses coal hauling di segmen 2
8 Preparation stock fuel untuk operasional
PLANT
1 Priority di DZ85
2 Priority WP
HCGS
1 Prepare bus dan elf reguler
ENGINEERING
1 Koordinasi ke tim lapangan untuk running fleet