You are on page 1of 110

Project Name

CLIENT REPORT NO : 13
CONTRACTOR DATE : 2-Jun-22
PROJECT

Project No.- Daily Progress Report


STATUS AS ON : 1-Jun-22
Weather : ✘ Sunny Windy
Cloudy Rainy
HIGHLIGHT OF THE PROJECT
Construction Daily Updates / Highlights
1 First lot FOB documentation works in Progress

Concerns

1 No progress- Awaiting plate delivery

5
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
Previous Cummulative Today Plan Cummulative % Progress
SCOPE
Sr.No Activity UOM Remarks
QTY
WTG Plan Actual Plan Actual Plan Actual Plan Actual

FOB 10% 2.52% 1.79%


Marking,Cutting & Priming works 100% 2.52% 1.79%
Sr.No Tank No. 31-Tk-002 23.97% 10.53% 7.48%
31-Tk-002 100.00% 10.53% 7.48%
M,C & P 90% 11.70% 8.31%
MT 6% 37.8 0 0 0.00% 0.00%
1 31-TK-002 Annular Plates
MT 10% 114.9 100 61 100 61 87.05% 53.10% Blasting/Painting I/P
2 31-TK-002 Bottom Plates
MT 10% 137.5 0 0 0.00% 0.00%
3 31-TK-002 Marking & Cutting of Roof Plates Plates
MT 3% 35.6 0 0 0.00% 0.00%
4 31-TK-002 Shell Course 9
MT 3% 42.8 0 0 0.00% 0.00%
5 31-TK-002 Shell Course 8
MT 3% 42.7 0 0 0.00% 0.00%
6 31-TK-002 Shell Course 7
MT 3% 56.9 0 0 0.00% 0.00%
7 31-TK-002 Shell Course 6
MT 3% 71.2 0 0 0.00% 0.00%
8 31-TK-002 Shell Course 5
MT 3% 85.4 0 0 0.00% 0.00%
9 31-TK-002 Shell Course 4
MT 3% 99.7 0 0 0.00% 0.00%
10 31-TK-002 Shell Course 3
MT 5% 113.9 0 0 0.00% 0.00%
11 31-TK-002 Shell Course 2
MT 6% 135.3 0 0 0.00% 0.00%
12 31-TK-002 Shell Course 1
MT 5% 8.9 0 0 0.00% 0.00%
13 31-TK-002 Curb Angle
MT 5% 11.7 0 0 0.00% 0.00%
14 31-TK-002 Wind Girder
MT 10% 1.0 0 0 0.00% 0.00%
15 31-TK-002 Roof Structure
MT 5% 1.0 0 0 0.00% 0.00%
16 31-TK-002 Spiral Stairway with Handrail
No's 2% 2.0 0 0 0.00% 0.00%
17 31-TK-002 Shell Manways
No's 5% 1.0 0 0 0.00% 0.00%
18 31-TK-002 Roof Nozzles
No's 3% 1.0 0 0 0.00% 0.00%
19 31-TK-002 Roof Manways
RMT 4% 1.0 0 0 0.00% 0.00%
20 31-TK-002 Tank Internal Piping
No's 3% 0.6 1 1 1 1 100.00% 100.00%
21 31-TK-002 Bottom Sump
FOB 10% 0.00% 0.00%
1 31-TK-002 Shifting of Fabricated materials to Port Lot 100% 1 0 0 0.00% 0.00%
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
FOB 10% 1.62% 1.62%
Marking,Cutting & Priming Works 100% 1.62% 1.62%
Sr.No Tank No 61-TK-001 A 5.26% 11.70% 11.70%
Fabrication 100.00% 11.70% 11.70%
M,C & P 90% 13.00% 13.0%
1 61-TK-001 A Annular Plates MT 6% 14.13 0 0 0.00% 0.00%
2 61-TK-001 A Bottom Plates MT 10% 72.42 72 72 72 72 100.00% 100.00% Blasting/Painting I/P
3 61-TK-001 A Marking & Cutting of Roof Plates Plates MT 10% 75.63 0 0 0.00% 0.00%
6 61-TK-001 A Shell Course 7 MT 3% 13.14 0 0 0.00% 0.00%
7 61-TK-001 A Shell Course 6 MT 3% 18.25 0 0 0.00% 0.00%
8 61-TK-001 A Shell Course 5 MT 3% 25.10 0 0 0.00% 0.00%
9 61-TK-001 A Shell Course 4 MT 3% 27.38 0 0 0.00% 0.00%
10 61-TK-001 A Shell Course 3 MT 4% 34.23 0 0 0.00% 0.00%
11 61-TK-001 A Shell Course 2 MT 5% 38.80 0 0 0.00% 0.00%
12 61-TK-001 A Shell Course 1 MT 5% 45.65 0 0 0.00% 0.00%
13 61-TK-001 A Curb Angle MT 4% 5.69 0 0 0.00% 0.00%
14 61-TK-001 A Wind Girder MT 4% 6.44 0 0 0.00% 0.00%
15 61-TK-001 A Roof Structure MT 10% 1.00 0 0 0.00% 0.00%
16 61-TK-001 A Spiral Stairway with Handrail MT 5% 1.00 0 0 0.00% 0.00%
17 61-TK-001 A Cooling Ring Inchdia 5% 1.00 0 0 0.00% 0.00%
18 61-TK-001 A Shell Manways No's 2% 2.00 0 0 0.00% 0.00%
19 61-TK-001 A Roof Nozzles No's 3% 1.00 0 0 0.00% 0.00%
20 61-TK-001 A Roof Manways No's 2% 1.00 0 0 0.00% 0.00%
21 61-TK-001 A Tank Internal Piping RMT 5% 1.00 0 0 0.00% 0.00%
22 61-TK-001 A Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 61-TK-001 A MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
FOB 10% 0.00% 0.00%
1 61-TK-001 A Shifting of Fabricated materials to Port (FOB) Lot 100% 1 0 0 0 0 0.00% 0.00%
Tank 60-TK-001 A 5.74% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 60-TK-001 A Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 60-TK-001 A MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 61-TK-004 A 4.51% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 61-TK-004 A Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 61-TK-004 A MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 61-TK-001 B 5.26% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 61-TK-001 B Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 61-TK-001 B MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 60-TK-101 A 5.70% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 60-TK-101 A Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 60-TK-101 A MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 60-TK-001 B 5.74% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 60-TK-001 B Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 60-TK-001 B MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 61-TK-004 B 4.51% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3.00% 3.00%
22 61-TK-004 B Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 61-TK-004 B MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%
Tank 60-TK-101 B 5.70% 2.70% 2.70%
Fabricati 100.00% 2.70% 2.70%
on
M,C & P 90% 3% 3%
22 60-TK-101 B Bottom Sump MT 3% 1.17 1 1 1 1 100.00% 100.00%
23 60-TK-101 B MVW/FOAM Ring Brackets No's 5% 1.00 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


PROGRESS PHOTOGRAPHS
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2-Jun-22
PROJECT 0

Boundry Wall excavation in progress Temporary wall Sheet works in progress


DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
Construction works 60% 4% 2.05%
Site Preperation works 5% 20.00% 20.00%
Tank Works 55% 5% 1.92%
Sr.No Tank No. 31-TK-002 23.97% 0.00% 0.00%
Erection 81.82% 0% 0%
Reciept of FOB 10% 0% 0.0%
Material
1 31-TK-002 Annular Plates MT 6% 37.8 0 0 0.00% 0.00%
2 31-TK-002 Bottom Plates MT 10% 114.9 0 0 0.00% 0.00%
3 31-TK-002 Marking & Cutting of Roof Plates MT 10% 137.5 0 0 0.00% 0.00%
4 31-TK-002 Shell Course 9 MT 3% 35.6 0 0 0.00% 0.00%
5 31-TK-002 Shell Course 8 MT 3% 42.8 0 0 0.00% 0.00%
6 31-TK-002 Shell Course 7 MT 3% 42.7 0 0 0.00% 0.00%
7 31-TK-002 Shell Course 6 MT 3% 56.9 0 0 0.00% 0.00%
8 31-TK-002 Shell Course 5 MT 3% 71.2 0 0 0.00% 0.00%
9 31-TK-002 Shell Course 4 MT 3% 85.4 0 0 0.00% 0.00%
10 31-TK-002 Shell Course 3 MT 3% 99.7 0 0 0.00% 0.00%
11 31-TK-002 Shell Course 2 MT 5% 113.9 0 0 0.00% 0.00%
12 31-TK-002 Shell Course 1 MT 6% 135.3 0 0 0.00% 0.00%
13 31-TK-002 Curb Angle MT 5% 8.9 0 0 0.00% 0.00%
14 31-TK-002 Wind Girder MT 5% 11.7 0 0 0.00% 0.00%
15 31-TK-002 Roof Structure MT 10% 1.0 0 0 0.00% 0.00%
16 31-TK-002 Spiral Stairway with Handrail MT 5% 1.0 0 0 0.00% 0.00%
17 31-TK-002 Shell Manways No's 2% 2.0 0 0 0.00% 0.00%
18 31-TK-002 Roof Nozzles No's 5% 1.0 0 0 0.00% 0.00%
19 31-TK-002 Roof Manways No's 3% 1.0 0 0 0.00% 0.00%
20 31-TK-002 Tank Internal Piping RMT 4% 1.0 0 0 0.00% 0.00%
21 31-TK-002 Bottom Sump No's 3% 0.6 0 0 0.00% 0.00%
TANK Erection 80% 0.00% 0.00%
Bottom & Annular 16% 0.00% 0.00%
1 31-TK-002 Laying of Annular Plates MT 20% 38 0 0 0.00% 0.00%
2 31-TK-002 Welding of Annular Plates RMT 30% 48 0 0 0.00% 0.00%
3 31-TK-002 Laying of Bottom Pates MT 20% 115 0 0 0.00% 0.00%
4 31-TK-002 Welding of Bootom Plates RMT 30% 1 0 0 0.00% 0.00%
Erection of Wind 3% 0.00% 0.00%
girder
1 31-TK-002 Erection & Welding of Wind Girder 1 MT 50% 1 0 0 0.00% 0.00%
2 31-TK-002 Erection & Welding of Wind Girder 2 MT 50% 1 0 0 0.00% 0.00%
Erection of SC 9 8% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 9 MT 30% 36 0 0 0.00% 0.00%
2 31-TK-002 Vertical welding of Shell course 9 RMT 30% 40 0 0 0.00% 0.00%
4 31-TK-002 Erection & Welding of Curb Angle MT 40% 1 0 0 0.00% 0.00%
Erection of Roof 20% 0.00% 0.00%
1 31-TK-002 Erection of Centre Drum No's 25% 1 0 0 0.00% 0.00%
2 31-TK-002 Erection of Roof Structure MT 25% 1 0 0 0.00% 0.00%
3 31-TK-002 Welding of Roof Structure MT 20% 1 0 0 0.00% 0.00%
4 31-TK-002 Erection of Roof Plates No's 10% 1 0 0 0.00% 0.00%
5 31-TK-002 Welding of Roof Plates RMT 20% 1 0 0 0.00% 0.00%
Erection of SC 8 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 8 MT 30% 43 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 8 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 8 to Shell 9 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 7 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 7 MT 30% 43 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 7 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 8 to Shell 7 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 6 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 6 MT 30% 57 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 6 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 7 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 5 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 5 MT 30% 71 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 5 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 6 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 4 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 4 MT 30% 85 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 4 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 5 to Shell 4 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 3 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 3 MT 30% 100 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 3 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 4 to Shell 3 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 2 5% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 2 Nos. 30% 114 0 0 0.00% 0.00%
2 31-TK-002 Vertical Welding of Shell course 2 RMT 30% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 2 to Shell 3 RMT 40% 181 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
Erection of SC 1 8% 0.00% 0.00%
1 31-TK-002 Erection of Shell Course 1 MT 30% 135 0 0 0.00% 0.00%
2 31-TK-002 Vertical welding of Shell course 1 RMT 20% 40 0 0 0.00% 0.00%
3 31-TK-002 Horizontal welding of Shell 2 to Shell 1 RMT 25% 181 0 0 0.00% 0.00%
4 31-TK-002 Horizontal welding of Shell 1 to Shell Bottom Plate RMT 25% 181 0 0 0.00% 0.00%
Installation of Spiral
Stairway & Cage Ladder 8% 0.00% 0.00%
1 31-TK-002 Erection of Spiral stairway section 1 LOT 30% 1 0 0 0.00% 0.00%
2 31-TK-002 Erection of Spiral stairway section 2 LOT 30% 1 0 0 0.00% 0.00%
3 31-TK-002 Erection of Spiral stairway section 3 LOT 25% 1 0 0 0.00% 0.00%
4 31-TK-002 Erection & welding of Cage Ladder LOT 15% 1 0 0 0.00% 0.00%
Installation of Bottom
Sump 2% 0.00% 0.00%
1 31-TK-002 Installation Bottom Sumps No's 100% 1 0 0 0.00% 0.00%
Installation of
Accessories 10% 0.00% 0.00%
31-TK-002 Tank Internal Piping No's 80% 1 0 0 0.00% 0.00%
31-TK-002 Installation of Vents No's 20% 1 0 0 0.00% 0.00%
Hydrotesting 9% 0.00% 0%
31-TK-002 Water Filling LOT 80% 2 0 0 0 0 0.00% 0.00%
31-TK-002 Dewatering LOT 20% 2 0 0 0 0 0.00% 0.00%
External Painting 9% 0.00% 0%
Inetrnal Painting 10% 0.00% 0.00%
31-TK-002 Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
31-TK-002 Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
External Painting 90% 0.00% 0.00%
1 31-TK-002 Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
2 31-TK-002 Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
Tank 47-TK-001 A 10.96% 0.00% 0.00%
Erection 81.82% 0% 0%
Reciept of FOB 10% 0% 0.0%
Material
1 47-TK-001 A Annular Plates MT 6% 15 0 0 0.00% 0.00%
2 47-TK-001 A Bottom Plates MT 8% 46 0 0 0.00% 0.00%
3 47-TK-001 A Marking & Cutting of Roof Plates Plates MT 10% 78 0 0 0.00% 0.00%
4 47-TK-001 A Shell Course 10 MT 3% 12 0 0 0.00% 0.00%
5 47-TK-001 A Shell Course 9 MT 3% 15 0 0 0.00% 0.00%
6 47-TK-001 A Shell Course 8 MT 3% 15 0 0 0.00% 0.00%
7 47-TK-001 A Shell Course 7 MT 3% 23 0 0 0.00% 0.00%
8 47-TK-001 A Shell Course 6 MT 3% 30 0 0 0.00% 0.00%
9 47-TK-001 A Shell Course 5 MT 3% 30 0 0 0.00% 0.00%
10 47-TK-001 A Shell Course 4 MT 3% 37 0 0 0.00% 0.00%
11 47-TK-001 A Shell Course 3 MT 3% 41 0 0 0.00% 0.00%
12 47-TK-001 A Shell Course 2 MT 5% 48 0 0 0.00% 0.00%
13 47-TK-001 A Shell Course 1 MT 5% 55 0 0 0.00% 0.00%
14 47-TK-001 A Curb Angle MT 5% 6 0 0 0.00% 0.00%
15 47-TK-001 A Wind Girder MT 5% 2 0 0 0.00% 0.00%
16 47-TK-001 A Roof Structure MT 10% 1 0 0 0.00% 0.00%
17 47-TK-001 A Spiral Stairway with Handrail MT 5% 1 0 0 0.00% 0.00%
18 47-TK-001 A Cooling Ring Inchdia 2% 2 0 0 0.00% 0.00%
19 47-TK-001 A Shell Manways No's 5% 1 0 0 0.00% 0.00%
20 47-TK-001 A Tank Internal Piping RMT 3% 1 0 0 0.00% 0.00%
21 47-TK-001 A Bottom Sump No's 4% 1 0 0 0.00% 0.00%
22 47-TK-001 A MVW/FOAM Ring Brackets No's 3% 1 0 0 0.00% 0.00%
TANK Erection 80% 0.00% 0.00%
Bottom & Annular 14% 0.00% 0.00%
1 47-TK-001 A Laying of Annular Plates MT 20% 15 0 0 0.00% 0.00%
2 47-TK-001 A Welding of Annular Plates RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Laying of Bottom Pates MT 20% 46 0 0 0.00% 0.00%
4 47-TK-001 A Welding of Bootom Plates RMT 30% 1 0 0 0.00% 0.00%
Erection of Wind
Girder 2% 0.00% 0.00%
1 47-TK-001 A Erection and welding of Wind Girder No's 100% 1 0 0 0.00% 0.00%
Erection of SC 10 8% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 10 No's 30% 12 0 0 0.00% 0.00%
2 47-TK-001 A Vertical welding of Shell course 10 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Welding of Shell 10 with Shell 9 RMT 10% 1 0 0 0.00% 0.00%
4 47-TK-001 A Welding of Curb Angle with Shell 10 RMT 30% 1 0 0 0.00% 0.00%
Erection of SC 9 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 9 MT 30% 15 0 0 0.00% 0.00%
2 47-TK-001 A Vertical welding of Shell course 9 RMT 15% 1 0 0 0.00% 0.00%
3 47-TK-001 A Welding of Shell 9 with Shell 8 RMT 40% 1 0 0 0.00% 0.00%
4 47-TK-001 A Erection & Welding of WG-2 MT 5% 1 0 0 0.00% 0.00%
5 47-TK-001 A Erection & Welding of Curb Angle RMT 10% 1 0 0 0.00% 0.00%
Erection of Roof 16% 0.00% 0.00%
1 47-TK-001 A Erection of Centre Drum No's 25% 1 0 0 0.00% 0.00%
2 47-TK-001 A Erection of Roof Structure MT 25% 1 0 0 0.00% 0.00%
3 47-TK-001 A Welding of Roof Structure MT 20% 1 0 0 0.00% 0.00%
4 47-TK-001 A Erection of Roof Plates MT 10% 78 0 0 0.00% 0.00%
5 47-TK-001 A Welding of Roof Plates RMT 20% 1 0 0 0.00% 0.00%
Erection of SC 8 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 8 MT 30% 15 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 8 RMT 25% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 1 0 0 0.00% 0.00%
4 47-TK-001 A Erection & Welding of WG-1 MT 5% 1 0 0 0.00% 0.00%
Erection of SC 7 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 7 MT 30% 23 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 7 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 6 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 6 MT 30% 30 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 6 RMT 30% 1 0 0 0.00% 0.00%
Format No. CT-FPC-001 Rev. 1
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
3 47-TK-001 A Horizontal welding of Shell 7 to Shell 6 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 5 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 5 MT 30% 30 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 5 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 6 to Shell 6 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 4 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 4 MT 30% 37 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 4 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 5 to Shell 4 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 3 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 3 MT 30% 41 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 3 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 4 to Shell 3 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 2 5% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 2 MT 30% 48 0 0 0.00% 0.00%
2 47-TK-001 A Vertical Welding of Shell course 2 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 2 to Shell 1 RMT 40% 1 0 0 0.00% 0.00%
Erection of SC 1 8% 0.00% 0.00%
1 47-TK-001 A Erection of Shell Course 1 MT 30% 55 0 0 0.00% 0.00%
2 47-TK-001 A Vertical welding of Shell course 10 RMT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Horizontal welding of Shell 1 to Shell Bottom Plate RMT 40% 1 0 0 0.00% 0.00%
Installation of Spiral
Stairway 10% 0.00% 0.00%
1 47-TK-001 A Erection of Spiral stairway section 1 LOT 30% 1 0 0 0.00% 0.00%
2 47-TK-001 A Erection of Spiral stairway section 2 LOT 30% 1 0 0 0.00% 0.00%
3 47-TK-001 A Erection of Spiral stairway section 3 LOT 40% 1 0 0 0.00% 0.00%
Installation of Bottom
Sump 2% 0.00% 0.00%
47-TK-001 A Installation of bottom sumps No's 100% 1 0 0 0.00% 0.00%
Installation of
Accessories 10% 0.00% 0.00%
1 47-TK-001 A Tank Internal Piping No's 80% 1 0 0 0.00% 0.00%
2 47-TK-001 A Installation of Vents No's 20% 1 0 0 0.00% 0.00%
Hydrotesting 9% 0.00% 0%
47-TK-001 A Water Filling LOT 50% 2 0 0 0 0 0.00% 0.00%
47-TK-001 A Dewatering LOT 50% 2 0 0 0 0 0.00% 0.00%
Painting 9% 0.00% 0%
Inetrnal Painting 10% 0.00% 0.00%
47-TK-001 A No's 50% 2 0 0 0 0 0.00% 0.00%
47-TK-001 A 50% 2 0 0 0 0 0.00% 0.00%
External Painting 90% 0.00% 0.00%
1 47-TK-001 A Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
2 47-TK-001 A Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT 0 REPORT NO #REF!
CONTRACTOR 0 DATE #REF!
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
Construction works 60% 4.68% 5.98%
Site Preperation works 5% 20.00% 20.00%
Tank Works 55% 6.68% 9.05%
Sr.No Tank No. 61-TK-001 A 5.26% 0.00% 0.00%
Erection 81.82% 0.00% 0.00%
Reciept of FOB 10% 0.00% 0.0%
1 61-TK-001 A Annular Plates MT 5% 13 0 0 0.00% 0.00%
2 61-TK-001 A Bottom Plates MT 6% 70 0 0 0.00% 0.00%
3 61-TK-001 A Marking & Cutting of Roof Plates Plates MT 5% 76 0 0 0.00% 0.00%
4 61-TK-001 A Shell Course 9 MT 3% 1 0 0 0.00% 0.00%
5 61-TK-001 A Shell Course 8 MT 3% 1 0 0 0.00% 0.00%
6 61-TK-001 A Shell Course 7 MT 3% 13 0 0 0.00% 0.00%
7 61-TK-001 A Shell Course 6 MT 3% 18 0 0 0.00% 0.00%
8 61-TK-001 A Shell Course 5 MT 3% 25 0 0 0.00% 0.00%
9 61-TK-001 A Shell Course 4 MT 3% 27 0 0 0.00% 0.00%
10 61-TK-001 A Shell Course 3 MT 3% 34 0 0 0.00% 0.00%
11 61-TK-001 A Shell Course 2 MT 3% 39 0 0 0.00% 0.00%
12 61-TK-001 A Shell Course 1 MT 3% 46 0 0 0.00% 0.00%
13 61-TK-001 A Curb Angle MT 5% 6 0 0 0.00% 0.00%
14 61-TK-001 A Wind Girder MT 5% 6 0 0 0.00% 0.00%
15 61-TK-001 A Roof Structure MT 10% 1 0 0 0.00% 0.00%
16 61-TK-001 A Spiral Stairway with Handrail MT 5% 1 0 0 0.00% 0.00%
17 61-TK-001 A Cooling Ring Inchdia 5% 1 0 0 0.00% 0.00%
18 61-TK-001 A Shell Manways No's 5% 1 0 0 0.00% 0.00%
19 61-TK-001 A Roof Nozzles No's 5% 1 0 0 0.00% 0.00%
20 61-TK-001 A Roof Manways No's 3% 1 0 0 0.00% 0.00%
21 61-TK-001 A Tank Internal Piping RMT 5% 1 0 0 0.00% 0.00%
22 61-TK-001 A Bottom Sump No's 3% 1 0 0 0.00% 0.00%
23 61-TK-001 A MVW/FOAM Ring Brackets No's 6% 1 0 0 0.00% 0.00%
TANK Erection 80% 0.00% 0%
Bottom & Annular 20% 0.00% 0.00%
1 61-TK-001 A Laying of Annular Plates MT 20% 13 0 0 0.00% 0.00%
2 61-TK-001 A Welding of Annular Plates RMT 30% 48 0 0 0.00% 0.00%
3 61-TK-001 A Laying of Bottom Pates MT 20% 70 0 0 0.00% 0.00%
4 61-TK-001 A Welding of Bootom Plates RMT 30% 1 0 0 0.00% 0.00%
Erection of Wind girder 10% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 9 No's 30% 1 0 0 0.00% 0.00%
2 61-TK-001 A Vertical welding of Shell course 9 RMT 30% 1 0 0 0.00% 0.00%
3 61-TK-001 A Welding of Shell 9 with Shell 8 RMT 10% 1 0 0 0.00% 0.00%
4 61-TK-001 A Welding of Curb Angle with Shell 9 RMT 30% 1 0 0 0.00% 0.00%
Erection of SC 9 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 9 MT 30% 1 0 0 0.00% 0.00%
2 61-TK-001 A Vertical welding of Shell course 9 RMT 15% 40 0 0 0.00% 0.00%
3 61-TK-001 A Welding of Shell 9 with Shell 8 RMT 40% 181 0 0 0.00% 0.00%
4 61-TK-001 A Erection & Welding of WG-2 MT 5% 1 0 0 0.00% 0.00%
5 61-TK-001 A Erection & Welding of Curb Angle RMT 10% 1 0 0 0.00% 0.00%
Erection of Roof 10% 0.00% 0.00%
1 61-TK-001 A Erection of Centre Drum No's 25% 1 0 0 0.00% 0.00%
2 61-TK-001 A Erection of Roof Structure MT 25% 1 0 0 0.00% 0.00%
3 61-TK-001 A Welding of Roof Structure MT 20% 1 0 0 0.00% 0.00%
4 61-TK-001 A Erection of Roof Plates MT 10% 76 0 0 0.00% 0.00%
5 61-TK-001 A Welding of Roof Plates RMT 20% 1 0 0 0.00% 0.00%
Erection of SC 8 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 8 MT 30% 1 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 8 RMT 25% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 181 0 0 0.00% 0.00%
4 61-TK-001 A Erection & Welding of WG-1 MT 5% 1 0 0 0.00% 0.00%
Erection of Cooling Ring 3% 0.00% 0.00%
1 61-TK-001 A Erection and welding of Cooling Ring Supports No's 20% 1 0 0 0.00% 0.00%
2 61-TK-001 A Erection of Roof Rings RMT 15% 1 0 0 0.00% 0.00%
3 61-TK-001 A Erection of First MVW Ring and Foam Ring RMT 30% 1 0 0 0.00% 0.00%
4 61-TK-001 A Erection of Second MVW Ring RMT 20% 1 0 0 0.00% 0.00%
5 61-TK-001 A Erection of Risers RMT 15% 1 0 0 0.00% 0.00%
Erection of SC 7 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 7 MT 30% 13 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 7 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 6 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 6 MT 30% 18 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 6 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 7 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 5 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 5 MT 30% 25 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 5 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 6 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 4 5% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 4 MT 30% 27 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 4 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 5 to Shell 4 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 3 6% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 3 MT 30% 34 0 0 0.00% 0.00%
2 61-TK-001 A Vertical Welding of Shell course 3 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 4 to Shell 3 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 2 7% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 2 Nos. 30% 39 0 0 0.00% 0.00%
Format No. CT-FPC-001 Rev. 1
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO #REF!
CONTRACTOR 0 DATE #REF!
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
2 61-TK-001 A Vertical Welding of Shell course 2 RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Horizontal welding of Shell 2 to Shell 1 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 1 7% 0.00% 0.00%
1 61-TK-001 A Erection of Shell Course 1 MT 30% 46 0 0 0.00% 0.00%
2 61-TK-001 A Vertical welding
Horizontal of Shell
welding course
of Shell 10 Bottom
1 to Shell RMT 30% 40 0 0 0.00% 0.00%
3 61-TK-001 A Plate RMT 40% 181 0 0 0.00% 0.00%
Installation of Spiral
Stairway 4% 0.00% 0.00%
1 61-TK-001 A Erection of Spiral stairway section 1 LOT 30% 1 0 0 0.00% 0.00%
2 61-TK-001 A Erection of Spiral stairway section 2 LOT 30% 1 0 0 0.00% 0.00%
3 61-TK-001 A Erection of Spiral stairway section 3 LOT 40% 1 0 0 0.00% 0.00%
Installation of
Appurtenances 3% 0.00% 0.00%
61-TK-001 A No's 100% 1 0 0 0.00% 0.00%
Installation of
Accessories 10% 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
61-TK-001 A No's 11% 1 0 0 0.00% 0.00%
Hydrotesting 9% 0.00% 0%
61-TK-001 A Water Filling LOT 50% 2 0 0 0 0 0.00% 0.00%
61-TK-001 A Dewatering LOT 50% 2 0 0 0 0 0.00% 0.00%
External Painting 9% 0.00% 0%
Inetrnal Painting 10% 0.00% 0.00%
61-TK-001 A Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
61-TK-001 A Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
External Painting 90% 0.00% 0.00%
1 61-TK-001 A Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
2 61-TK-001 A Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
Tank 60-TK-001 A 5.74% 0.00% 0.00%
Erection 81.82% 0% 0%
Reciept of FOB 10% 0% 0.0%
1 60-TK-001 A Annular Plates MT 5% 12 0 0 0.00% 0.00%
2 60-TK-001 A Bottom Plates MT 6% 65 0 0 0.00% 0.00%
3 60-TK-001 A Marking & Cutting of Roof Plates Plates MT 5% 72 0 0 0.00% 0.00%
4 60-TK-001 A Shell Course 9 MT 3% 1 0 0 0.00% 0.00%
5 60-TK-001 A Shell Course 8 MT 3% 1 0 0 0.00% 0.00%
6 60-TK-001 A Shell Course 7 MT 3% 18 0 0 0.00% 0.00%
7 60-TK-001 A Shell Course 6 MT 3% 22 0 0 0.00% 0.00%
8 60-TK-001 A Shell Course 5 MT 3% 27 0 0 0.00% 0.00%
9 60-TK-001 A Shell Course 4 MT 3% 29 0 0 0.00% 0.00%
10 60-TK-001 A Shell Course 3 MT 3% 36 0 0 0.00% 0.00%
11 60-TK-001 A Shell Course 2 MT 3% 44 0 0 0.00% 0.00%
12 60-TK-001 A Shell Course 1 MT 3% 49 0 0 0.00% 0.00%
13 60-TK-001 A Curb Angle MT 5% 4 0 0 0.00% 0.00%
14 60-TK-001 A Wind Girder MT 5% 4 0 0 0.00% 0.00%
15 60-TK-001 A Roof Structure MT 10% 1 0 0 0.00% 0.00%
16 60-TK-001 A Spiral Stairway with Handrail MT 5% 1 0 0 0.00% 0.00%
17 60-TK-001 A Cooling Ring Inchdia 5% 1 0 0 0.00% 0.00%
18 60-TK-001 A Shell Manways No's 5% 1 0 0 0.00% 0.00%
19 60-TK-001 A Roof Nozzles No's 5% 1 0 0 0.00% 0.00%
20 60-TK-001 A Roof Manways No's 3% 1 0 0 0.00% 0.00%
21 60-TK-001 A Tank Internal Piping RMT 5% 1 0 0 0.00% 0.00%
22 60-TK-001 A Bottom Sump No's 3% 1 0 0 0.00% 0.00%
23 60-TK-001 A MVW/FOAM Ring Brackets No's 6% 1 0 0 0.00% 0.00%
TANK Erection 80% 0.00% 0%
Bottom & Annular 20% 0.00% 0.00%
1 60-TK-001 A Laying of Annular Plates MT 20% 12 0 0 0.00% 0.00%
2 60-TK-001 A Welding of Annular Plates RMT 30% 48 0 0 0.00% 0.00%
3 60-TK-001 A Laying of Bottom Pates MT 20% 65 0 0 0.00% 0.00%
4 60-TK-001 A Welding of Bootom Plates RMT 30% 1 0 0 0.00% 0.00%
Erection of Wind girder 10% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 9 No's 30% 1 0 0 0.00% 0.00%
2 60-TK-001 A Vertical welding of Shell course 9 RMT 30% 1 0 0 0.00% 0.00%
3 60-TK-001 A Welding of Shell 9 with Shell 8 RMT 10% 1 0 0 0.00% 0.00%
4 60-TK-001 A Welding of Curb Angle with Shell 9 RMT 30% 1 0 0 0.00% 0.00%
Erection of SC 9 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 9 MT 30% 1 0 0 0.00% 0.00%
2 60-TK-001 A Vertical welding of Shell course 9 RMT 15% 40 0 0 0.00% 0.00%
3 60-TK-001 A Welding of Shell 9 with Shell 8 RMT 40% 181 0 0 0.00% 0.00%
4 60-TK-001 A Erection & Welding of WG-2 MT 5% 1 0 0 0.00% 0.00%
5 60-TK-001 A Erection & Welding of Curb Angle RMT 10% 1 0 0 0.00% 0.00%
Erection of Roof 10% 0.00% 0.00%
1 60-TK-001 A Erection of Centre Drum No's 25% 1 0 0 0.00% 0.00%
2 60-TK-001 A Erection of Roof Structure MT 25% 1 0 0 0.00% 0.00%
3 60-TK-001 A Welding of Roof Structure MT 20% 1 0 0 0.00% 0.00%
4 60-TK-001 A Erection of Roof Plates MT 10% 72 0 0 0.00% 0.00%
5 60-TK-001 A Welding of Roof Plates RMT 20% 1 0 0 0.00% 0.00%
Erection of SC 8 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 8 MT 30% 1 0 0 0.00% 0.00%
Format No. CT-FPC-001 Rev. 1
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO #REF!
CONTRACTOR 0 DATE #REF!
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress Actual
Sr.No Activity UOM Delay Reason Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual Start Finish
2 60-TK-001 A Vertical Welding of Shell course 8 RMT 25% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 181 0 0 0.00% 0.00%
4 60-TK-001 A Erection & Welding of WG-1 MT 5% 1 0 0 0.00% 0.00%
Erection of Cooling Ring 3% 0.00% 0.00%
1 60-TK-001 A Erection and welding of Cooling Ring Supports No's 20% 1 0 0 0.00% 0.00%
2 60-TK-001 A Erection of Roof Rings RMT 15% 1 0 0 0.00% 0.00%
3 60-TK-001 A Erection of First MVW Ring and Foam Ring RMT 30% 1 0 0 0.00% 0.00%
4 60-TK-001 A Erection of Second MVW Ring RMT 20% 1 0 0 0.00% 0.00%
5 60-TK-001 A Erection of Risers RMT 15% 1 0 0 0.00% 0.00%
Erection of SC 7 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 7 MT 30% 18 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 7 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 8 to Shell 7 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 6 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 6 MT 30% 22 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 6 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 7 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 5 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 5 MT 30% 27 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 5 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 6 to Shell 6 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 4 5% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 4 MT 30% 29 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 4 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 5 to Shell 4 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 3 6% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 3 MT 30% 36 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 3 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 4 to Shell 3 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 2 7% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 2 Nos. 30% 44 0 0 0.00% 0.00%
2 60-TK-001 A Vertical Welding of Shell course 2 RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Horizontal welding of Shell 2 to Shell 1 RMT 40% 181 0 0 0.00% 0.00%
Erection of SC 1 7% 0.00% 0.00%
1 60-TK-001 A Erection of Shell Course 1 MT 30% 49 0 0 0.00% 0.00%
2 60-TK-001 A Horizontal
Vertical welding of Shell
welding course
of Shell 10 Bottom
1 to Shell RMT 30% 40 0 0 0.00% 0.00%
3 60-TK-001 A Plate RMT 40% 181 0 0 0.00% 0.00%
Installation of Spiral
Stairway 4% 0.00% 0.00%
1 60-TK-001 A Erection of Spiral stairway section 1 LOT 30% 1 0 0 0.00% 0.00%
2 60-TK-001 A Erection of Spiral stairway section 2 LOT 30% 1 0 0 0.00% 0.00%
3 60-TK-001 A Erection of Spiral stairway section 3 LOT 40% 1 0 0 0.00% 0.00%
Installation of
Appurtenances 3% 0.00% 0.00%
60-TK-001 A No's 100% 1 0 0 0.00% 0.00%
Installation of 10% 0.00% 0.00%
Accessories
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
60-TK-001 A No's 11% 1 0 0 0.00% 0.00%
Hydrotesting 9% 0.00% 0%
60-TK-001 A Water Filling LOT 50% 2 0 0 0 0.00% 0.00%
60-TK-001 A Dewatering LOT 50% 2 0 0 0 0.00% 0.00%
External Painting 9% 0.00% 0%
Inetrnal Painting 10% 0.00% 0.00%
60-TK-001 A Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
60-TK-001 A Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
External Painting 90% 0.00% 0.00%
1 60-TK-001 A Intermediate Coat SQM 50% 2 0 0 0 0 0.00% 0.00%
2 60-TK-001 A Final Coat SQM 50% 2 0 0 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


TANK WISE STATUS
FOUNDATION HANDOVER MECHANICAL CLEARANCE HYDRO TEST FINAL PAINTING CALIBRATION TANK HANDOVER (Format-III)
SR. PACKAGE TANK NO DIMENSION TANK
NO TYPE
COMP. U/P BAL. 0 COMP. U/P BAL. 0 COMP. U/P BAL. 0 COMP. U/P BAL. 0 COMP. U/P BAL. 0 COMP. U/P BAL. 0
DIA X HEIGHT
1 AST-I 06-TK-301 4 X 7.05 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
2 AST-I 06-TK-302 4 X 7.05 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
3 AST-I 07-TK-001 27.6 X 15.6 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
4 AST-I 08-TK-001 11 X 12 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
5 AST-I 31-TK-001 A 35.5 X 17.3 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
6 AST-I 31-TK-001 B 35.5 X 17.3 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
7 AST-I 31-TK-002 57.7 X 23.3 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
8 AST-I 31-TK-003 18 X 17.15 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
9 AST-I 31-TK-004 12.7 X 16.8 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
10 AST-I 33-TK-001 25.5 X 17.25 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
11 AST-I 34-TK-010 6.6 X 7.2 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
12 AST-I 35-TK-001 10.5 X 14.4 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
13 AST-II 43-TK-001 7.5 X 12 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
14 AST-I 44-TK-001 A 3 X 5.4 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
15 AST-I 44-TK-001 B 3 X 5.4 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
16 AST-I 46-TK-001 A 18 X 18 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
17 AST-I 46-TK-001 B 18 X 18 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
18 AST-I 46-TK-002 A 25.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
19 AST-I 46-TK-002 B 25.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
20 AST-I 47-TK-001 A 37 X 23 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
21 AST-I 47-TK-001 B 37 X 23 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
22 AST-II 48-TK-001 8 X 12 CRT BAL. BAL. BAL. BAL. BAL. BAL. Y
23 AST-I 49-TK-001 A 13.5 X 12 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
24 AST-I 49-TK-001 B 13.5 X 12 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
25 AST-II 60-TK-001 A 36 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
26 AST-II 60-TK-001 B 36 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
27 AST-II 60-TK-002 A 15 X 16.5 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
28 AST-II 60-TK-002 B 15 X 16.5 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
29 AST-II 60-TK-101 A 36.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
30 AST-II 60-TK-101 B 36.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
31 AST-II 61-TK-001 A 37 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
32 AST-II 61-TK-001 B 37 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
33 AST-II 61-TK-002 24 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
34 AST-II 61-TK-003 18 X 16.8 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
35 AST-II 61-TK-004 A 35 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
36 AST-II 61-TK-004 B 35 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
37 AST-II 62-TK-001 A 32 X 19.2 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
38 AST-II 62-TK-001 B 32 X 19.2 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
39 AST-II 62-TK-002 A 13.5 X 14.4 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
40 AST-II 62-TK-002 B 13.5 X 14.4 DRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
41 AST-II 62-TK-003 A 19.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
42 AST-II 62-TK-003 B 19.5 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
43 AST-II 62-TK-004 A 45 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
44 AST-II 62-TK-004 C 45 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
45 AST-II 62-TK-006 A 13.5 X 14.4 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
46 AST-II 62-TK-006 B 13.5 X 14.4 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
47 AST-II 62-TK-008 A 12 X 18 CRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
48 AST-II 62-TK-008 B 12 X 18 CRT-IFR BAL. BAL. BAL. BAL. BAL. BAL. Y
49 AST-II 62-TK-101 A 40 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
50 AST-II 62-TK-101 B 40 X 16.8 DRT BAL. BAL. BAL. BAL. BAL. BAL. Y
Y Y Y Y Y Y y y y y y y y y y y y y y y y y y y y y y y y y Y
Total
Local
Expat
Expat/Local

0
Project Management

0
Manager

0
Engineer

0
Hse Staff

0
QA/QC Staff

0
HR/Admin Staff
0

Store/Procuremnet Staff
0

Superitendent
0

Supervisor
0

Foreman
0

Surveyor
0

Document Controller
0

Data Entry Operator


AS TI & AS T
0
Technician

0
Operator

0
Fabricator
AS TI & AS TII

0
Fitter

0
Gas Cutter

0
Grinder

0
Welder
0
Rigger
0

Khalasi
0

Helper
0

scaffolder
0

Electrician
0

Blaster
0

Painter
0

Civil Workers
0
Miscellaneous

Total

0
0
0
DAILY PROGRESS REPORT
CLIENT 0 REPORT NO 13
CONTRACTOR 0 DATE 2/Jun/22
PROJECT 0
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual

20.0% 20.0%
Site Office 20% 100.0% 100.0%
1 Mobilization /Assembly of Office Cabins No's 90% 5 5 5 5 5 100.00% 100.00%
2 Mobilization/Assembly of Ablution unit No's 10% 2 2 2 2 2 100.00% 100.00%
Warehouse 40% 0.0% 0.0%
1 Levelling SQM 25% 20768 0 0 0.00% 0.00%
2 PCC SQM 30% 20768 0 0 0.00% 0.00%
Scope quantity increased as per
No's 10% 92 0 0 0.00% 0.00%
3 Placemnet of Containers requiremnet
4 Roof Works No's 10% 3 0 0 0.00% 0.00%
5 Installatioin of Racks No's 5% 12 0 0 0.00% 0.00%
6 Electrification/Lighting works No's 10% 2 0 0 0.00% 0.00%
7 Installation of DG for Site Office ,Store & Ware house No's 10% 2 0 0 0.00% 0.00%
Laydown Area 20% 0.0% 0.0%
1 Cleaning CUM 50% 40 0 0 0.00% 0.00%
2 Levelling if required CUM 50% 36 0 0 0.00% 0.00%
Water & Utility arrangemnet Works 10% 0.0% 0.0%
1 Excavation CUM 20% 200 0 0 0.00% 0.00%
2 Pipe laying RMT 30% 1000 0 0 0.00% 0.00%
3 Back filling CUM 20% 195 0 0 0.00% 0.00%
Scope Quatity may change as per
No's 20% 2 0 0 0.00% 0.00%
4 Installation of Water Tank if required requirement

5 Installation of Water Pump if required No's 10% 1 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


Area TK No Total Percentage Construction only Area
AS TI 06-TK-301 0.118 0.113 AS TI
AS TI 06-TK-302 0.118 0.113 AS TI
AS TI 07-TK-001 2.341 2.415 AS TI
AS TI 08-TK-001 0.562 0.627 AS TI
AS TI 31-TK-001 A 2.791 2.917 AS TI
AS TI 31-TK-001 B 2.791 2.917 AS TI
AS TI 31-TK-002 9.251 9.90753 AS TI
AS TI 31-TK-003 0.917 0.962 AS TI
AS TI 31-TK-004 0.532 0.552 AS TI
AS TI 33-TK-001 1.552 1.642 AS TI
AS TI 34-TK-010 0.254 0.186 AS TI
AS TI 35-TK-001 0.378 0.389 AS TI
AS TI 44-TK-001 A 0.085 0.079 AS TI
AS TI 44-TK-001 B 0.085 0.079 AS TI
AS TI 46-TK-001 A 1.338 1.206 AS TI
AS TI 46-TK-001 B 1.338 1.206 AS TI
AS TI 46-TK-002 A 1.634 1.576 AS TI
AS TI 46-TK-002 B 1.634 1.576 AS TI
AS TI 47-TK-001 A 4.230 4.512 AS TI
AS TI 47-TK-001 B 4.230 4.512 AS TI
AS TI 49-TK-001 A 1.210 1.077 AS TI
AS TI 49-TK-001 B 1.210 1.077 AS TI
AS TII 43-TK-001 0.301 0.301 AS TII
AS TII 48-TK-001 0.255 0.234 AS TII
AS TII 60-TK-001 A 3.524 3.494 AS TII
AS TII 60-TK-001 B 3.524 3.494 AS TII
AS TII 60-TK-002 A 3.144 3.029 AS TII
AS TII 60-TK-002 B 3.144 3.029 AS TII
AS TII 60-TK-101 A 3.502 3.550 AS TII
AS TII 60-TK-101 B 3.502 3.550 AS TII
AS TII 61-TK-001 A 3.230 3.236 AS TII
AS TII 61-TK-001 B 3.230 3.236 AS TII
AS TII 61-TK-002 7.311 7.036 AS TII
AS TII 61-TK-003 5.445 5.603 AS TII
AS TII 61-TK-004 A 2.769 2.806 AS TII
AS TII 61-TK-004 B 2.769 2.806 AS TII
AS TII 62-TK-001 A 0.878 0.883 AS TII
AS TII 62-TK-001 B 0.878 0.883 AS TII
AS TII 62-TK-002 A 1.107 1.047 AS TII
AS TII 62-TK-002 B 1.107 1.047 AS TII
AS TII 62-TK-003 A 0.580 0.550 AS TII
AS TII 62-TK-003 B 0.580 0.550 AS TII
AS TII 62-TK-004 A 1.387 1.236 AS TII
AS TII 62-TK-004 C 1.387 1.236 AS TII
AS TII 62-TK-006 A 2.669 2.573 AS TII
AS TII 62-TK-006 B 2.669 2.573 AS TII
AS TII 62-TK-008 A 0.618 0.582 AS TII
AS TII 62-TK-008 B 0.618 0.582 AS TII
AS TII 62-TK-101 A 0.638 0.606 AS TII
AS TII 62-TK-101 B 0.638 0.606 AS TII
100.000

WTG as per AmountWTG as per MT


AS TI 06-TK-301 0.305% 0.286% -0.019200%
AS TI 06-TK-302 0.305% 0.286% -0.019200%
AS TI 07-TK-001 6.065% 6.093% 0.027835%
AS TI 08-TK-001 1.457% 1.581% 0.124156%
AS TI 31-TK-001 A 7.231% 7.359% 0.128056%
AS TI 31-TK-001 B 7.231% 7.359% 0.128056%
AS TI 31-TK-002 23.969% 24.992% 1.023405%
AS TI 31-TK-003 2.375% 2.427% 0.051819%
AS TI 31-TK-004 1.379% 1.393% 0.014136%
AS TI 33-TK-001 4.020% 4.142% 0.122307%
AS TI 34-TK-010 0.657% 0.469% -0.188555%
AS TI 35-TK-001 0.980% 0.980% 0.000780%
AS TI 44-TK-001 A 0.220% 0.198% -0.021699%
AS TI 44-TK-001 B 0.220% 0.198% -0.021699%
AS TI 46-TK-001 A 3.466% 3.042% -0.423255%
AS TI 46-TK-001 B 3.466% 3.042% -0.423255%
AS TI 46-TK-002 A 4.233% 3.976% -0.256454%
AS TI 46-TK-002 B 4.233% 3.976% -0.256454%
AS TI 47-TK-001 A 10.959% 11.382% 0.422790%
AS TI 47-TK-001 B 10.959% 11.382% 0.422790%
AS TI 49-TK-001 A 3.136% 2.718% -0.418179%
AS TI 49-TK-001 B 3.136% 2.718% -0.418179%
100%

24,819,610
AS TI 06-TK-301 75,680 0.30% 0.2857%
AS TI 06-TK-302 75,680 0.30% 0.2857%
AS TI 07-TK-001 1,505,290 6.06% 6.0928%
AS TI 08-TK-001 361,630 1.46% 1.5812%
AS TI 31-TK-001 A 1,794,795 7.23% 7.3594%
AS TI 31-TK-001 B 1,794,795 7.23% 7.3594%
AS TI 31-TK-002 5,949,000 23.97% 24.9924%
AS TI 31-TK-003 589,400 2.37% 2.4266%
AS TI 31-TK-004 342,170 1.38% 1.3928%
AS TI 33-TK-001 997,710 4.02% 4.1422%
AS TI 34-TK-010 163,100 0.66% 0.4686%
AS TI 35-TK-001 243,150 0.98% 0.9804%
AS TI 44-TK-001 A 54,595 0.22% 0.1983%
AS TI 44-TK-001 B 54,595 0.22% 0.1983%
AS TI 46-TK-001 A 860,180 3.47% 3.0425%
AS TI 46-TK-001 B 860,180 3.47% 3.0425%
AS TI 46-TK-002 A 1,050,535 4.23% 3.9762%
AS TI 46-TK-002 B 1,050,535 4.23% 3.9762%
AS TI 47-TK-001 A 2,719,930 10.96% 11.3816%
AS TI 47-TK-001 B 2,719,930 10.96% 11.3816%
AS TI 49-TK-001 A 778,365 3.14% 2.7179%
AS TI 49-TK-001 B 778,365 3.14% 2.7179%
Over All
TNK no Area
31-TK-002 AS TI Area G300
61-TK-001 A AS TII Area D400
47-TK-001 A AS TI Area G300
60-TK-001 A AS TII Area D100
62-TK-004 A AS TII Area D100
61-TK-004 A AS TII Area D400
31-TK-001 A AS TI Area G300
61-TK-001 B AS TII Area D400
62-TK-101 A AS TII Area D200
60-TK-101 A AS TII Area D300
60-TK-001 B AS TII Area D100
47-TK-001 B AS TI Area G300
61-TK-004 B AS TII Area D400
62-TK-004 C AS TII Area D100
46-TK-002 A AS TI Area L200
33-TK-001 AS TI Area G300
31-TK-001 B AS TI Area G300
46-TK-002 B AS TI Area L200
62-TK-006 A AS TII Area D400
62-TK-101 B AS TII Area D200
31-TK-003 AS TI Area G300
60-TK-101 B AS TII Area D300
62-TK-006 B AS TII Area D400
62-TK-001 A AS TII Area D200
07-TK-001 AS TI Area K200
35-TK-001 AS TI Area G300
61-TK-002 AS TII Area D400
31-TK-004 AS TI Area G300
48-TK-001 AS TII Area D300
46-TK-001 A AS TI Area L200
62-TK-008 A AS TII Area D200
60-TK-002 A AS TII Area D200
34-TK-010 AS TI Area G200
44-TK-001 A AS TI Area G300
62-TK-003 A AS TII Area D300
46-TK-001 B AS TI Area L200
62-TK-008 B AS TII Area D200
60-TK-002 B AS TII Area D200
62-TK-001 B AS TII Area D200
44-TK-001 B AS TI Area G300
49-TK-001 A AS TI Area K300
62-TK-003 B AS TII Area D300
61-TK-003 AS TII Area D200
62-TK-002 B AS TII Area D200
49-TK-001 B AS TI Area K300
62-TK-002 A AS TII Area D200
43-TK-001 AS TII Area A200
06-TK-301 AS TI Area K200
08-TK-001 AS TI Area K200
06-TK-302 AS TI Area K200

WTG WTG1
60%
Site Preperation 5%
Construction 55%
Erection
Reciept of FOB Material
Installation of Main Parts
Installtion of Accessories
Hydrotest
Painting

-0.0192%
-0.0192%
0.0278%
0.1242%
0.1281%
0.1281%
1.0234%
0.0518%
0.0141%
0.1223%
-0.1886%
0.0008%
-0.0217%
-0.0217%
-0.4233%
-0.4233%
-0.2565%
-0.2565%
0.4228%
0.4228%
-0.4182%
-0.4182%
0.000000000000%
Over All
Start date %Against Total Amount % Against only ConstructionOnly Constr Against AST-I Value
5-Jun-22 9.251 9.25% 9.9075348 9.91% 0.23968950358
9-Jun-22 3.230 3.23% 3.2363728 3.24%
21-Jun-22 4.230 4.23% 4.5119172 4.51% 0.10958794276
26-Jun-22 3.524 3.52% 3.494192 3.49%
8-Jul-22 1.387 1.39% 1.2364687 1.24%
19-Jul-22 2.769 2.77% 2.8059594 2.81%
26-Aug-22 2.791 2.79% 2.9174383 2.92% 0.07231358591
26-Aug-22 3.230 3.23% 3.2363728 3.24%
10-Sep-22 0.638 0.64% 0.6055839 0.61%
2-Oct-22 3.502 3.50% 3.5504824 3.55%
11-Oct-22 3.524 3.52% 3.494192 3.49%
24-Oct-22 4.230 4.23% 4.5119172 4.51% 0.10958794276
25-Nov-22 2.769 2.77% 2.8059594 2.81%
26-Nov-22 1.387 1.39% 1.2364687 1.24%
5-Dec-22 1.634 1.63% 1.5762664 1.58% 0.04232681335
12-Dec-22 1.552 1.55% 1.6420428 1.64% 0.04019845598
19-Dec-22 2.791 2.79% 2.9174383 2.92% 0.07231358591
5-Jan-23 1.634 1.63% 1.5762664 1.58% 0.04232681335
30-Jan-23 2.669 2.67% 2.572503 2.57%
31-Jan-23 0.638 0.64% 0.6055839 0.61%
1-Feb-23 0.917 0.92% 0.9619411 0.96% 0.02374735139
5-Feb-23 3.502 3.50% 3.5504824 3.55%
21-Feb-23 2.669 2.67% 2.572503 2.57%
24-Feb-23 0.878 0.88% 0.8827324 0.88%
7-Mar-23 2.341 2.34% 2.4153067 2.42% 0.06064922052
16-Mar-23 0.378 0.38% 0.3886721 0.39% 0.00979668899
31-Mar-23 7.311 7.31% 7.036484 7.04%
4-Apr-23 0.532 0.53% 0.5521229 0.55% 0.01378627625
15-Apr-23 0.255 0.26% 0.2344839 0.23%
5-May-23 1.338 1.34% 1.2061046 1.21% 0.03465727302
17-May-23 0.618 0.62% 0.581936 0.58%
18-May-23 3.144 3.14% 3.0288576 3.03%
24-May-23 0.254 0.25% 0.1857585 0.19% 0.00657141671
10-Jun-23 0.085 0.08% 0.0785981 0.08% 0.00219967195
17-Jun-23 0.580 0.58% 0.5495615 0.55%
20-Jun-23 1.338 1.34% 1.2061046 1.21% 0.03465727302
21-Jun-23 0.618 0.62% 0.581936 0.58%
22-Jun-23 3.144 3.14% 3.0288576 3.03%
3-Jul-23 0.878 0.88% 0.8827324 0.88%
18-Jul-23 0.085 0.08% 0.0785981 0.08% 0.00219967195
3-Aug-23 1.210 1.21% 1.0774408 1.08% 0.03136088762
10-Aug-23 0.580 0.58% 0.5495615 0.55%
13-Aug-23 5.445 5.44% 5.6025073 5.60%
14-Aug-23 1.107 1.11% 1.0470618 1.05%
14-Aug-23 1.210 1.21% 1.0774408 1.08% 0.03136088762
17-Aug-23 1.107 1.11% 1.0470618 1.05%
19-Aug-23 0.301 0.30% 0.3008411 0.30%
26-Sep-23 0.117689 0.12% 0.1132659 0.11% 0.00304920182
8-Oct-23 0.562 0.56% 0.6268194 0.63% 0.0145703337
19-Oct-23 0.118 0.12% 0.1132659 0.11% 0.00304920182
100.000 100.00% 100.00%

WTG2 WTG3

8.3333%
91.6667%
45% 81.818181818%
10% 8.18%
80% 65.45%
10% 8.18%
5% 9.0909090909090900%
5% 9.0909090909090900%
Constr Against AST-I Value
23.969%
47-TK-001 A
10.959%
47-TK-001 B
46-TK-002 A
33-TK-001
7.231%
46-TK-002 B
31-TK-003
07-TK-001
35-TK-001
10.959%
46-TK-001 A
34-TK-010
4.233%
4.020%
7.231%
4.233%
49-TK-001 B
06-TK-301
2.375%
06-TK-302

6.065%
0.980%

1.379%

3.466%

0.657%
0.220%

3.466%

0.220%
3.136%

3.136%
0.305%
1.457%
0.305%

100%
Sump 47
Delivered

PL AC VR
BG 10% 100% -100%
PO 5% 100% -100%
ENG 5% 0%
Material Reciept 5% 0.169% 0% 0.020%
FOB 10% 0.169% 0% 0.017%
Cosntr 60% 0%
Hydro 3% 0%
Data Book 2% 0%

Scurve %
Engineering 5.00%
Procurement 15.00%
Fabrication (FOB) 20.00%
Eretion & handove 60.00%
PO FAB
0.398%
20 0.169%
11800
Engineerin TANK No DRW No

31-TK-002
VN2154-101-A-DGN-0401

VN2154-101-A-DGN-0026
VN2154-101-A-DGN-0106
VN2154-101-A-DGN-0402
VN2154-101-A-DGN-0064
47-TK-001 A
VN2154-101-A-DGN-0851

VN2154-101-A-DGN-0035
VN2154-101-A-DGN-0115
VN2154-101-A-DGN-0851
VN2154-101-A-DGN-0072
31-TK-001 A
VN2154-101-A-DGN-0351

VN2154-101-A-DGN-0025
VN2154-101-A-DGN-0105
VN2154-101-A-DGN-0352
VN2154-101-A-DGN-0063
47-TK-001 B
VN2154-101-A-DGN-0851
0
VN2154-101-A-DGN-0035
VN2154-101-A-DGN-0115
VN2154-101-A-DGN-0851
VN2154-101-A-DGN-0072
46-TK-002 A
VN2154-101-A-DGN-0801

VN2154-101-A-DGN-0034
VN2154-101-A-DGN-0114
VN2154-101-A-DGN-0802
VN2154-101-A-DGN-0071
33-TK-001
VN2154-101-A-DGN-0551

VN2154-101-A-DGN-0029
VN2154-101-A-DGN-0109
VN2154-101-A-DGN-0552
VN2154-101-A-DGN-0067
31-TK-001 B
VN2154-101-A-DGN-0351
0
VN2154-101-A-DGN-0025
VN2154-101-A-DGN-0105
VN2154-101-A-DGN-0352
VN2154-101-A-DGN-0063
46-TK-002 B
VN2154-101-A-DGN-0801
0
VN2154-101-A-DGN-0034
VN2154-101-A-DGN-0114
VN2154-101-A-DGN-0802
VN2154-101-A-DGN-0071
31-TK-003
VN2154-101-A-DGN-0451

VN2154-101-A-DGN-0027
VN2154-101-A-DGN-0107
VN2154-101-A-DGN-0452
VN2154-101-A-DGN-0065
07-TK-001
VN2154-101-A-DGN-0251

VN2154-101-A-DGN-0023
VN2154-101-A-DGN-0103
VN2154-101-A-DGN-0252
'VN2154-101-A-DGN-0061
35-TK-001
VN2154-101-A-DGN-0651

'VN2154-101-A-DGN-0031
VN2154-101-A-DGN-0111
VN2154-101-A-DGN-0652
VN2154-101-A-DGN-0068
31-TK-004
VN2154-101-A-DGN-0501

VN2154-101-A-DGN-0028
VN2154-101-A-DGN-0108
VN2154-101-A-DGN-0502
VN2154-101-A-DGN-0066
46-TK-001 A
VN2154-101-A-DGN-0751

VN2154-101-A-DGN-0033
VN2154-101-A-DGN-0113
VN2154-101-A-DGN-0752
VN2154-101-A-DGN-0070
34-TK-010
VN2154-101-A-DGN-0601

'VN2154-101-A-DGN-0030
VN2154-101-A-DGN-0110
VN2154-101-A-DGN-0602

44-TK-001 A
VN2154-101-A-DGN-0701

'VN2154-101-A-DGN-0032
VN2154-101-A-DGN-0112
VN2154-101-A-DGN-0702
VN2154-101-A-DGN-0069
46-TK-001 B
VN2154-101-A-DGN-0751
0
VN2154-101-A-DGN-0033
VN2154-101-A-DGN-0113
VN2154-101-A-DGN-0752
VN2154-101-A-DGN-0070
44-TK-001 B
VN2154-101-A-DGN-0701
0
'VN2154-101-A-DGN-0032
VN2154-101-A-DGN-0112
VN2154-101-A-DGN-0702
VN2154-101-A-DGN-0069
49-TK-001 A
VN2154-101-A-DGN-0901

'VN2154-101-A-DGN-0036
VN2154-101-A-DGN-0116
VN2154-101-A-DGN-0902
VN2154-101-A-DGN-0073
49-TK-001 B
VN2154-101-A-DGN-0901
0
'VN2154-101-A-DGN-0036
VN2154-101-A-DGN-0116
VN2154-101-A-DGN-0902
VN2154-101-A-DGN-0073
06-TK-301
VN2154-101-A-DGN-0151

VN2154-101-A-DGN-0021
VN2154-101-A-DGN-0101
VN2154-101-A-DGN-0152

08-TK-001
VN2154-101-A-DGN-0301

VN2154-101-A-DGN-0024
VN2154-101-A-DGN-0104
VN2154-101-A-DGN-0302
'VN2154-101-A-DGN-0062
06-TK-302
VN2154-101-A-DGN-0201

VN2154-101-A-DGN-0022
VN2154-101-A-DGN-0102
VN2154-101-A-DGN-0202
Drawing Description

23.969%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
10.959%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
7.231%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
10.959%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.233%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.020%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
7.231%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.233%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
2.375%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
6.065%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.980%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.379%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
3.466%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.657%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.220%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
3.466%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.220%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
3.136%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
3.136%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.305%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.457%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.305%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
100.000%
Submission Approval
Submission Approval Plan Actual Plan
50% 50%
4.19% 4.19% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
2.10% 2.10% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
2.10% 2.10% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
1.80% 1.80% 31-Jan-22 Jan-2022 17-Feb-22 Feb-2022 24-Feb-22
1.80% 1.80% 31-Mar-22 Mar-2022 31-Jan-22 Jan-2022 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1.92% 1.92% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.96% 0.96% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.96% 0.96% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.82% 0.82% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.82% 0.82% 31-Mar-22 Mar-2022 11-Dec-21 Dec-2021 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1.27% 1.27% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.63% 0.63% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.63% 0.63% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.54% 0.54% 31-Jan-22 Jan-2022 17-Feb-22 Feb-2022 24-Feb-22
0.54% 0.54% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1.92% 1.92% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.96% 0.96% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.96% 0.96% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.82% 0.82% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.82% 0.82% 31-Mar-22 Mar-2022 11-Dec-21 Dec-2021 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.74% 0.74% 29-Oct-21 Oct-2021 29-Oct-21 Oct-2021 22-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.37% 0.37% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.37% 0.37% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.32% 0.32% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.32% 0.32% 31-Mar-22 Mar-2022 31-Jan-22 Jan-2022 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.70% 0.70% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.35% 0.35% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.35% 0.35% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.30% 0.30% 31-Jan-22 Jan-2022 17-Feb-22 Feb-2022 24-Feb-22
0.30% 0.30% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1.27% 1.27% 22-Oct-21 Oct-2021 27-Oct-21 Oct-2021 15-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.63% 0.63% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.63% 0.63% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.54% 0.54% 31-Jan-22 Jan-2022 17-Feb-22 Feb-2022 24-Feb-22
0.54% 0.54% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.74% 0.74% 29-Oct-21 Oct-2021 29-Oct-21 Oct-2021 22-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.37% 0.37% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.37% 0.37% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.32% 0.32% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.32% 0.32% 31-Mar-22 Mar-2022 31-Jan-22 Jan-2022 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.42% 0.42% 29-Oct-21 Oct-2021 29-Oct-21 Oct-2021 22-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.21% 0.21% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.21% 0.21% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.18% 0.18% 31-Mar-22 Mar-2022 05-Mar-22 Mar-2022 24-Apr-22
0.18% 0.18% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
1.06% 1.06% 29-Oct-21 Oct-2021 29-Oct-21 Oct-2021 22-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.53% 0.53% 15-Oct-21 Oct-2021 27-Oct-21 Oct-2021 8-Nov-21
0.53% 0.53% 15-Oct-21 Oct-2021 27-Oct-21 Oct-2021 8-Nov-21
0.45% 0.45% 31-Mar-22 Mar-2022 05-Mar-22 Mar-2022 24-Apr-22
0.45% 0.45% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.17% 0.17% 29-Oct-21 Oct-2021 29-Oct-21 Oct-2021 22-Nov-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.09% 0.09% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.09% 0.09% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.07% 0.07% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.07% 0.07% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.24% 0.24% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.12% 0.12% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.12% 0.12% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.10% 0.10% 31-Mar-22 Mar-2022 05-Mar-22 Mar-2022 24-Apr-22
0.10% 0.10% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.61% 0.61% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.30% 0.30% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.30% 0.30% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.26% 0.26% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.26% 0.26% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.11% 0.11% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.06% 0.06% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.06% 0.06% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.05% 0.05% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.05% 0.05% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.04% 0.04% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.02% 0.02% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.02% 0.02% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.02% 0.02% 31-Mar-22 Mar-2022 21-Mar-22 Mar-2022 24-Apr-22
0.02% 0.02% 18-Nov-21 Nov-2021 30-Dec-99 30-Dec-99 12-Dec-21
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.61% 0.61% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.30% 0.30% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.30% 0.30% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.26% 0.26% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.26% 0.26% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.04% 0.04% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.02% 0.02% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.02% 0.02% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.02% 0.02% 31-Mar-22 Mar-2022 21-Mar-22 Mar-2022 24-Apr-22
0.02% 0.02% 18-Nov-21 Nov-2021 30-Dec-99 30-Dec-99 12-Dec-21
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.55% 0.55% 10-Dec-21 Dec-2021 07-Dec-21 Dec-2021 3-Jan-22
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.27% 0.27% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.27% 0.27% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.24% 0.24% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
0.24% 0.24% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.55% 0.55% 10-Dec-21 Dec-2021 07-Dec-21 Dec-2021 3-Jan-22
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.27% 0.27% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.27% 0.27% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.24% 0.24% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
0.24% 0.24% 31-Mar-22 Mar-2022 30-Dec-99 30-Dec-99 24-Apr-22
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.05% 0.05% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.03% 0.03% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.03% 0.03% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.02% 0.02% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.02% 0.02% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.25% 0.25% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.13% 0.13% 15-Oct-21 Oct-2021 27-Oct-21 Oct-2021 8-Nov-21
0.13% 0.13% 15-Oct-21 Oct-2021 27-Oct-21 Oct-2021 8-Nov-21
0.11% 0.11% 31-Mar-22 Mar-2022 05-Mar-22 Mar-2022 24-Apr-22
0.11% 0.11% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.05% 0.05% 12-Nov-21 Nov-2021 13-Nov-21 Nov-2021 6-Dec-21
0.00% 0.00% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
0.03% 0.03% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.03% 0.03% 15-Oct-21 Oct-2021 15-Oct-21 Oct-2021 8-Nov-21
0.02% 0.02% 31-Mar-22 Mar-2022 14-Mar-22 Mar-2022 24-Apr-22
0.02% 0.02% 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
31-Mar-22 30-Dec-99
Approval Submission Approval
Actual Plan % Actual % Plan % Actual %

Nov-2021 30-Dec-99 30-Dec-99 4.195% 4.195% 4.19% 0.00%


30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 2.097% 2.097% 2.10% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 2.097% 2.097% 2.10% 0.00%
Feb-2022 30-Dec-99 30-Dec-99 1.798% 1.798% 1.80% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 1.798% 1.798% 1.80% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 1.918% 1.918% 1.92% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.959% 0.959% 0.96% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.959% 0.959% 0.96% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.822% 0.822% 0.82% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.822% 0.822% 0.82% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 1.265% 1.265% 1.27% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.633% 0.633% 0.63% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.633% 0.633% 0.63% 0.00%
Feb-2022 30-Dec-99 30-Dec-99 0.542% 0.542% 0.54% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.542% 0.000% 0.54% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 1.918% 1.918% 1.92% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.959% 0.959% 0.96% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.959% 0.959% 0.96% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.822% 0.822% 0.82% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.822% 0.822% 0.82% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.741% 0.741% 0.74% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.370% 0.370% 0.37% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.370% 0.370% 0.37% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.317% 0.317% 0.32% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.317% 0.317% 0.32% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.703% 0.703% 0.70% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.352% 0.352% 0.35% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.352% 0.352% 0.35% 0.00%
Feb-2022 30-Dec-99 30-Dec-99 0.301% 0.301% 0.30% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.301% 0.000% 0.30% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 1.265% 1.265% 1.27% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.633% 0.633% 0.63% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.633% 0.633% 0.63% 0.00%
Feb-2022 30-Dec-99 30-Dec-99 0.542% 0.542% 0.54% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.542% 0.000% 0.54% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.741% 0.741% 0.74% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.370% 0.370% 0.37% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.370% 0.370% 0.37% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.317% 0.317% 0.32% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.317% 0.317% 0.32% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.416% 0.416% 0.42% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.208% 0.208% 0.21% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.208% 0.208% 0.21% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.178% 0.178% 0.18% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.178% 0.000% 0.18% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 1.061% 1.061% 1.06% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.531% 0.531% 0.53% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.531% 0.531% 0.53% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.455% 0.455% 0.45% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.171% 0.171% 0.17% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.086% 0.086% 0.09% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.073% 0.073% 0.07% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.073% 0.000% 0.07% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.241% 0.241% 0.24% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.121% 0.121% 0.12% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.121% 0.121% 0.12% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.103% 0.103% 0.10% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.103% 0.000% 0.10% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.607% 0.607% 0.61% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.303% 0.303% 0.30% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.303% 0.303% 0.30% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.260% 0.260% 0.26% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.260% 0.000% 0.26% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.115% 0.115% 0.11% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.057% 0.057% 0.06% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.049% 0.049% 0.05% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.038% 0.038% 0.04% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.019% 0.019% 0.02% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.016% 0.016% 0.02% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.016% 0.000% 0.02% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.607% 0.607% 0.61% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.303% 0.303% 0.30% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.303% 0.303% 0.30% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.260% 0.260% 0.26% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.260% 0.000% 0.26% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.038% 0.038% 0.04% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.019% 0.019% 0.02% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.016% 0.016% 0.02% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.016% 0.000% 0.02% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Jan-2022 30-Dec-99 30-Dec-99 0.549% 0.549% 0.55% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.274% 0.274% 0.27% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.235% 0.000% 0.24% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.235% 0.000% 0.24% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Jan-2022 30-Dec-99 30-Dec-99 0.549% 0.549% 0.55% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.274% 0.274% 0.27% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.235% 0.000% 0.24% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.235% 0.000% 0.24% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.053% 0.053% 0.05% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.027% 0.027% 0.03% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.027% 0.027% 0.03% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.023% 0.023% 0.02% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.255% 0.255% 0.25% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.127% 0.127% 0.13% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.127% 0.127% 0.13% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.109% 0.109% 0.11% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Dec-2021 30-Dec-99 30-Dec-99 0.053% 0.053% 0.05% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.027% 0.027% 0.03% 0.00%
Nov-2021 30-Dec-99 30-Dec-99 0.027% 0.027% 0.03% 0.00%
Apr-2022 30-Dec-99 30-Dec-99 0.023% 0.023% 0.02% 0.00%
30-Dec-99 30-Dec-99 30-Dec-99 0.000% 0.000% 0.00% 0.00%
Engineerin TANK No DRW No

61-TK-001 A
VN2154-101-A-DGN-1251

VN2154-101-A-DGN-0042
VN2154-101-A-DGN-0122
VN2154-101-A-DGN-1252
VN2154-101-A-DGN-0079
60-TK-001 A
VN2154-101-A-DGN-1101

VN2154-101-A-DGN-0039
VN2154-101-A-DGN-0119
VN2154-101-A-DGN-1102
'VN2154-101-A-DGN-0076
62-TK-004 A
VN2154-101-A-DGN-1651

'VN2154-101-A-DGN-0049
VN2154-101-A-DGN-0129
VN2154-101-A-DGN-1652
VN2154-101-A-DGN-0086
61-TK-004 A
VN2154-101-A-DGN-1451

VN2154-101-A-DGN-0045
VN2154-101-A-DGN-0125
VN2154-101-A-DGN-1452
VN2154-101-A-DGN-0082
61-TK-001 B
VN2154-101-A-DGN-1251
0
VN2154-101-A-DGN-0042
VN2154-101-A-DGN-0122
VN2154-101-A-DGN-1252
VN2154-101-A-DGN-0079
62-TK-101 A
VN2154-101-A-DGN-1851

'VN2154-101-A-DGN-0052
VN2154-101-A-DGN-0132
VN2154-101-A-DGN-1852
VN2154-101-A-DGN-0089
60-TK-101 A
VN2154-101-A-DGN-1201

VN2154-101-A-DGN-0041
VN2154-101-A-DGN-0121
VN2154-101-A-DGN-1202
VN2154-101-A-DGN-0078
60-TK-001 B
VN2154-101-A-DGN-1101
0
VN2154-101-A-DGN-0039
VN2154-101-A-DGN-0119
VN2154-101-A-DGN-1102
'VN2154-101-A-DGN-0076
61-TK-004 B
VN2154-101-A-DGN-1451
0
VN2154-101-A-DGN-0045
VN2154-101-A-DGN-0125
VN2154-101-A-DGN-1452
VN2154-101-A-DGN-0082
62-TK-004 C
VN2154-101-A-DGN-1651

'VN2154-101-A-DGN-0053
VN2154-101-A-DGN-0133
VN2154-101-A-DGN-1652
VN2154-101-A-DGN-0086
62-TK-006 A
VN2154-101-A-DGN-1751

'VN2154-101-A-DGN-0050
VN2154-101-A-DGN-0130
VN2154-101-A-DGN-1752
VN2154-101-A-DGN-0087
62-TK-101 B
VN2154-101-A-DGN-1851
0
'VN2154-101-A-DGN-0052
VN2154-101-A-DGN-0132
VN2154-101-A-DGN-1852
VN2154-101-A-DGN-0089
60-TK-101 B
VN2154-101-A-DGN-1201
0
VN2154-101-A-DGN-0041
VN2154-101-A-DGN-0121
VN2154-101-A-DGN-1202
VN2154-101-A-DGN-0078
62-TK-006 B
VN2154-101-A-DGN-1751
0
'VN2154-101-A-DGN-0050
VN2154-101-A-DGN-0130
VN2154-101-A-DGN-1752
VN2154-101-A-DGN-0087
62-TK-001 A
VN2154-101-A-DGN-1501

VN2154-101-A-DGN-0046
VN2154-101-A-DGN-0126
VN2154-101-A-DGN-1502
VN2154-101-A-DGN-0083
61-TK-002
VN2154-101-A-DGN-1351

VN2154-101-A-DGN-0043
VN2154-101-A-DGN-0123
VN2154-101-A-DGN-1352
VN2154-101-A-DGN-0080
48-TK-001
VN2154-101-A-DGN-1051

VN2154-101-A-DGN-0038
VN2154-101-A-DGN-0118
VN2154-101-A-DGN-1052
'VN2154-101-A-DGN-0075
62-TK-008 A
VN2154-101-A-DGN-1801

'VN2154-101-A-DGN-0051
VN2154-101-A-DGN-0131
VN2154-101-A-DGN-1802
VN2154-101-A-DGN-0088
60-TK-002 A
VN2154-101-A-DGN-1151

VN2154-101-A-DGN-0040
VN2154-101-A-DGN-0120
VN2154-101-A-DGN-1152
VN2154-101-A-DGN-0077
62-TK-003 A
VN2154-101-A-DGN-1601

'VN2154-101-A-DGN-0048
VN2154-101-A-DGN-0128
VN2154-101-A-DGN-1602
VN2154-101-A-DGN-0085
62-TK-008 B
VN2154-101-A-DGN-1801
0
'VN2154-101-A-DGN-0051
VN2154-101-A-DGN-0131
VN2154-101-A-DGN-1802
VN2154-101-A-DGN-0088
60-TK-002 B
VN2154-101-A-DGN-1151
0
VN2154-101-A-DGN-0040
VN2154-101-A-DGN-0120
VN2154-101-A-DGN-1152
VN2154-101-A-DGN-0077
62-TK-001 B
VN2154-101-A-DGN-1501
0
VN2154-101-A-DGN-0046
VN2154-101-A-DGN-0126
VN2154-101-A-DGN-1502
VN2154-101-A-DGN-0083
62-TK-003 B
VN2154-101-A-DGN-1601
0
'VN2154-101-A-DGN-0048
VN2154-101-A-DGN-0128
VN2154-101-A-DGN-1602
VN2154-101-A-DGN-0085
61-TK-003
VN2154-101-A-DGN-1401

VN2154-101-A-DGN-0044
VN2154-101-A-DGN-0124
VN2154-101-A-DGN-1402
VN2154-101-A-DGN-0081
62-TK-002 B
VN2154-101-A-DGN-1551

'VN2154-101-A-DGN-0047
VN2154-101-A-DGN-0127
VN2154-101-A-DGN-1552
VN2154-101-A-DGN-0084
62-TK-002 A
VN2154-101-A-DGN-1551
0
'VN2154-101-A-DGN-0047
VN2154-101-A-DGN-0127
VN2154-101-A-DGN-1552
VN2154-101-A-DGN-0084
43-TK-001
VN2154-101-A-DGN-1001

VN2154-101-A-DGN-0037
VN2154-101-A-DGN-0117
VN2154-101-A-DGN-1002
'VN2154-101-A-DGN-0074
Drawing Description

5.260%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.739%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
2.258%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.510%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.260%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.039%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.703%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.739%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.510%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
2.258%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.346%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.039%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.703%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
4.346%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.430%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
11.907%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.416%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.007%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.120%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.945%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.007%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
5.120%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.430%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.945%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
8.867%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.803%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
1.803%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
0.489%
GA Drawing 35%
Strength Cal. & Foundation loading
Strength Calculation 18%
Foundation Load data 18%
Tank Orientation Drawing 15%
Mechanical & Structural Design Calculation 15%
100.000%
Submission Actual Plan %
Submission Approval Submission Approval Submission Approval Submission
50% 50%
0.92% 0.92% 22-Oct-21 15-Nov-21 0.921%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.46% 0.46% 15-Oct-21 8-Nov-21 0.460%
0.46% 0.46% 15-Oct-21 8-Nov-21 0.460%
0.39% 0.39% 31-Jan-22 24-Feb-22 0.395%
0.39% 0.39% 31-Dec-21 24-Jan-22 0.395%
30-Dec-99 23-Jan-00 0.000%
1.00% 1.00% 22-Oct-21 15-Nov-21 1.004%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.502%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.502%
0.43% 0.43% 31-Jan-22 24-Feb-22 0.430%
0.43% 0.43% 30-Dec-99 23-Jan-00 0.000%
30-Dec-99 23-Jan-00 0.000%
0.40% 0.40% 22-Oct-21 15-Nov-21 0.395%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.20% 0.20% 30-Dec-99 23-Jan-00 0.000%
0.20% 0.20% 15-Oct-21 8-Nov-21 0.198%
0.17% 0.17% 31-Jan-22 24-Feb-22 0.169%
0.17% 0.17% 31-Dec-21 24-Jan-22 0.169%
30-Dec-99 23-Jan-00 0.000%
0.79% 0.79% 22-Oct-21 15-Nov-21 0.789%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.39% 0.39% 15-Oct-21 8-Nov-21 0.395%
0.39% 0.39% 15-Oct-21 8-Nov-21 0.395%
0.34% 0.34% 31-Jan-22 24-Feb-22 0.338%
0.34% 0.34% 31-Mar-22 24-Apr-22 0.338%
30-Dec-99 23-Jan-00 0.000%
0.92% 0.92% 22-Oct-21 15-Nov-21 0.921%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.46% 0.46% 15-Oct-21 8-Nov-21 0.460%
0.46% 0.46% 15-Oct-21 8-Nov-21 0.460%
0.39% 0.39% 31-Jan-22 24-Feb-22 0.395%
0.39% 0.39% 31-Dec-21 24-Jan-22 0.395%
30-Dec-99 23-Jan-00 0.000%
0.18% 0.18% 29-Oct-21 22-Nov-21 0.182%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 15-Oct-21 8-Nov-21 0.091%
0.08% 0.08% 31-Jan-22 24-Feb-22 0.078%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.078%
30-Dec-99 23-Jan-00 0.000%
1.00% 1.00% 29-Oct-21 22-Nov-21 0.998%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.499%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.499%
0.43% 0.43% 31-Jan-22 24-Feb-22 0.428%
0.43% 0.43% 31-Mar-22 24-Apr-22 0.428%
30-Dec-99 23-Jan-00 0.000%
1.00% 1.00% 22-Oct-21 15-Nov-21 1.004%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.502%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.502%
0.43% 0.43% 31-Jan-22 24-Feb-22 0.430%
0.43% 0.43% 30-Dec-99 23-Jan-00 0.000%
30-Dec-99 23-Jan-00 0.000%
0.79% 0.79% 22-Oct-21 15-Nov-21 0.789%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.39% 0.39% 15-Oct-21 8-Nov-21 0.395%
0.39% 0.39% 15-Oct-21 8-Nov-21 0.395%
0.34% 0.34% 31-Jan-22 24-Feb-22 0.338%
0.34% 0.34% 31-Mar-22 24-Apr-22 0.338%
30-Dec-99 23-Jan-00 0.000%
0.40% 0.40% 22-Oct-21 15-Nov-21 0.395%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.20% 0.20% 30-Dec-99 23-Jan-00 0.000%
0.20% 0.20% 15-Oct-21 8-Nov-21 0.198%
0.17% 0.17% 31-Jan-22 24-Feb-22 0.169%
0.17% 0.17% 31-Dec-21 24-Jan-22 0.169%
30-Dec-99 23-Jan-00 0.000%
0.76% 0.76% 12-Nov-21 6-Dec-21 0.761%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.38% 0.38% 30-Dec-99 23-Jan-00 0.000%
0.38% 0.38% 15-Oct-21 8-Nov-21 0.380%
0.33% 0.33% 31-Mar-22 24-Apr-22 0.326%
0.33% 0.33% 31-Mar-22 24-Apr-22 0.326%
30-Dec-99 23-Jan-00 0.000%
0.18% 0.18% 29-Oct-21 22-Nov-21 0.182%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 15-Oct-21 8-Nov-21 0.091%
0.08% 0.08% 31-Jan-22 24-Feb-22 0.078%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.078%
30-Dec-99 23-Jan-00 0.000%
1.00% 1.00% 29-Oct-21 22-Nov-21 0.998%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.499%
0.50% 0.50% 15-Oct-21 8-Nov-21 0.499%
0.43% 0.43% 31-Jan-22 24-Feb-22 0.428%
0.43% 0.43% 31-Mar-22 24-Apr-22 0.428%
30-Dec-99 23-Jan-00 0.000%
0.76% 0.76% 12-Nov-21 6-Dec-21 0.761%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.38% 0.38% 30-Dec-99 23-Jan-00 0.000%
0.38% 0.38% 15-Oct-21 8-Nov-21 0.380%
0.33% 0.33% 31-Mar-22 24-Apr-22 0.326%
0.33% 0.33% 31-Mar-22 24-Apr-22 0.326%
30-Dec-99 23-Jan-00 0.000%
0.25% 0.25% 12-Nov-21 6-Dec-21 0.250%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.13% 0.13% 15-Oct-21 8-Nov-21 0.125%
0.13% 0.13% 15-Oct-21 8-Nov-21 0.125%
0.11% 0.11% 31-Mar-22 24-Apr-22 0.107%
0.11% 0.11% 31-Mar-22 24-Apr-22 0.107%
30-Dec-99 23-Jan-00 0.000%
2.08% 2.08% 29-Oct-21 22-Nov-21 2.084%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
1.04% 1.04% 15-Oct-21 8-Nov-21 1.042%
1.04% 1.04% 15-Oct-21 8-Nov-21 1.042%
0.89% 0.89% 31-Jan-22 24-Feb-22 0.893%
0.89% 0.89% 31-Mar-22 24-Apr-22 0.893%
30-Dec-99 23-Jan-00 0.000%
0.07% 0.07% 12-Nov-21 6-Dec-21 0.073%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.04% 0.04% 15-Oct-21 8-Nov-21 0.036%
0.04% 0.04% 15-Oct-21 8-Nov-21 0.036%
0.03% 0.03% 31-Mar-22 24-Apr-22 0.031%
0.03% 0.03% 30-Dec-99 23-Jan-00 0.000%
30-Dec-99 23-Jan-00 0.000%
0.18% 0.18% 12-Nov-21 6-Dec-21 0.176%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 15-Oct-21 8-Nov-21 0.088%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.075%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.075%
30-Dec-99 23-Jan-00 0.000%
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99 23-Jan-00 0.000%
0.17% 0.17% 12-Nov-21 6-Dec-21 0.165%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.08% 0.08% 30-Dec-99 23-Jan-00 0.000%
0.08% 0.08% 15-Oct-21 8-Nov-21 0.083%
0.07% 0.07% 31-Mar-22 24-Apr-22 0.071%
0.07% 0.07% 31-Mar-22 24-Apr-22 0.071%
30-Dec-99 23-Jan-00 0.000%
0.18% 0.18% 12-Nov-21 6-Dec-21 0.176%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 30-Dec-99 23-Jan-00 0.000%
0.09% 0.09% 15-Oct-21 8-Nov-21 0.088%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.075%
0.08% 0.08% 31-Mar-22 24-Apr-22 0.075%
30-Dec-99 23-Jan-00 0.000%
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
30-Dec-99
0.90% 0.90% 12-Nov-21 6-Dec-21 0.896%
0.00% 0.00% 30-Dec-99 23-Jan-00 0.000%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.45% 0.45% 15-Oct-21 8-Nov-21 0.448%
0.38% 0.38% 31-Mar-22 24-Apr-22 0.384%
0.38% 0.38% 30-Dec-99 23-Jan-00 0.000%
Plan % Actual %
Approval Submission Approval

0.921% 0% 0%
0.000% 0% 0%
0.460% 0% 0%
0.460% 0% 0%
0.395% 0% 0%
0.395% 0% 0%
0.000% 0% 0%
1.004% 0% 0%
0.000% 0% 0%
0.502% 0% 0%
0.502% 0% 0%
0.430% 0% 0%
0.430% 0% 0%
0.000% 0% 0%
0.395% 0% 0%
0.000% 0% 0%
0.198% 0% 0%
0.198% 0% 0%
0.169% 0% 0%
0.169% 0% 0%
0.000% 0% 0%
0.789% 0% 0%
0.000% 0% 0%
0.395% 0% 0%
0.395% 0% 0%
0.338% 0% 0%
0.338% 0% 0%
0.000% 0% 0%
0.921% 0% 0%
0.000% 0% 0%
0.460% 0% 0%
0.460% 0% 0%
0.395% 0% 0%
0.395% 0% 0%
0.000% 0% 0%
0.182% 0% 0%
0.000% 0% 0%
0.091% 0% 0%
0.091% 0% 0%
0.078% 0% 0%
0.078% 0% 0%
0.000% 0% 0%
0.998% 0% 0%
0.000% 0% 0%
0.499% 0% 0%
0.499% 0% 0%
0.428% 0% 0%
0.428% 0% 0%
0.000% 0% 0%
1.004% 0% 0%
0.000% 0% 0%
0.502% 0% 0%
0.502% 0% 0%
0.430% 0% 0%
0.430% 0% 0%
0.000% 0% 0%
0.789% 0% 0%
0.000% 0% 0%
0.395% 0% 0%
0.395% 0% 0%
0.338% 0% 0%
0.338% 0% 0%
0.000% 0% 0%
0.395% 0% 0%
0.000% 0% 0%
0.198% 0% 0%
0.198% 0% 0%
0.169% 0% 0%
0.169% 0% 0%
0.000% 0% 0%
0.761% 0% 0%
0.000% 0% 0%
0.380% 0% 0%
0.380% 0% 0%
0.326% 0% 0%
0.326% 0% 0%
0.000% 0% 0%
0.182% 0% 0%
0.000% 0% 0%
0.091% 0% 0%
0.091% 0% 0%
0.078% 0% 0%
0.078% 0% 0%
0.000% 0% 0%
0.998% 0% 0%
0.000% 0% 0%
0.499% 0% 0%
0.499% 0% 0%
0.428% 0% 0%
0.428% 0% 0%
0.000% 0% 0%
0.761% 0% 0%
0.000% 0% 0%
0.380% 0% 0%
0.380% 0% 0%
0.326% 0% 0%
0.326% 0% 0%
0.000% 0% 0%
0.250% 0% 0%
0.000% 0% 0%
0.125% 0% 0%
0.125% 0% 0%
0.107% 0% 0%
0.107% 0% 0%
0.000% 0% 0%
2.084% 0% 0%
0.000% 0% 0%
1.042% 0% 0%
1.042% 0% 0%
0.893% 0% 0%
0.893% 0% 0%
0.000% 0% 0%
0.073% 0% 0%
0.000% 0% 0%
0.036% 0% 0%
0.036% 0% 0%
0.031% 0% 0%
0.031% 0% 0%
0.000% 0% 0%
0.176% 0% 0%
0.000% 0% 0%
0.088% 0% 0%
0.088% 0% 0%
0.075% 0% 0%
0.075% 0% 0%
0.000% 0% 0%
0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%
0.000% 0% 0%
0.165% 0% 0%
0.000% 0% 0%
0.083% 0% 0%
0.083% 0% 0%
0.071% 0% 0%
0.071% 0% 0%
0.000% 0% 0%
0.176% 0% 0%
0.000% 0% 0%
0.088% 0% 0%
0.088% 0% 0%
0.075% 0% 0%
0.075% 0% 0%
0.000% 0% 0%
0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%

0.896% 0% 0%
0.000% 0% 0%
0.448% 0% 0%
0.448% 0% 0%
0.384% 0% 0%
0.384% 0% 0%
May-22
Mar-22
Nov-21

Dec-21
Sep-21

Feb-22

Apr-22
Oct-21

Jan-22
Month % - Plan 0.0% 32.8% 2.0% 1.1% 3.2% 0.0% 9.5% 0.0% 0.0%
Cum. Month Plan 0.0% 32.8% 34.8% 35.9% 39.1% 39.1% 48.6% 48.6% 48.6%
Submission

Month % - Forecast
Cum. Month Forecast
Month % - Actual 0.0% 32.8% 2.0% 2.7% 2.4% 3.2% 2.2% 0.0% 0.0%
Cum. Month Actual 0.0% 32.8% 34.8% 37.6% 40.0% 43.2% 45.4% 45.4% 45.4%

Month % - Plan 0.0% 0.0% 32.8% 2.0% 1.1% 3.2% 0.0% 9.5% 0.0%
AST-I

Cum. Month Plan 0.0% 0.0% 32.8% 34.8% 35.9% 39.1% 39.1% 48.6% 48.6%
Month % - Forecast
Approval

Cum. Month Forecast


Month % - Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Cum. Month Actual 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

Month % - Plan 0.0% 32.8% 34.8% 3.1% 4.3% 3.2% 9.5% 9.5% 0.0%
Cum. Month Plan 0.0% 32.8% 67.7% 70.8% 75.1% 78.3% 87.7% 97.2% 97.2%
Month % - Forecast
Total Eng

Cum. Month Forecast


Month % - Actual 0.0% 32.8% 2.0% 2.7% 2.4% 3.2% 2.2% 0.0% 0.0%
Cum. Month Actual 0.0% 32.8% 34.8% 37.6% 40.0% 43.2% 45.4% 45.4% 45.4%
May-23
Mar-23
Nov-22
Aug-22

Dec-22
Sep-22

Feb-23

Apr-23
Oct-22
Jun-22

Jun-23
Jan-23
Jul-22

Jul-23
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4%
May-24
Mar-24
Nov-23
Aug-23

Aug-24
Dec-23
Sep-23

Feb-24

Feb-24

Apr-24
Oct-23

Jun-24
Jan-24

Jul-24
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6% 48.6%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2% 97.2%

0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4% 45.4%
Sep-24

Oct-24

0.0% 0.0%
48.6% 48.6%

0.0% 0.0%
45.4% 45.4%

0.0% 0.0%
48.6% 48.6%

0.0% 0.0%
0.0% 0.0%

0.0% 0.0%
97.2% 97.2%

0.0% 0.0%
45.4% 45.4%
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
VN2154-101-A-ZZZ-9999
Project Document No.
Contractor Native
Vendor
Change Status/ Title Issue JGC or HDEC Equipment Item AWP 1st Submit Date File/s Reason Native Files not Remarks Remarks
Issue Vendor Doc. No.
Remarks PO No (350 Max) Purpose to Common No. (Y/N) Forecast Available being available
Category Purpose
(without "P" Type Code Seq No Full Document No Employer (Y/N)
("V")
X215XX-XXX-X)

V N2154-101-A ZZZ 9999 VN2154-101-A-ZZZ-9999 VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS_RN2154-101 IFR IFA COMMON COMMON N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0001 VN2154-101-A-DGN-0001 VENTING CALCULATION FOR NORMAL OPEN VENT (AST-I) IFI IFA HDEC COMMON N 29-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0002 VN2154-101-A-DGN-0002 VENTING CALCULATION FOR EMERGENCY RELIEF (AST-I) IFI IFA HDEC COMMON N 29-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0003 VN2154-101-A-DGN-0003 VENTING CALCULATION FOR PRESSURE / VACUUM RELIEF VENT (AST-I) IFI IFA HDEC COMMON N 29-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0004 VN2154-101-A-DGN-0004 CALCULATION FOR STEAM HEATING COIL SIZE (AST-I)__RN2154-101 IFI IFA HDEC COMMON N 16-Nov-21 Y
Change V N2154-101-A DGN 0005 VN2154-101-A-DGN-0005 CALCULATION FOR JET MIXER (08-TK-001) LEAN AMINE TANK (AST-I) IFI IFA HDEC 08-TK-0001 N 31-Mar-22 Y
V N2154-101-A PRO 0001 VN2154-101-A-PRO-0001 BILL OF MATERIAL FOR STEEL PLATES (AST-I) IFR IFR HDEC COMMON N 07-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0021 VN2154-101-A-DGN-0021 STRENGTH CALCULATION FOR SOLVENT STORAGE TANK ( 06-TK-301 ) IFI IFA HDEC 06-TK-301 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0022 VN2154-101-A-DGN-0022 STRENGTH CALCULATION FOR WASH WATER TANK ( 06-TK-302 ) IFI IFA HDEC 06-TK-302 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0023 VN2154-101-A-DGN-0023 STRENGTH CALCULATION FOR SOUR WATER STORAGE TANK ( 07-TK-001 ) IFI IFA HDEC 07-TK-001 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0024 VN2154-101-A-DGN-0024 STRENGTH CALCULATION FOR LEAN AMINE TANK ( 08-TK-001 ) IFI IFA HDEC 08-TK-001 N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0025 VN2154-101-A-DGN-0025 STRENGTH CALCULATION FOR RAW WATER TANKS ( 31-TK-001 A/B ) IFI IFA HDEC 31-TK-001 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0026 VN2154-101-A-DGN-0026 STRENGTH CALCULATION FOR FILTERED RAW WATER TANK ( 31-TK-002 ) IFI IFA HDEC 31-TK-002 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0027 VN2154-101-A-DGN-0027 STRENGTH CALCULATION FOR DESALINATED WATER TANK ( 31-TK-003 ) IFI IFA HDEC 31-TK-003 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0028 VN2154-101-A-DGN-0028 STRENGTH CALCULATION FOR FILTERED RAW WATER AUXILIARY TANK ( 31-TK-004 ) IFI IFA HDEC 31-TK-004 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0029 VN2154-101-A-DGN-0029 STRENGTH CALCULATION FOR DEMINERALIZED WATER TANK ( 33-TK-001 ) IFI IFA HDEC 33-TK-001 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0030 VN2154-101-A-DGN-0030 STRENGTH CALCULATION FOR SUSPECT CONDENSATE TANK ( 34-TK-010 ) IFI IFA HDEC 34-TK-010 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0031 VN2154-101-A-DGN-0031 STRENGTH CALCULATION FOR POTABLE WATER TANK ( 35-TK-001 ) IFI IFA HDEC 35-TK-001 N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0032 VN2154-101-A-DGN-0032 STRENGTH CALCULATION FOR 20% SODA SOLUTION TANKS ( 44-TK-001 A/B ) IFI IFA HDEC 44-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0033 VN2154-101-A-DGN-0033 STRENGTH CALCULATION FOR OILY WATER STORAGE TANKS ( 46-TK-001 A/B ) IFI IFA HDEC 46-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0034 VN2154-101-A-DGN-0034 STRENGTH CALCULATION FOR EQUALIZATION TANKS ( 46-TK-002 A/B ) IFI IFA HDEC 46-TK-002 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0035 VN2154-101-A-DGN-0035 STRENGTH CALCULATION FOR FIRE WATER / SERVICE WATER TANKS ( 47-TK-001 A/B ) IFI IFA HDEC 47-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0036 VN2154-101-A-DGN-0036 STRENGTH CALCULATION FOR SULPHUR TANKS ( 49-TK-001 A/B ) IFI IFA HDEC 49-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0061 VN2154-101-A-DGN-0061 ROOF STRUCTURE CALCULATION FOR SOUR WATER STORAGE TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 N 31-Mar-22 Y
Delete V N2154-101-A DGN 0062 VN2154-101-A-DGN-0062 ROOF STRUCTURE CALCULATION FOR LEAN AMINE TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 N 18-Nov-21 Y NO ROOF STRUCTURE
Change V N2154-101-A DGN 0063 VN2154-101-A-DGN-0063 ROOF STRUCTURE CALCULATION FOR RAW WATER TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B N 31-Mar-22 Y
Change V N2154-101-A DGN 0064 VN2154-101-A-DGN-0064 ROOF STRUCTURE CALCULATION FOR FILTERED RAW WATER TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 N 31-Mar-22 Y
Change V N2154-101-A DGN 0065 VN2154-101-A-DGN-0065 ROOF STRUCTURE CALCULATION FOR DESALINATED WATER TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 N 31-Mar-22 Y
Change V N2154-101-A DGN 0066 VN2154-101-A-DGN-0066 ROOF STRUCTURE CALCULATION FOR FILTERED RAW WATER AUXILIARY TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 N 31-Mar-22 Y
Change V N2154-101-A DGN 0067 VN2154-101-A-DGN-0067 ROOF STRUCTURE CALCULATION FOR DEMINERALIZED WATER TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 N 31-Mar-22 Y
Change V N2154-101-A DGN 0068 VN2154-101-A-DGN-0068 ROOF STRUCTURE CALCULATION FOR POTABLE WATER TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 N 31-Mar-22 Y
Delete V N2154-101-A DGN 0069 VN2154-101-A-DGN-0069 ROOF STRUCTURE CALCULATION FOR 20% SODA SOLUTION TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B N 18-Nov-21 Y NO ROOF STRUCTURE
Change V N2154-101-A DGN 0070 VN2154-101-A-DGN-0070 ROOF STRUCTURE CALCULATION FOR OILY WATER STORAGE TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B N 31-Mar-22 Y
Change V N2154-101-A DGN 0071 VN2154-101-A-DGN-0071 ROOF STRUCTURE CALCULATION FOR EQUALIZATION TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B N 31-Mar-22 Y
Change V N2154-101-A DGN 0072 VN2154-101-A-DGN-0072 ROOF STRUCTURE CALCULATION FOR FIRE WATER / SERVICE WATER TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B N 31-Mar-22 Y
Change V N2154-101-A DGN 0073 VN2154-101-A-DGN-0073 ROOF STRUCTURE CALCULATION FOR SULPHUR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B N 31-Mar-22 Y
V N2154-101-A DGN 0101 VN2154-101-A-DGN-0101 FOUNDATION LOAD DATA FOR SOLVENT STORAGE TANK ( 06-TK-301 ) IFI IFA HDEC 06-TK-301 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0102 VN2154-101-A-DGN-0102 FOUNDATION LOAD DATA FOR WASH WATER TANK ( 06-TK-302 ) IFI IFA HDEC 06-TK-302 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0103 VN2154-101-A-DGN-0103 FOUNDATION LOAD DATA FOR SOUR WATER STORAGE TANK ( 07-TK-001 ) IFI IFA HDEC 07-TK-001 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0104 VN2154-101-A-DGN-0104 FOUNDATION LOAD DATA FOR LEAN AMINE TANK ( 08-TK-001 ) IFI IFA HDEC 08-TK-001 N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0105 VN2154-101-A-DGN-0105 FOUNDATION LOAD DATA FOR RAW WATER TANKS ( 31-TK-001 A/B ) IFI IFA HDEC 31-TK-001 A/B N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0106 VN2154-101-A-DGN-0106 FOUNDATION LOAD DATA FOR FILTERED RAW WATER TANK ( 31-TK-002 ) IFI IFA HDEC 31-TK-002 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0107 VN2154-101-A-DGN-0107 FOUNDATION LOAD DATA FOR DESALINATED WATER TANK ( 31-TK-003 ) IFI IFA HDEC 31-TK-003 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0108 VN2154-101-A-DGN-0108 FOUNDATION LOAD DATA FOR FILTERED RAW WATER AUXILIARY TANK ( 31-TK-004 ) IFI IFA HDEC 31-TK-004 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0109 VN2154-101-A-DGN-0109 FOUNDATION LOAD DATA FOR DEMINERALIZED WATER TANK ( 33-TK-001 ) IFI IFA HDEC 33-TK-001 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0110 VN2154-101-A-DGN-0110 FOUNDATION LOAD DATA FOR SUSPECT CONDENSATE TANK ( 34-TK-010 ) IFI IFA HDEC 34-TK-010 N 15-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0111 VN2154-101-A-DGN-0111 FOUNDATION LOAD DATA FOR POTABLE WATER TANK ( 35-TK-001 ) IFI IFA HDEC 35-TK-001 N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0112 VN2154-101-A-DGN-0112 FOUNDATION LOAD DATA FOR 20% SODA SOLUTION TANKS ( 44-TK-001 A/B ) IFI IFA HDEC 44-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0113 VN2154-101-A-DGN-0113 FOUNDATION LOAD DATA FOR OILY WATER STORAGE TANKS ( 46-TK-001 A/B ) IFI IFA HDEC 46-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0114 VN2154-101-A-DGN-0114 FOUNDATION LOAD DATA FOR EQUALIZATION TANKS ( 46-TK-002 A/B ) IFI IFA HDEC 46-TK-002 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0115 VN2154-101-A-DGN-0115 FOUNDATION LOAD DATA FOR FIRE WATER / SERVICE WATER TANKS ( 47-TK-001 A/B ) IFI IFA HDEC 47-TK-001 A/B N 15-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0116 VN2154-101-A-DGN-0116 FOUNDATION LOAD DATA FOR SULPHUR TANKS ( 49-TK-001 A/B ) IFI IFA HDEC 49-TK-001 A/B N 15-Oct-21 Y SUBMITTED

V N2154-101-A DGN 0151 VN2154-101-A-DGN-0151 GENERAL ARRANGEMENT DRAWING FOR SOLVENT STORAGE TANK ( 06-TK-301 ) IFR IFA HDEC 06-TK-301 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0152 VN2154-101-A-DGN-0152 NOZZLE ORIENTATION DETAILS FOR TANK ( 06-TK-301 ) IFR IFA HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0153 VN2154-101-A-DGN-0153 SHELL, BOTTOM & ROOF PLATE LAYOUT FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0154 VN2154-101-A-DGN-0154 DETAIL OF SHELL NOZZLE FOR TANK ( 06-TK-301 ) SHT 01 OF 02 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0155 VN2154-101-A-DGN-0155 DETAIL OF SHELL NOZZLE FOR TANK ( 06-TK-301 ) SHT 02 OF 02 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
V N2154-101-A DGN 0156 VN2154-101-A-DGN-0156 DETAIL OF DRAW-OFF SUMP FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0157 VN2154-101-A-DGN-0157 DETAIL OF SHELL MANWAY FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0158 VN2154-101-A-DGN-0158 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-301 ) SHT 01 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0159 VN2154-101-A-DGN-0159 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-301 ) SHT 02 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0160 VN2154-101-A-DGN-0160 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-301 ) SHT 03 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0161 VN2154-101-A-DGN-0161 DETAIL OF ROOF MANWAY FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0162 VN2154-101-A-DGN-0162 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-301 ) SHT 01 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0163 VN2154-101-A-DGN-0163 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-301 ) SHT 02 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0164 VN2154-101-A-DGN-0164 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-301 ) SHT 03 OF 03 IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0165 VN2154-101-A-DGN-0165 DETAIL OF ROOF HANDRAIL FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
V N2154-101-A DGN 0166 VN2154-101-A-DGN-0166 DETAIL OF NAME PLATE FOR TANK ( 06-TK-301 ) IFR IFR HDEC 06-TK-301 Y 31-Mar-22 Y
V N2154-101-A DGN 0167 VN2154-101-A-DGN-0167 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 06-TK-301 ) IFI IFR HDEC 06-TK-301 Y 31-Mar-22 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 0201 VN2154-101-A-DGN-0201 GENERAL ARRANGEMENT DRAWING FOR WASH WATER TANK ( 06-TK-302 ) IFR IFA HDEC 06-TK-302 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0202 VN2154-101-A-DGN-0202 NOZZLE ORIENTATION DETAILS FOR TANK ( 06-TK-302 ) IFR IFA HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0203 VN2154-101-A-DGN-0203 SHELL, BOTTOM & ROOF PLATE LAYOUT FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0204 VN2154-101-A-DGN-0204 DETAIL OF SHELL NOZZLE FOR TANK ( 06-TK-302 ) SHT 01 OF 02 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0205 VN2154-101-A-DGN-0205 DETAIL OF SHELL NOZZLE FOR TANK ( 06-TK-302 ) SHT 02 OF 02 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
V N2154-101-A DGN 0206 VN2154-101-A-DGN-0206 DETAIL OF DRAW-OFF SUMP FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0207 VN2154-101-A-DGN-0207 DETAIL OF SHELL MANWAY FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0208 VN2154-101-A-DGN-0208 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-302 ) SHT 01 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0209 VN2154-101-A-DGN-0209 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-302 ) SHT 02 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0210 VN2154-101-A-DGN-0210 DETAIL OF ROOF NOZZLE FOR TANK ( 06-TK-302 ) SHT 03 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0211 VN2154-101-A-DGN-0211 DETAIL OF ROOF MANWAY FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0212 VN2154-101-A-DGN-0212 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-302 ) SHT 01 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0213 VN2154-101-A-DGN-0213 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-302 ) SHT 02 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0214 VN2154-101-A-DGN-0214 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 06-TK-302 ) SHT 03 OF 03 IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0215 VN2154-101-A-DGN-0215 DETAIL OF ROOF HANDRAIL FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y
V N2154-101-A DGN 0216 VN2154-101-A-DGN-0216 DETAIL OF NAME PLATE FOR TANK ( 06-TK-302 ) IFR IFR HDEC 06-TK-302 Y 31-Mar-22 Y
V N2154-101-A DGN 0217 VN2154-101-A-DGN-0217 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 06-TK-302 ) IFI IFR HDEC 06-TK-302 Y 31-Mar-22 Y

V N2154-101-A DGN 0251 VN2154-101-A-DGN-0251 GENERAL ARRANGEMENT DRAWING FOR SOUR WATER STORAGE TANK ( 07-TK-001 ) IFR IFA HDEC 07-TK-001 Y 29-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0252 VN2154-101-A-DGN-0252 NOZZLE ORIENTATION DETAILS FOR TANK ( 07-TK-001 ) IFR IFA HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0253 VN2154-101-A-DGN-0253 SHELL PLATE LAYOUT FOR TANK ( 07-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0254 VN2154-101-A-DGN-0254 SHELL PLATE LAYOUT FOR TANK ( 07-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0255 VN2154-101-A-DGN-0255 BOTTOM PLATE LAYOUT FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0256 VN2154-101-A-DGN-0256 ROOF PLATE LAYOUT FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0257 VN2154-101-A-DGN-0257 DETAIL OF SHELL NOZZLE FOR TANK ( 07-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0258 VN2154-101-A-DGN-0258 DETAIL OF SHELL NOZZLE FOR TANK ( 07-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0259 VN2154-101-A-DGN-0259 DETAIL OF DRAW-OFF SUMP FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0260 VN2154-101-A-DGN-0260 DETAIL OF SHELL MANWAY (24") FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0261 VN2154-101-A-DGN-0261 DETAIL OF ROOF NOZZLE FOR TANK ( 07-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0262 VN2154-101-A-DGN-0262 DETAIL OF ROOF NOZZLE FOR TANK ( 07-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0263 VN2154-101-A-DGN-0263 DETAIL OF ROOF NOZZLE FOR TANK ( 07-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0264 VN2154-101-A-DGN-0264 DETAIL OF ROOF MANWAY FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0265 VN2154-101-A-DGN-0265 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 07-TK-001 ) SHT 01 OF 05 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0266 VN2154-101-A-DGN-0266 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 07-TK-001 ) SHT 02 OF 05 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0267 VN2154-101-A-DGN-0267 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 07-TK-001 ) SHT 03 OF 05 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0268 VN2154-101-A-DGN-0268 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 07-TK-001 ) SHT 04 OF 05 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0269 VN2154-101-A-DGN-0269 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 07-TK-001 ) SHT 05 OF 05 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0270 VN2154-101-A-DGN-0270 DETAILS OF TOP PLATFORM FOR TANK ( 07-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0271 VN2154-101-A-DGN-0271 DETAILS OF TOP PLATFORM FOR TANK ( 07-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0272 VN2154-101-A-DGN-0272 DETAILS OF TOP PLATFORM FOR TANK ( 07-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0273 VN2154-101-A-DGN-0273 DETAIL OF ROOF HANDRAIL FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0274 VN2154-101-A-DGN-0274 DETAIL OF CAGE LADDER FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0275 VN2154-101-A-DGN-0275 DETAIL OF ROOF STRUCTURE FOR TANK ( 07-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0276 VN2154-101-A-DGN-0276 DETAIL OF ROOF STRUCTURE FOR TANK ( 07-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0277 VN2154-101-A-DGN-0277 DETAIL OF NAME PLATE FOR TANK ( 07-TK-001 ) IFR IFR HDEC 07-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0278 VN2154-101-A-DGN-0278 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0279 VN2154-101-A-DGN-0279 DETAIL OF SHELL MANWAY (30") FOR TANK ( 07-TK-001 ) IFI IFR HDEC 07-TK-001 Y 31-Dec-21 Y

V N2154-101-A DGN 0301 VN2154-101-A-DGN-0301 GENERAL ARRANGEMENT DRAWING FOR LEAN AMINE TANK ( 08-TK-001 ) IFR IFA HDEC 08-TK-001 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0302 VN2154-101-A-DGN-0302 NOZZLE ORIENTATION DETAILS FOR TANK ( 08-TK-001 ) IFR IFA HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0303 VN2154-101-A-DGN-0303 SHELL PLATE LAYOUT FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0304 VN2154-101-A-DGN-0304 BOTTOM PLATE LAYOUT FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0305 VN2154-101-A-DGN-0305 ROOF PLATE LAYOUT FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0306 VN2154-101-A-DGN-0306 DETAIL OF SHELL NOZZLE FOR TANK ( 08-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0307 VN2154-101-A-DGN-0307 DETAIL OF SHELL NOZZLE FOR TANK ( 08-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0308 VN2154-101-A-DGN-0308 DETAIL OF DRAW-OFF SUMP FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0309 VN2154-101-A-DGN-0309 DETAIL OF SHELL MANWAY (24") FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0310 VN2154-101-A-DGN-0310 DETAIL OF ROOF NOZZLE FOR TANK ( 08-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0311 VN2154-101-A-DGN-0311 DETAIL OF ROOF NOZZLE FOR TANK ( 08-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0312 VN2154-101-A-DGN-0312 DETAIL OF ROOF NOZZLE FOR TANK ( 08-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0313 VN2154-101-A-DGN-0313 DETAIL OF ROOF MANWAY FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0314 VN2154-101-A-DGN-0314 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 08-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0315 VN2154-101-A-DGN-0315 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 08-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0316 VN2154-101-A-DGN-0316 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 08-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0317 VN2154-101-A-DGN-0317 DETAILS OF TOP PLATFORM FOR TANK ( 08-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0318 VN2154-101-A-DGN-0318 DETAILS OF TOP PLATFORM FOR TANK ( 08-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0319 VN2154-101-A-DGN-0319 DETAIL OF ROOF HANDRAIL FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Delete V N2154-101-A DGN 0320 VN2154-101-A-DGN-0320 DETAIL OF ROOF STRUCTURE FOR TANK ( 08-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 08-TK-001 Y 19-Nov-21 Y NO ROOF STRUCTURE
Delete V N2154-101-A DGN 0321 VN2154-101-A-DGN-0321 DETAIL OF ROOF STRUCTURE FOR TANK ( 08-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 08-TK-001 Y 19-Nov-21 Y NO ROOF STRUCTURE
V N2154-101-A DGN 0322 VN2154-101-A-DGN-0322 DETAIL OF NAME PLATE FOR TANK ( 08-TK-001 ) IFR IFR HDEC 08-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0323 VN2154-101-A-DGN-0323 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0324 VN2154-101-A-DGN-0324 DETAIL OF SHELL MANWAY (30") FOR TANK ( 08-TK-001 ) IFI IFR HDEC 08-TK-001 Y 31-Mar-22 Y

V N2154-101-A DGN 0351 VN2154-101-A-DGN-0351 GENERAL ARRANGEMENT DRAWING FOR RAW WATER TANK ( 31-TK-001 A/B ) IFR IFA HDEC 31-TK-001 A/B Y 22-Oct-21 Y SUBMITTED
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
V N2154-101-A DGN 0352 VN2154-101-A-DGN-0352 NOZZLE ORIENTATION DETAILS FOR TANK ( 31-TK-001 A/B ) IFR IFA HDEC 31-TK-001 A/B Y 31-Jan-22 Y SUBMITTED VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 0353 VN2154-101-A-DGN-0353 SHELL PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0354 VN2154-101-A-DGN-0354 SHELL PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0355 VN2154-101-A-DGN-0355 BOTTOM PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0356 VN2154-101-A-DGN-0356 BOTTOM PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0357 VN2154-101-A-DGN-0357 ROOF PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0358 VN2154-101-A-DGN-0358 ROOF PLATE LAYOUT FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0359 VN2154-101-A-DGN-0359 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0360 VN2154-101-A-DGN-0360 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0361 VN2154-101-A-DGN-0361 DETAIL OF DRAW-OFF SUMP FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 05-Nov-21 Y SUBMITTED
V N2154-101-A DGN 0362 VN2154-101-A-DGN-0362 DETAIL OF SHELL MANWAY (24") FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0363 VN2154-101-A-DGN-0363 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0364 VN2154-101-A-DGN-0364 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0365 VN2154-101-A-DGN-0365 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0366 VN2154-101-A-DGN-0366 DETAIL OF ROOF MANWAY FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0367 VN2154-101-A-DGN-0367 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 05 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0368 VN2154-101-A-DGN-0368 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 05 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0369 VN2154-101-A-DGN-0369 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-001 A/B ) SHT 03 OF 05 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0370 VN2154-101-A-DGN-0370 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-001 A/B ) SHT 04 OF 05 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0371 VN2154-101-A-DGN-0371 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-001 A/B ) SHT 05 OF 05 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0372 VN2154-101-A-DGN-0372 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0373 VN2154-101-A-DGN-0373 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0374 VN2154-101-A-DGN-0374 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0375 VN2154-101-A-DGN-0375 DETAIL OF ROOF HANDRAIL FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0376 VN2154-101-A-DGN-0376 DETAIL OF CAGE LADDER FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0377 VN2154-101-A-DGN-0377 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0378 VN2154-101-A-DGN-0378 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0379 VN2154-101-A-DGN-0379 DETAIL OF NAME PLATE FOR TANK ( 31-TK-001 A/B ) IFR IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0380 VN2154-101-A-DGN-0380 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0381 VN2154-101-A-DGN-0381 DETAIL OF SHELL MANWAY (30") FOR TANK ( 31-TK-001 A/B ) IFI IFR HDEC 31-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Add V N2154-101-A DGN 0382 VN2154-101-A-DGN-0382 Roof Plate Layout For Tank (31-TK-001 A/B) Sht 03 of 03 IFI IFR HDEC 31-TK-001 A/B Y 17-Feb-22 Y SUBMITTED
Add V N2154-101-A DGN 0383 VN2154-101-A-DGN-0383 Nozzle Orientation Details For Tank (31-TK-001 A/B) Sht 02 of 02 IFI IFR HDEC 31-TK-001 A/B Y 17-Feb-22 Y SUBMITTED

V N2154-101-A DGN 0401 VN2154-101-A-DGN-0401 GENERAL ARRANGEMENT DRAWING FOR FILTERED RAW WATER TANK ( 31-TK-002 ) IFR IFA HDEC 31-TK-002 Y 22-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0402 VN2154-101-A-DGN-0402 NOZZLE ORIENTATION DETAILS FOR TANK ( 31-TK-002 ) IFR IFA HDEC 31-TK-002 Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0403 VN2154-101-A-DGN-0403 SHELL PLATE LAYOUT FOR TANK ( 31-TK-002 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0404 VN2154-101-A-DGN-0404 SHELL PLATE LAYOUT FOR TANK ( 31-TK-002 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0405 VN2154-101-A-DGN-0405 BOTTOM PLATE LAYOUT FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0406 VN2154-101-A-DGN-0406 ROOF PLATE LAYOUT FOR TANK ( 31-TK-002 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0407 VN2154-101-A-DGN-0407 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-002 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0408 VN2154-101-A-DGN-0408 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-002 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
V N2154-101-A DGN 0409 VN2154-101-A-DGN-0409 DETAIL OF DRAW-OFF SUMP FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 05-Nov-21 Y SUBMITTED
V N2154-101-A DGN 0410 VN2154-101-A-DGN-0410 DETAIL OF SHELL MANWAY (24") FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0411 VN2154-101-A-DGN-0411 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-002 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0412 VN2154-101-A-DGN-0412 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-002 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0413 VN2154-101-A-DGN-0413 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-002 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
V N2154-101-A DGN 0414 VN2154-101-A-DGN-0414 DETAIL OF ROOF MANWAY FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0415 VN2154-101-A-DGN-0415 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-002 ) SHT 01 OF 05 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0416 VN2154-101-A-DGN-0416 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-002 ) SHT 02 OF 05 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0417 VN2154-101-A-DGN-0417 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-002 ) SHT 03 OF 05 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0418 VN2154-101-A-DGN-0418 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-002 ) SHT 04 OF 05 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0419 VN2154-101-A-DGN-0419 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-002 ) SHT 05 OF 05 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0420 VN2154-101-A-DGN-0420 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-002 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0421 VN2154-101-A-DGN-0421 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-002 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0422 VN2154-101-A-DGN-0422 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-002 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0423 VN2154-101-A-DGN-0423 DETAIL OF ROOF HANDRAIL FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0424 VN2154-101-A-DGN-0424 DETAIL OF CAGE LADDER FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0425 VN2154-101-A-DGN-0425 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-002 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0426 VN2154-101-A-DGN-0426 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-002 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
V N2154-101-A DGN 0427 VN2154-101-A-DGN-0427 DETAIL OF NAME PLATE FOR TANK ( 31-TK-002 ) IFR IFR HDEC 31-TK-002 Y 31-Mar-22 Y
V N2154-101-A DGN 0428 VN2154-101-A-DGN-0428 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Mar-22 Y
V N2154-101-A DGN 0429 VN2154-101-A-DGN-0429 DETAIL OF SHELL MANWAY (30") FOR TANK ( 31-TK-002 ) IFI IFR HDEC 31-TK-002 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0430 VN2154-101-A-DGN-0430 ROOF PLATE LAYOUT FOR TANK ( 31-TK-002 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-002 Y 05-Jan-22 Y SUBMITTED

V N2154-101-A DGN 0451 VN2154-101-A-DGN-0451 GENERAL ARRANGEMENT DRAWING FOR DESALINATED WATER TANK ( 31-TK-003 ) IFR IFA HDEC 31-TK-003 Y 29-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0452 VN2154-101-A-DGN-0452 NOZZLE ORIENTATION DETAILS FOR TANK ( 31-TK-003 ) IFR IFA HDEC 31-TK-003 Y 31-Mar-22 Y
V N2154-101-A DGN 0453 VN2154-101-A-DGN-0453 SHELL PLATE LAYOUT FOR TANK ( 31-TK-003 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0454 VN2154-101-A-DGN-0454 BOTTOM PLATE LAYOUT FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0455 VN2154-101-A-DGN-0455 ROOF PLATE LAYOUT FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0456 VN2154-101-A-DGN-0456 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-003 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0457 VN2154-101-A-DGN-0457 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-003 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
V N2154-101-A DGN 0458 VN2154-101-A-DGN-0458 DETAIL OF DRAW-OFF SUMP FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0459 VN2154-101-A-DGN-0459 DETAIL OF SHELL MANWAY (24") FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0460 VN2154-101-A-DGN-0460 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-003 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0461 VN2154-101-A-DGN-0461 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-003 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 0462 VN2154-101-A-DGN-0462 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-003 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 0463 VN2154-101-A-DGN-0463 DETAIL OF ROOF MANWAY FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0464 VN2154-101-A-DGN-0464 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-003 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0465 VN2154-101-A-DGN-0465 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-003 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0466 VN2154-101-A-DGN-0466 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-003 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0467 VN2154-101-A-DGN-0467 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-003 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0468 VN2154-101-A-DGN-0468 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-003 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0469 VN2154-101-A-DGN-0469 DETAIL OF ROOF HANDRAIL FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0470 VN2154-101-A-DGN-0470 DETAIL OF CAGE LADDER FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0471 VN2154-101-A-DGN-0471 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-003 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0472 VN2154-101-A-DGN-0472 DETAIL OF ROOF STRUCTURE FOR TANK ( 31-TK-003 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
V N2154-101-A DGN 0473 VN2154-101-A-DGN-0473 DETAIL OF NAME PLATE FOR TANK ( 31-TK-003 ) IFR IFR HDEC 31-TK-003 Y 31-Mar-22 Y
V N2154-101-A DGN 0474 VN2154-101-A-DGN-0474 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0475 VN2154-101-A-DGN-0475 DETAIL OF SHELL MANWAY (30") FOR TANK ( 31-TK-003 ) IFI IFR HDEC 31-TK-003 Y 31-Mar-22 Y
V N2154-101-A DGN 0476 VN2154-101-A-DGN-0476 SHELL PLATE LAYOUT FOR TANK ( 31-TK-003 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-003 Y 05-Jan-22 Y SUBMITTED

V N2154-101-A DGN 0501 VN2154-101-A-DGN-0501 GENERAL ARRANGEMENT DRAWING FOR FILTERED RAW WATER AUXILIARY TANK ( 31-TK-004 ) IFR IFA HDEC 31-TK-004 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0502 VN2154-101-A-DGN-0502 NOZZLE ORIENTATION DETAILS FOR TANK ( 31-TK-004 ) IFR IFA HDEC 31-TK-004 Y 31-Mar-22 Y
V N2154-101-A DGN 0503 VN2154-101-A-DGN-0503 SHELL PLATE LAYOUT FOR TANK ( 31-TK-004 )SHT 01 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0504 VN2154-101-A-DGN-0504 BOTTOM PLATE LAYOUT FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0505 VN2154-101-A-DGN-0505 ROOF PLATE LAYOUT FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0506 VN2154-101-A-DGN-0506 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-004 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0507 VN2154-101-A-DGN-0507 DETAIL OF SHELL NOZZLE FOR TANK ( 31-TK-004 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
V N2154-101-A DGN 0508 VN2154-101-A-DGN-0508 DETAIL OF DRAW-OFF SUMP FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0509 VN2154-101-A-DGN-0509 DETAIL OF SHELL MANWAY (24") FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0510 VN2154-101-A-DGN-0510 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-004 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0511 VN2154-101-A-DGN-0511 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-004 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0512 VN2154-101-A-DGN-0512 DETAIL OF ROOF NOZZLE FOR TANK ( 31-TK-004 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0513 VN2154-101-A-DGN-0513 DETAIL OF ROOF MANWAY FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0514 VN2154-101-A-DGN-0514 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-004 ) SHT 01 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0515 VN2154-101-A-DGN-0515 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-004 ) SHT 02 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0516 VN2154-101-A-DGN-0516 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 31-TK-004 ) SHT 03 OF 03 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0517 VN2154-101-A-DGN-0517 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-004 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0518 VN2154-101-A-DGN-0518 DETAILS OF TOP PLATFORM FOR TANK ( 31-TK-004 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0519 VN2154-101-A-DGN-0519 DETAIL OF ROOF HANDRAIL FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0520 VN2154-101-A-DGN-0520 DETAILS OF ROOF STRUCTURE FOR TANK ( 31-TK-004 ) SHT 01 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0521 VN2154-101-A-DGN-0521 DETAILS OF ROOF STRUCTURE FOR TANK ( 31-TK-004 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
V N2154-101-A DGN 0522 VN2154-101-A-DGN-0522 DETAIL OF NAME PLATE FOR TANK ( 31-TK-004 ) IFR IFR HDEC 31-TK-004 Y 31-Mar-22 Y
V N2154-101-A DGN 0523 VN2154-101-A-DGN-0523 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0524 VN2154-101-A-DGN-0524 DETAIL OF SHELL MANWAY (30") FOR TANK ( 31-TK-004 ) IFI IFR HDEC 31-TK-004 Y 31-Mar-22 Y
V N2154-101-A DGN 0525 VN2154-101-A-DGN-0525 SHELL PLATE LAYOUT FOR TANK ( 31-TK-004 ) SHT 02 OF 02 IFI IFR HDEC 31-TK-004 Y 11-Jan-22 Y SUBMITTED

V N2154-101-A DGN 0551 VN2154-101-A-DGN-0551 GENERAL ARRANGEMENT DRAWING FOR DEMINERALIZED WATER TANK ( 33-TK-001 ) IFR IFA HDEC 33-TK-001 Y 22-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0552 VN2154-101-A-DGN-0552 NOZZLE ORIENTATION DETAILS FOR TANK ( 33-TK-001 ) IFR IFA HDEC 33-TK-001 Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0553 VN2154-101-A-DGN-0553 SHELL PLATE LAYOUT FOR TANK ( 33-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0554 VN2154-101-A-DGN-0554 SHELL PLATE LAYOUT FOR TANK ( 33-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0555 VN2154-101-A-DGN-0555 BOTTOM PLATE LAYOUT FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0556 VN2154-101-A-DGN-0556 ROOF PLATE LAYOUT FOR TANK ( 33-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0557 VN2154-101-A-DGN-0557 DETAIL OF SHELL NOZZLE FOR TANK ( 33-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0558 VN2154-101-A-DGN-0558 DETAIL OF SHELL NOZZLE FOR TANK ( 33-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0559 VN2154-101-A-DGN-0559 DETAIL OF DRAW-OFF SUMP FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 05-Nov-21 Y SUBMITTED
V N2154-101-A DGN 0560 VN2154-101-A-DGN-0560 DETAIL OF SHELL MANWAY (24") FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0561 VN2154-101-A-DGN-0561 DETAIL OF ROOF NOZZLE FOR TANK ( 33-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0562 VN2154-101-A-DGN-0562 DETAIL OF ROOF NOZZLE FOR TANK ( 33-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0563 VN2154-101-A-DGN-0563 DETAIL OF ROOF NOZZLE FOR TANK ( 33-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0564 VN2154-101-A-DGN-0564 DETAIL OF ROOF MANWAY FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0565 VN2154-101-A-DGN-0565 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 33-TK-001 ) SHT 01 OF 05 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0566 VN2154-101-A-DGN-0566 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 33-TK-001 ) SHT 02 OF 05 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0567 VN2154-101-A-DGN-0567 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 33-TK-001 ) SHT 03 OF 05 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0568 VN2154-101-A-DGN-0568 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 33-TK-001 ) SHT 04 OF 05 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0569 VN2154-101-A-DGN-0569 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 33-TK-001 ) SHT 05 OF 05 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0570 VN2154-101-A-DGN-0570 DETAILS OF TOP PLATFORM FOR TANK ( 33-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0571 VN2154-101-A-DGN-0571 DETAILS OF TOP PLATFORM FOR TANK ( 33-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0572 VN2154-101-A-DGN-0572 DETAILS OF TOP PLATFORM FOR TANK ( 33-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0573 VN2154-101-A-DGN-0573 DETAIL OF ROOF HANDRAIL FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0574 VN2154-101-A-DGN-0574 DETAIL OF CAGE LADDER FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0575 VN2154-101-A-DGN-0575 DETAIL OF ROOF STRUCTURE FOR TANK ( 33-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0576 VN2154-101-A-DGN-0576 DETAIL OF ROOF STRUCTURE FOR TANK ( 33-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0577 VN2154-101-A-DGN-0577 DETAIL OF NAME PLATE FOR TANK ( 33-TK-001 ) IFR IFR HDEC 33-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0578 VN2154-101-A-DGN-0578 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0579 VN2154-101-A-DGN-0579 DETAIL OF SHELL MANWAY (30") FOR TANK ( 33-TK-001 ) IFI IFR HDEC 33-TK-001 Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0580 VN2154-101-A-DGN-0580 ROOF PLATE LAYOUT FOR TANK ( 33-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 33-TK-001 Y 05-Jan-22 Y SUBMITTED

V N2154-101-A DGN 0601 VN2154-101-A-DGN-0601 GENERAL ARRANGEMENT DRAWING FOR SUSPECT CONDENSATE TANK ( 34-TK-010 ) IFR IFA HDEC 34-TK-010 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0602 VN2154-101-A-DGN-0602 NOZZLE ORIENTATION DETAILS FOR TANK ( 34-TK-010 ) IFR IFA HDEC 34-TK-010 Y 31-Mar-22 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 0603 VN2154-101-A-DGN-0603 SHELL PLATE LAYOUT FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 0604 VN2154-101-A-DGN-0604 BOTTOM PLATE LAYOUT FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0605 VN2154-101-A-DGN-0605 ROOF PLATE LAYOUT FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0606 VN2154-101-A-DGN-0606 DETAIL OF SHELL NOZZLE FOR TANK ( 34-TK-010 ) SHT 01 OF 02 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0607 VN2154-101-A-DGN-0607 DETAIL OF SHELL NOZZLE FOR TANK ( 34-TK-010 ) SHT 02 OF 02 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
V N2154-101-A DGN 0608 VN2154-101-A-DGN-0608 DETAIL OF DRAW-OFF SUMP FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0609 VN2154-101-A-DGN-0609 DETAIL OF SHELL MANWAY FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0610 VN2154-101-A-DGN-0610 DETAIL OF ROOF NOZZLE FOR TANK ( 34-TK-010 ) SHT 01 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0611 VN2154-101-A-DGN-0611 DETAIL OF ROOF NOZZLE FOR TANK ( 34-TK-010 ) SHT 02 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0612 VN2154-101-A-DGN-0612 DETAIL OF ROOF NOZZLE FOR TANK ( 34-TK-010 ) SHT 03 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0613 VN2154-101-A-DGN-0613 DETAIL OF ROOF MANWAY FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0614 VN2154-101-A-DGN-0614 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 34-TK-010 ) SHT 01 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0615 VN2154-101-A-DGN-0615 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 34-TK-010 ) SHT 02 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0616 VN2154-101-A-DGN-0616 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 34-TK-010 ) SHT 03 OF 03 IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0617 VN2154-101-A-DGN-0617 DETAIL OF ROOF HANDRAIL FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y
V N2154-101-A DGN 0618 VN2154-101-A-DGN-0618 DETAIL OF NAME PLATE FOR TANK ( 34-TK-010 ) IFR IFR HDEC 34-TK-010 Y 31-Mar-22 Y
V N2154-101-A DGN 0619 VN2154-101-A-DGN-0619 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 34-TK-010 ) IFI IFR HDEC 34-TK-010 Y 31-Mar-22 Y

V N2154-101-A DGN 0651 VN2154-101-A-DGN-0651 GENERAL ARRANGEMENT DRAWING FOR POTABLE WATER TANK ( 35-TK-001 ) IFR IFA HDEC 35-TK-001 Y 29-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0652 VN2154-101-A-DGN-0652 NOZZLE ORIENTATION DETAILS FOR TANK ( 35-TK-001 ) IFR IFA HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0653 VN2154-101-A-DGN-0653 SHELL PLATE LAYOUT FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0654 VN2154-101-A-DGN-0654 BOTTOM PLATE LAYOUT FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0655 VN2154-101-A-DGN-0655 ROOF PLATE LAYOUT FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0656 VN2154-101-A-DGN-0656 DETAIL OF SHELL NOZZLE FOR TANK ( 35-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0657 VN2154-101-A-DGN-0657 DETAIL OF SHELL NOZZLE FOR TANK ( 35-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0658 VN2154-101-A-DGN-0658 DETAIL OF DRAW-OFF SUMP FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0659 VN2154-101-A-DGN-0659 DETAIL OF SHELL MANWAY (24") FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0660 VN2154-101-A-DGN-0660 DETAIL OF ROOF NOZZLE FOR TANK ( 35-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0661 VN2154-101-A-DGN-0661 DETAIL OF ROOF NOZZLE FOR TANK ( 35-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0662 VN2154-101-A-DGN-0662 DETAIL OF ROOF NOZZLE FOR TANK ( 35-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0663 VN2154-101-A-DGN-0663 DETAIL OF ROOF MANWAY FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0664 VN2154-101-A-DGN-0664 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 35-TK-001 ) SHT 01 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0665 VN2154-101-A-DGN-0665 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 35-TK-001 ) SHT 02 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0666 VN2154-101-A-DGN-0666 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 35-TK-001 ) SHT 03 OF 03 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0667 VN2154-101-A-DGN-0667 DETAILS OF TOP PLATFORM FOR TANK ( 35-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0668 VN2154-101-A-DGN-0668 DETAILS OF TOP PLATFORM FOR TANK ( 35-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0669 VN2154-101-A-DGN-0669 DETAIL OF ROOF HANDRAIL FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0670 VN2154-101-A-DGN-0670 DETAILS OF ROOF STRUCTURE FOR TANK ( 35-TK-001 ) SHT 01 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0671 VN2154-101-A-DGN-0671 DETAILS OF ROOF STRUCTURE FOR TANK ( 35-TK-001 ) SHT 02 OF 02 IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0672 VN2154-101-A-DGN-0672 DETAIL OF NAME PLATE FOR TANK ( 35-TK-001 ) IFR IFR HDEC 35-TK-001 Y 31-Mar-22 Y
V N2154-101-A DGN 0673 VN2154-101-A-DGN-0673 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y
Change V N2154-101-A DGN 0674 VN2154-101-A-DGN-0674 DETAIL OF SHELL MANWAY (30") FOR TANK ( 35-TK-001 ) IFI IFR HDEC 35-TK-001 Y 31-Mar-22 Y

V N2154-101-A DGN 0701 VN2154-101-A-DGN-0701 GENERAL ARRANGEMENT DRAWING FOR 20% SODA SOLUTION TANK ( 44-TK-001 A/B ) IFR IFA HDEC 44-TK-001 A/B Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0702 VN2154-101-A-DGN-0702 NOZZLE ORIENTATION DETAILS FOR TANK ( 44-TK-001 A/B ) IFR IFA HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0703 VN2154-101-A-DGN-0703 SHELL, BOTTOM & ROOF PLATE LAYOUT FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0704 VN2154-101-A-DGN-0704 DETAIL OF SHELL NOZZLE FOR TANK ( 44-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0705 VN2154-101-A-DGN-0705 DETAIL OF SHELL NOZZLE FOR TANK ( 44-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0706 VN2154-101-A-DGN-0706 DETAIL OF DRAW-OFF SUMP FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0707 VN2154-101-A-DGN-0707 DETAIL OF SHELL MANWAY FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0708 VN2154-101-A-DGN-0708 DETAIL OF ROOF NOZZLE FOR TANK ( 44-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0709 VN2154-101-A-DGN-0709 DETAIL OF ROOF NOZZLE FOR TANK ( 44-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0710 VN2154-101-A-DGN-0710 DETAIL OF ROOF NOZZLE FOR TANK ( 44-TK-001 A/B ) SHT 013OF 03 IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0711 VN2154-101-A-DGN-0711 DETAIL OF ROOF MANWAY FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0712 VN2154-101-A-DGN-0712 DETAIL OF CAGE LADDER FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0713 VN2154-101-A-DGN-0713 DETAIL OF ROOF HANDRAIL FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0714 VN2154-101-A-DGN-0714 DETAIL OF NAME PLATE FOR TANK ( 44-TK-001 A/B ) IFR IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0715 VN2154-101-A-DGN-0715 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 44-TK-001 A/B ) IFI IFR HDEC 44-TK-001 A/B Y 31-Mar-22 Y

V N2154-101-A DGN 0751 VN2154-101-A-DGN-0751 GENERAL ARRANGEMENT DRAWING FOR OILY WATER STORAGE TANK ( 46-TK-001 A/B ) IFR IFA HDEC 46-TK-001 A/B Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0752 VN2154-101-A-DGN-0752 NOZZLE ORIENTATION DETAILS FOR TANK ( 46-TK-001 A/B ) IFR IFA HDEC 46-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0753 VN2154-101-A-DGN-0753 SHELL PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0754 VN2154-101-A-DGN-0754 SHELL PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0755 VN2154-101-A-DGN-0755 BOTTOM PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0756 VN2154-101-A-DGN-0756 BOTTOM PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0757 VN2154-101-A-DGN-0757 ROOF PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0758 VN2154-101-A-DGN-0758 ROOF PLATE LAYOUT FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0759 VN2154-101-A-DGN-0759 DETAIL OF SHELL NOZZLE FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0760 VN2154-101-A-DGN-0760 DETAIL OF SHELL NOZZLE FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0761 VN2154-101-A-DGN-0761 DETAIL OF DRAW-OFF SUMP FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 19-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0762 VN2154-101-A-DGN-0762 DETAIL OF SHELL MANWAY (24") FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0763 VN2154-101-A-DGN-0763 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0764 VN2154-101-A-DGN-0764 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0765 VN2154-101-A-DGN-0765 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0766 VN2154-101-A-DGN-0766 DETAIL OF ROOF MANWAY FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 0767 VN2154-101-A-DGN-0767 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 05 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 0768 VN2154-101-A-DGN-0768 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 05 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0769 VN2154-101-A-DGN-0769 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-001 A/B ) SHT 03 OF 05 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0770 VN2154-101-A-DGN-0770 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-001 A/B ) SHT 04 OF 05 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0771 VN2154-101-A-DGN-0771 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-001 A/B ) SHT 05 OF 05 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0772 VN2154-101-A-DGN-0772 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0773 VN2154-101-A-DGN-0773 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0774 VN2154-101-A-DGN-0774 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0775 VN2154-101-A-DGN-0775 DETAIL OF ROOF HANDRAIL FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0776 VN2154-101-A-DGN-0776 DETAIL OF CAGE LADDER FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0777 VN2154-101-A-DGN-0777 DETAIL OF ROOF STRUCTURE FOR TANK ( 46-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0778 VN2154-101-A-DGN-0778 DETAIL OF ROOF STRUCTURE FOR TANK ( 46-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0779 VN2154-101-A-DGN-0779 DETAIL OF NAME PLATE FOR TANK ( 46-TK-001 A/B ) IFR IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0780 VN2154-101-A-DGN-0780 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0781 VN2154-101-A-DGN-0781 DETAIL OF SHELL MANWAY (30") FOR TANK ( 46-TK-001 A/B ) IFI IFR HDEC 46-TK-001 A/B Y 31-Mar-22 Y

V N2154-101-A DGN 0801 VN2154-101-A-DGN-0801 GENERAL ARRANGEMENT DRAWING FOR EQUALIZATION TANK ( 46-TK-002 A/B ) IFR IFA HDEC 46-TK-002 A/B Y 29-Oct-21 Y SUBMITTED
Change V N2154-101-A DGN 0802 VN2154-101-A-DGN-0802 NOZZLE ORIENTATION DETAILS FOR TANK ( 46-TK-002 A/B ) IFR IFA HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0803 VN2154-101-A-DGN-0803 SHELL PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0804 VN2154-101-A-DGN-0804 SHELL PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0805 VN2154-101-A-DGN-0805 BOTTOM PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0806 VN2154-101-A-DGN-0806 BOTTOM PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0807 VN2154-101-A-DGN-0807 ROOF PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0808 VN2154-101-A-DGN-0808 ROOF PLATE LAYOUT FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0809 VN2154-101-A-DGN-0809 DETAIL OF SHELL NOZZLE FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0810 VN2154-101-A-DGN-0810 DETAIL OF SHELL NOZZLE FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0811 VN2154-101-A-DGN-0811 DETAIL OF DRAW-OFF SUMP FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 12-Nov-21 Y SUBMITTED
Change V N2154-101-A DGN 0812 VN2154-101-A-DGN-0812 DETAIL OF SHELL MANWAY (24") FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0813 VN2154-101-A-DGN-0813 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0814 VN2154-101-A-DGN-0814 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0815 VN2154-101-A-DGN-0815 DETAIL OF ROOF NOZZLE FOR TANK ( 46-TK-002 A/B ) SHT 03 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0816 VN2154-101-A-DGN-0816 DETAIL OF ROOF MANWAY FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0817 VN2154-101-A-DGN-0817 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 05 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0818 VN2154-101-A-DGN-0818 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 05 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0819 VN2154-101-A-DGN-0819 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-002 A/B ) SHT 03 OF 05 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0820 VN2154-101-A-DGN-0820 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-002 A/B ) SHT 04 OF 05 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0821 VN2154-101-A-DGN-0821 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 46-TK-002 A/B ) SHT 05 OF 05 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0822 VN2154-101-A-DGN-0822 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0823 VN2154-101-A-DGN-0823 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0824 VN2154-101-A-DGN-0824 DETAILS OF TOP PLATFORM FOR TANK ( 46-TK-002 A/B ) SHT 03 OF 03 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0825 VN2154-101-A-DGN-0825 DETAIL OF ROOF HANDRAIL FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0826 VN2154-101-A-DGN-0826 DETAIL OF CAGE LADDER FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0827 VN2154-101-A-DGN-0827 DETAIL OF ROOF STRUCTURE FOR TANK ( 46-TK-002 A/B ) SHT 01 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0828 VN2154-101-A-DGN-0828 DETAIL OF ROOF STRUCTURE FOR TANK ( 46-TK-002 A/B ) SHT 02 OF 02 IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0829 VN2154-101-A-DGN-0829 DETAIL OF NAME PLATE FOR TANK ( 46-TK-002 A/B ) IFR IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0830 VN2154-101-A-DGN-0830 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0831 VN2154-101-A-DGN-0831 DETAIL OF SHELL MANWAY (30") FOR TANK ( 46-TK-002 A/B ) IFI IFR HDEC 46-TK-002 A/B Y 31-Mar-22 Y

V N2154-101-A DGN 0851 VN2154-101-A-DGN-0851 GENERAL ARRANGEMENT DRAWING FOR FIRE WATER / SERVICE WATER TANK ( 47-TK-001 A/B ) IFR IFA HDEC 47-TK-001 A/B Y 22-Oct-21 Y SUBMITTED
V N2154-101-A DGN 0852 VN2154-101-A-DGN-0852 NOZZLE ORIENTATION DETAILS FOR TANK ( 47-TK-001 A/B ) IFR IFA HDEC 47-TK-001 A/B Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0853 VN2154-101-A-DGN-0853 SHELL PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0854 VN2154-101-A-DGN-0854 SHELL PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0855 VN2154-101-A-DGN-0855 BOTTOM PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0856 VN2154-101-A-DGN-0856 BOTTOM PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0857 VN2154-101-A-DGN-0857 ROOF PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0858 VN2154-101-A-DGN-0858 ROOF PLATE LAYOUT FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0859 VN2154-101-A-DGN-0859 DETAIL OF SHELL NOZZLE FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0860 VN2154-101-A-DGN-0860 DETAIL OF SHELL NOZZLE FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0861 VN2154-101-A-DGN-0861 DETAIL OF DRAW-OFF SUMP FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 05-Nov-21 Y SUBMITTED
V N2154-101-A DGN 0862 VN2154-101-A-DGN-0862 DETAIL OF SHELL MANWAY (24") FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0863 VN2154-101-A-DGN-0863 DETAIL OF ROOF NOZZLE FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0864 VN2154-101-A-DGN-0864 DETAIL OF ROOF NOZZLE FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0865 VN2154-101-A-DGN-0865 DETAIL OF ROOF NOZZLE FOR TANK ( 47-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0866 VN2154-101-A-DGN-0866 DETAIL OF ROOF MANWAY FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0867 VN2154-101-A-DGN-0867 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 05 IFI IFR HDEC 47-TK-001 A/B Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0868 VN2154-101-A-DGN-0868 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 05 IFI IFR HDEC 47-TK-001 A/B Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0869 VN2154-101-A-DGN-0869 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 47-TK-001 A/B ) SHT 03 OF 05 IFI IFR HDEC 47-TK-001 A/B Y 31-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0870 VN2154-101-A-DGN-0870 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 47-TK-001 A/B ) SHT 04 OF 05 IFI IFR HDEC 47-TK-001 A/B Y 31-Jan-22 Y SUBMITTED
Change V N2154-101-A DGN 0871 VN2154-101-A-DGN-0871 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 47-TK-001 A/B ) SHT 05 OF 05 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0872 VN2154-101-A-DGN-0872 DETAILS OF TOP PLATFORM FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0873 VN2154-101-A-DGN-0873 DETAILS OF TOP PLATFORM FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0874 VN2154-101-A-DGN-0874 DETAILS OF TOP PLATFORM FOR TANK ( 47-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0875 VN2154-101-A-DGN-0875 DETAIL OF ROOF HANDRAIL FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0876 VN2154-101-A-DGN-0876 DETAIL OF CAGE LADDER FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0877 VN2154-101-A-DGN-0877 DETAIL OF ROOF STRUCTURE FOR TANK ( 47-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 0878 VN2154-101-A-DGN-0878 DETAIL OF ROOF STRUCTURE FOR TANK ( 47-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 0879 VN2154-101-A-DGN-0879 DETAIL OF NAME PLATE FOR TANK ( 47-TK-001 A/B ) IFR IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0880 VN2154-101-A-DGN-0880 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0881 VN2154-101-A-DGN-0881 DETAIL OF SHELL MANWAY (30") FOR TANK ( 47-TK-001 A/B ) IFI IFR HDEC 47-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Add V N2154-101-A DGN 0882 VN2154-101-A-DGN-0882 Roof Plate Layout For 47-TK-001 A/B Sht 03 of 03 IFI IFR HDEC 47-TK-001 A/B Y 17-Feb-22 Y SUBMITTED
Add V N2154-101-A DGN 0883 VN2154-101-A-DGN-0883 Nozzle Orientation Details for 47-TK-001 A/B Sht 02 of 02 IFI IFR HDEC 47-TK-001 A/B Y 17-Feb-22 Y SUBMITTED

V N2154-101-A DGN 0901 VN2154-101-A-DGN-0901 GENERAL ARRANGEMENT DRAWING FOR SULPHUR TANK ( 49-TK-001 A/B ) IFR IFA HDEC 49-TK-001 A/B Y 10-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0902 VN2154-101-A-DGN-0902 NOZZLE ORIENTATION DETAILS FOR TANK ( 49-TK-001 A/B ) IFR IFA HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0903 VN2154-101-A-DGN-0903 SHELL PLATE LAYOUT FOR TANK ( 49-TK-001 A/B )SHT 01 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
V N2154-101-A DGN 0904 VN2154-101-A-DGN-0904 BOTTOM PLATE LAYOUT FOR TANK ( 49-TK-001 A/B )SHT 01 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Dec-21 Y SUBMITTED
Change V N2154-101-A DGN 0905 VN2154-101-A-DGN-0905 ROOF PLATE LAYOUT FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0906 VN2154-101-A-DGN-0906 DETAIL OF SHELL NOZZLE FOR TANK ( 49-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0907 VN2154-101-A-DGN-0907 DETAIL OF SHELL NOZZLE FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0908 VN2154-101-A-DGN-0908 DETAIL OF DRAW-OFF SUMP FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 19-Nov-21 Y SUBMITTED
V N2154-101-A DGN 0909 VN2154-101-A-DGN-0909 DETAIL OF SHELL MANWAY (24" X 28" ) FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Jan-22 Y
V N2154-101-A DGN 0910 VN2154-101-A-DGN-0910 DETAIL OF ROOF NOZZLE FOR TANK ( 49-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0911 VN2154-101-A-DGN-0911 DETAIL OF ROOF NOZZLE FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0912 VN2154-101-A-DGN-0912 DETAIL OF ROOF NOZZLE FOR TANK ( 49-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0913 VN2154-101-A-DGN-0913 DETAIL OF ROOF MANWAY FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0914 VN2154-101-A-DGN-0914 DETAIL OF CLEAN OUT DOOR FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0915 VN2154-101-A-DGN-0915 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 49-TK-001 A/B ) SHT 01 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0916 VN2154-101-A-DGN-0916 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0917 VN2154-101-A-DGN-0917 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 49-TK-001 A/B ) SHT 03 OF 03 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0918 VN2154-101-A-DGN-0918 DETAILS OF TOP PLATFORM FOR TANK ( 49-TK-001 A/B ) SHT 01 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0919 VN2154-101-A-DGN-0919 DETAILS OF TOP PLATFORM FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0920 VN2154-101-A-DGN-0920 DETAIL OF ROOF HANDRAIL FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0921 VN2154-101-A-DGN-0921 DETAIL OF ROOF STRUCTURE FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0922 VN2154-101-A-DGN-0922 DETAIL OF HEATING COIL FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0923 VN2154-101-A-DGN-0923 DEATIL OF INSULATION SUPPORT CLIP FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0924 VN2154-101-A-DGN-0924 DETAIL OF NAME PLATE FOR TANK ( 49-TK-001 A/B ) IFR IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0925 VN2154-101-A-DGN-0925 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
Change V N2154-101-A DGN 0926 VN2154-101-A-DGN-0926 DETAIL OF SHELL MANWAY (30" X 36" ) FOR TANK ( 49-TK-001 A/B ) IFI IFR HDEC 49-TK-001 A/B Y 31-Mar-22 Y
V N2154-101-A DGN 0927 VN2154-101-A-DGN-0927 SHELL PLATE LAYOUT FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 11-Jan-22 Y SUBMITTED
V N2154-101-A DGN 0928 VN2154-101-A-DGN-0928 BOTTOM PLATE LAYOUT FOR TANK ( 49-TK-001 A/B ) SHT 02 OF 02 IFI IFR HDEC 49-TK-001 A/B Y 11-Jan-22 Y SUBMITTED

V N2154-101-A EIC 5001 VN2154-101-A-EIC-5001 INSTRUMENT INDEX (AST-I) IFI IFR HDEC COMMON N 15-Feb-22 Y
V N2154-101-A EIC 5002 VN2154-101-A-EIC-5002 INSTRUMENT DATA SHEET - BREATHER VALVE (AST-I) IFI IFR HDEC COMMON N 25-Feb-22 Y SUBMITTED
V N2154-101-A EIC 5003 VN2154-101-A-EIC-5003 INSTRUMENT DATA SHEET - EMERGENCY RELIEF HATCH (AST-I) IFI IFR HDEC COMMON N 25-Feb-22 Y SUBMITTED
V N2154-101-A EIC 5004 VN2154-101-A-EIC-5004 INSTRUMENT DATA SHEET - RUPTURE DISC (AST-I) IFI IFR HDEC COMMON N 25-Feb-22 Y
V N2154-101-A EIC 5005 VN2154-101-A-EIC-5005 INSTRUMENT SPECIFICATION - BREATHER VALVE (AST-I) IFR IFR HDEC COMMON N 07-Mar-22 Y SUBMITTED
V N2154-101-A EIC 5006 VN2154-101-A-EIC-5006 INSTRUMENT SPECIFICATION - EMERGENCY RELIEF HATCH (AST-I) IFI IFR HDEC COMMON N 07-Mar-22 Y SUBMITTED
V N2154-101-A EIC 5007 VN2154-101-A-EIC-5007 INSTRUMENT SPECIFICATION - RUPTURE DISC (AST-I) IFI IFR HDEC COMMON N 07-Mar-22 Y
V N2154-101-A PRO 0002 VN2154-101-A-PRO-0002 MATERIAL REQUISITION - BREATHER VALVE (AST-I) IFI IFR HDEC COMMON N 15-Mar-22 Y
V N2154-101-A PRO 0003 VN2154-101-A-PRO-0003 MATERIAL REQUISITION - EMERGENCY RELIEF HATCH (AST-I) IFI IFR HDEC COMMON N 15-Mar-22 Y
V N2154-101-A PRO 0004 VN2154-101-A-PRO-0004 MATERIAL REQUISITION - RUPTURE DISC (AST-I) IFI IFR HDEC COMMON N 15-Mar-22 Y
V N2154-101-A DGN 2051 VN2154-101-A-DGN-2051 VENDOR MECHANICAL CATALOGUE (VMC) - INDEX IFI IFI HDEC COMMON N 20-Jan-22 Y
V N2154-101-A DGN 2052 VN2154-101-A-DGN-2052 VENDOR MECHANICAL CATALOGUE (VMC) IFI IFI HDEC COMMON N 20-Jan-22 Y
V N2154-101-A PLN 7001 VN2154-101-A-PLN-7001 INSPECTION AND TEST PLAN (AT SHOP) IFR IFA COMMON COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7002 VN2154-101-A-PLN-7002 INSPECTION AND TEST PLAN (AT SITE) IFR IFA COMMON COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7003 VN2154-101-A-PLN-7003 INSPECTION AND TEST PROCEDURE (AT SHOP) IFI IFA COMMON COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7004 VN2154-101-A-PLN-7004 INSPECTION AND TEST PROCEDURE (AT SITE) IFR IFA COMMON COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7005 VN2154-101-A-PLN-7005 MATERIAL TRACEABILITY PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 20-Dec-21 Y
V N2154-101-A PLN 7006 VN2154-101-A-PLN-7006 WPS & PQR WITH WELDING MAP (AT SHOP) IFI IFA COMMON COMMON N 24-Nov-21 Y
V N2154-101-A PLN 7007 VN2154-101-A-PLN-7007 WPS & PQR WITH WELDING MAP (AT SITE) IFI IFA COMMON COMMON N 20-Dec-21 Y
V N2154-101-A PLN 7008 VN2154-101-A-PLN-7008 WELDER'S & WELDING OPERATOR'S LIST WITH QUALIFICATION REPORT (AT SHOP) IFI IFA HDEC COMMON N 24-Nov-21 Y
V N2154-101-A PLN 7009 VN2154-101-A-PLN-7009 WELDING REPAIR PROCEDURE (AT SHOP & SITE) IFI IFA COMMON COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7010 VN2154-101-A-PLN-7010 WELDING CONSUMABLE HANDLING PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7011 VN2154-101-A-PLN-7011 NDE PROCEDURE (AT SHOP) IFI IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7012 VN2154-101-A-PLN-7012 PWHT / HEAT TREATMENT PROCEDURE (AT SHOP) IFR IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7013 VN2154-101-A-PLN-7013 PWHT / HEAT TREATMENT PROCEDURE (AT SITE) IFR IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7014 VN2154-101-A-PLN-7014 SURFACE PREPARATION & PAINTING PROCEDURE (INCL. COATING SUMMARY & MAP) (AT SHOP) IFR IFA COMMON COMMON N 20-Dec-21 Y
V N2154-101-A PLN 7015 VN2154-101-A-PLN-7015 SURFACE PREPARATION & PAINTING PROCEDURE (INCL. COATING SUMMARY & MAP) (AT SITE) IFR IFA COMMON COMMON N 20-Dec-21 Y
V N2154-101-A PLN 7016 VN2154-101-A-PLN-7016 RUST PREVENTION PROCEDURE (AT SHOP & SITE) IFI IFA COMMON COMMON N 10-Jan-22 Y
V N2154-101-A PLN 7017 VN2154-101-A-PLN-7017 PMI PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 10-Jan-22 Y
V N2154-101-A PLN 7018 VN2154-101-A-PLN-7018 PROCEDURE OF EACH INSPECTION AND TEST IFI IFA HDEC COMMON N 26-Nov-21 Y
V N2154-101-A PLN 7019 VN2154-101-A-PLN-7019 HYDROSTATIC TEST PROCEDURE (AT SHOP) IFR IFA COMMON COMMON N 10-Jan-22 Y
V N2154-101-A PLN 7020 VN2154-101-A-PLN-7020 HYDROSTATIC TEST PROCEDURE (AT SITE) IFI IFA HDEC COMMON N 24-Nov-21 Y
V N2154-101-A PLN 7021 VN2154-101-A-PLN-7021 VACUUM BOX TEST PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 20-Jan-22 Y
V N2154-101-A PLN 7022 VN2154-101-A-PLN-7022 HARDNESS TEST PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 25-Jan-22 Y
V N2154-101-A PLN 7023 VN2154-101-A-PLN-7023 POPPING TEST PROCEDURE FOR BREATHER VALVE IFI IFA HDEC COMMON N 25-Jan-22 Y
V N2154-101-A PLN 7024 VN2154-101-A-PLN-7024 BOLT TENSIONING PROCEDURE IFI IFA HDEC COMMON N 25-Jan-22 Y
V N2154-101-A PLN 7025 VN2154-101-A-PLN-7025 PICKLING AND PASSIVATION PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 15-Jan-22 Y
V N2154-101-A PLN 7026 VN2154-101-A-PLN-7026 PLATE CLEAN-UP PROCEDURE AT SITE IFI IFA HDEC COMMON N 15-Jan-22 Y
V N2154-101-A PLN 7027 VN2154-101-A-PLN-7027 LONG TERMN PRESERVATION / STORAGE PROCEDURE AT SITE IFI IFA JGC COMMON N 20-Jan-22 Y
V N2154-101-A PLN 7028 VN2154-101-A-PLN-7028 SHIPPING AND PACKING PROCEDURE IFI IFA HDEC COMMON N 15-Dec-21 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (I)__RN2154-101
Project Doc. No.:
V N2154-101-A PLN 9000 VN2154-101-A-PLN-9000 INDEX OF MANUFACTURING DATA RECORD BOOK (MDRB) IFI IFA HDEC COMMON N 05-Feb-22 Y VN2154-101-A-ZZZ-9999
V N2154-101-A PLN 7029 VN2154-101-A-PLN-7029 SITE FABRICATION & ERECTION PROCEDURE IFI IFA HDEC COMMON N 22-Dec-21 Y
V N2154-101-A PLN 7030 VN2154-101-A-PLN-7030 HYDRO-PNEUMATIC TEST PROCEDURE FOR API 620 TANK IFR IFA HDEC COMMON N 22-Dec-21 Y
V N2154-101-A PLN 7031 VN2154-101-A-PLN-7031 CALIBRATION PROCEDURE IFI IFA HDEC COMMON N 22-Dec-21 Y
V N2154-101-A PLN 7032 VN2154-101-A-PLN-7032 GENERAL REPAIR PROCEDURE IFR IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7033 VN2154-101-A-PLN-7033 METHOD STATEMENT FOR ERECTION OF CS DOME ROOF TANK IFR IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7034 VN2154-101-A-PLN-7034 METHOD STATEMENT FOR ERECTION OF CS CONE ROOF TANK IFR IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7035 VN2154-101-A-PLN-7035 METHOD STATEMENT FOR ERECTION OF INTERNAL FLOATING ROOF TANK IFI IFA HDEC COMMON N 05-Jan-22 Y
V N2154-101-A PLN 7036 VN2154-101-A-PLN-7036 METHOD STATEMENT FOR SCAFFOLD IFI IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7037 VN2154-101-A-PLN-7037 METHOD STATEMENT FOR PAINTING & BLASTING IFI IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7038 VN2154-101-A-PLN-7038 METHOD STATEMENT FOR INSULATION IFI IFA HDEC COMMON N 20-Jan-22 Y
V N2154-101-A PLN 7039 VN2154-101-A-PLN-7039 HOLIDAY TEST PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 10-Jan-22 Y
V N2154-101-A PLN 7040 VN2154-101-A-PLN-7040 SUBCONTRACTOR SITE SAFETY AND ENVIRONMENTAL PROGRAM IFI IFA HDEC COMMON N Y
V N2154-101-A PLN 7041 VN2154-101-A-PLN-7041 AWP PROCEDURE IFI IFA HDEC COMMON N 15-Dec-21 Y
V N2154-101-A PLN 7042 VN2154-101-A-PLN-7042 METHOD STATEMENT FOR PIPING WORK IFI IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7043 VN2154-101-A-PLN-7043 LEAK TEST PROCEDURE FOR NOZZLE REINFORCEMENT PAD IFI IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7044 VN2154-101-A-PLN-7044 VISUAL INSPECTION PROCEDURE (AT SHOP & SITE) IFI IFA HDEC COMMON N 02-Dec-21 Y
V N2154-101-A PLN 7045 VN2154-101-A-PLN-7045 OIL PENETRANT TEST PROCEDURE (AT SHOP & SITE) IFR IFA HDEC COMMON N 15-Jan-22 Y
V N2154-101-A PLN 7046 VN2154-101-A-PLN-7046 WELDER'S & WELDING OPERATOR'S LIST WITH QUALIFICATION REPORT (AT SITE) IFR IFA HDEC COMMON N 15-Jun-22 Y
V N2154-101-A SPP 0001 VN2154-101-A-SPP-0001 CONSTRUCTION, PRE-COMMISSIONING, AND COMMISSIONING SPARE PARTS LIST IFI IFA HDEC COMMON N 10-Feb-22 Y
V N2154-101-A SPP 0002 VN2154-101-A-SPP-0002 OPERATING SPARE PARTS LIST IFA IFA COMMON COMMON N 10-Feb-22 Y
V N2154-101-A SPP 0003 VN2154-101-A-SPP-0003 OPERATIONAL CONSUMABLE LIST IFI IFA COMMON COMMON N 10-Feb-22 Y
V N2154-101-A SPP 0004 VN2154-101-A-SPP-0004 SPECIAL TOOL LIST IFR IFA COMMON COMMON N 10-Feb-22 Y
V N2154-101-A SPP 0005 VN2154-101-A-SPP-0005 SPARE PART INTERCHANGEABILITY RECORD IFI IFA HDEC COMMON N 10-Feb-22 Y
V N2154-101-A MDR 0001 VN2154-101-A-MDR-0001 MANUFACTURING DATA RECORD BOOK (MDRB) IFI IFR HDEC COMMON N 10-Jun-22 Y
V N2154-101-A ZZZ 0001 VN2154-101-A-ZZZ-0001 PRELIMINARY PACKING LIST IFI IFR COMMON COMMON N 10-Jun-22 Y
V N2154-101-A ZZZ 0002 VN2154-101-A-ZZZ-0002 PACKING LIST IFI IFR COMMON COMMON N 10-Jun-22 Y
V N2154-101-A ZZZ 9001 VN2154-101-A-ZZZ-9001 EQUIPMENT AND INSTRUMENT DATABASE RECORD (EIDR) IFI IFR COMMON COMMON N 10-Jun-22 Y
Change V N2154-101-A PRO 0012 VN2154-101-A-PRO-0012 SUB-VENDOR LIST IFR IFA HDEC COMMON N 20-Jan-22 Y
V N2154-101-A ZZZ 0005 VN2154-101-A-ZZZ-0005 ORGANIZATION CHART IFR IFI COMMON COMMON N 13-Dec-21 Y
V N2154-101-A ZZZ 0006 VN2154-101-A-ZZZ-0006 PROJECT SCHEDULE IFR IFR COMMON COMMON N 13-Dec-21 Y
V N2154-101-A ZZZ 0007 VN2154-101-A-ZZZ-0007 PROJECT QUALITY PLAN (AT SHOP & SITE) IFI IFA HDEC COMMON N 24-Nov-21 Y
V N2154-101-A ZZZ 0008 VN2154-101-A-ZZZ-0008 MASTER CONTROL LIST (MCL) BLANK FORM IFI IFR COMMON COMMON N 10-Mar-22 Y
V N2154-101-A ZZZ 0009 VN2154-101-A-ZZZ-0009 MASTER CONTROL LIST (MCL) IFI IFR COMMON COMMON N 10-Mar-22 Y
V N2154-101-A ZZZ 0010 VN2154-101-A-ZZZ-0010 MATERIAL SUB-ORDER SPECIFICATION IFR IFA COMMON COMMON N 10-Mar-22 Y
V N2154-101-A ZZZ 0011 VN2154-101-A-ZZZ-0011 EXTENT OF SHOP FABRICATION IFI IFR COMMON COMMON N 25-Jan-22 Y
Attachment-4 : Material / Compoment Sub-Ordering Status

Note-1 : ALL Materials & Components required for this PO including the ones not yet ordered.

2.050%

1-Oct-21
30% 40% 30% 30% 40% 30% 100%
Sub-Ordering Date Ready for Dispatch Delivery Sub-Ordering progress Ready for Dispatch Delivery Total
Actual Date
Line Tentative Sub-Order
Material / Component WTG Actual Actual Actual Received at
No. Q`ty Number Plan Date Plan Month Actual Date Plan Date Plan Month Actual Date Plan Date Plan Month Actual Date Plan Actual Plan Actual Plan Actual Plan Actual
Month Month Month Shop

1 Sump Plate 22 MT 0.25% PO-001 1-Nov-21 Nov-2021 25-Oct-21 Oct-2021 5-Jan-22 Jan-2022 15-Nov-21 Nov-2021 14-Feb-22 Feb-2022 28-Nov-21 Nov-2021 0.07% 0.07% 0.10% 0.10% 0.07% 0.07%

2 Sump Plate 19 MT 0.21% PO-001 1-Nov-21 Nov-2021 25-Oct-21 Oct-2021 16-Mar-22 Mar-2022 0.06% 0.06% 0.00% 0.00% 0.06% 0.00%

3 Plates for Tanks Exstock 1,263 MT 6.83% PO-002 25-Mar-22 Mar-2022 15-Mar-22 Mar-2022 0.00% 2.05% 0.00% 0.00% 2.05% 0.00%

4 Plates for Tanks AM/NS 10,227 MT 55.32% PO-002 28-Apr-22 Apr-2022 28-Apr-22 Apr-2022 17-Jun-22 Jun-2022 16.60% 16.60% 0.00% 0.00% 16.60% 0.00%

5 Structure for Tanks Lot1 600 MT 3.14% 30-Mar-22 Mar-2022 27-Apr-22 Apr-2022 24-Apr-22 Apr-2022 9-May-22 May-2022 0.94% 0.94% 1.26% 0.00% 0.94% 0.00%
c
6 Structure for Tanks Lot2 1,600 MT 8.37% 20-May-22 May-2022 4-Jul-22 Jul-2022 2.51% 0.00% 0.00% 0.00% 2.51% 0.00%
c
Fire fighting Pipes &
7 5,000 RMT 4.03% 20-May-22 May-2022 1-Jul-22 Jul-2022 5-Aug-22 Aug-2022 1.21% 0.00% 1.61% 0.00% 1.21% 0.00%
FittiingsLot1
Fire fighting Pipes & Fittings
8 6,200 RMT 5.00% 25-Jun-22 Jun-2022 6-Aug-22 Aug-2022 10-Sep-22 Sep-2022 1.50% 0.00% 2.00% 0.00% 1.50% 0.00%
Lot2
9 Gauge Hatch 50 No's 0.09% 7-Dec-22 Dec-2022 4-Jun-22 Jun-2022 0.03% 0.00% 0.00% 0.00% 0.03% 0.00%

10 Flame Arrestor 4 No's 0.04% 12-Jul-22 Jul-2022 12-Jul-22 Jul-2022 0.01% 0.00% 0.00% 0.00% 0.01% 0.00%

11 Aluminum IFRs 9 No's 2.90% 10-Nov-22 Nov-2022 23-Jun-23 Jun-2023 0.87% 0.00% 0.00% 0.00% 0.87% 0.00%

12 Jet Mixer 26 No's 0.55% 20-Aug-23 Aug-2023 18-Feb-24 Feb-2024 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

13 Oil Skimmer 4 No's 0.96% 1-Dec-23 Dec-2023 24-Sep-23 Sep-2023 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

14 Breather Valves 17 No's 0.59% 8-Jun-22 Jun-2022 15-Dec-22 Dec-2022 0.18% 0.00% 0.00% 0.00% 0.18% 0.00%

15 Emergency Vents 24 No's 0.11% 8-Jun-22 Jun-2022 20-Dec-23 Dec-2023 0.03% 0.00% 0.00% 0.00% 0.00% 0.00%

16 Insulation Material 13.94% 1-Jun-22 Jun-2022 4.18% 0.00% 0.00% 0.00% 0.00% 0.00%

Heating Coil & Tank


17 0.0049% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Appurtenances

F-219 Rev. 0 (Attachment 4)


20.00%

18.00%

16.00%

14.00%

12.00%

10.00%

8.00%

6.00%

4.00%

2.00%

0.00%
0.00%
Oct-21 Nov-21 Dec-21 Jan-22 Feb-22 Mar-22 Apr-22 May-22 Jun-22 Jul-22
May-22
Mar-22
Nov-21

Dec-21

Feb-22

Apr-22
Oct-21

Jan-22

Month % - Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Sub Ordering

Cum. Month Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Month % - Forecast
Sub Ordering
Cum. Month Forecast

Month % - Actual 0.14% 0.00% 0.00% 0.00% 0.00% 2.05% 17.54% 0.00%
Cum. Month Actual 0.14% 0.14% 0.14% 0.14% 0.14% 2.19% 19.73% 19.73%

Ready for Dispatch Month % - Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum. Month Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Month % - Forecast

Cum. Month Forecast

Month % - Actual 0.00% 0.10% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum. Month Actual 0.00% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%

Month % - Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum. Month Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Delivery

Month % - Forecast

Cum. Month Forecast

Month % - Actual 0.00% 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum. Month Actual 0.00% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%

Month % - Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Cum. Month Plan 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Month % - Forecast 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Total

Cum. Month Forecast 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
Month % - Actual 0.14% 0.17% 0.00% 0.00% 0.00% 2.05% 17.54% 0.00%
Cum. Month Actual 0.14% 0.31% 0.31% 0.31% 0.31% 2.36% 19.90% 19.90%

20.00%

16.00%

12.00%

8.00%
Monthly %

4.00%
12.00%

8.00%

Monthly %
4.00%

0.00%

-4.00%
Procurement S Curve

May-22 Jun-22 Jul-22 Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23

Month % - Plan Month % - Forecast Month % - Actual Cum. Month Plan Cum. Month Fo
May-23
Mar-23
Nov-22
Aug-22

Dec-22
Sep-22

Feb-23

Apr-23
Oct-22
Jun-22

Jun-23
Jan-23
Jul-22

Jul-23

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90%

PROCUREMENT S - CURVE (PLAN Vs FORECAST Vs ACTUAL)


urve

23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-2

Month Plan Cum. Month Forecast Cum. Month Actual


May-24
Mar-24
Nov-23
Aug-23

Aug-24
Dec-23
Sep-23

Feb-24

Feb-24

Apr-24
Oct-23

Jun-24
Jan-24

Jul-24

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73% 19.73%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90% 19.90%

ORECAST Vs ACTUAL)
120.00%

100.00%

80.00%
Cumulative %

60.00%

40.00%
80.00%

Cumulative %
60.00%

40.00%

20.00%

0.00%
120.00%

100.00%

80.00%

60.00%

40.00%

20.00%

0.00%

-20.00%
Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
Sep-24

Oct-24

0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
19.73% 19.73%

0.00% 0.00%
0.00% 0.00%

0.00% 0.00%
0.10% 0.10%

0.00% 0.00%
0.00% 0.00%

0.00% 0.00%
0.07% 0.07%

0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
0.00% 0.00%
19.90% 19.90%
Project Name

Progress Report - Executive Summary


Data Date 22-Mar-22
Overall Progress
Project Commencement Date 17-Sep-21

Project Completion Date 30-Mar-24


20.19%

Project Duration (in days) 926

Elapsed Duration (in days) 187


0.0% Fabrication
0.0% 0.00% 0.0% Erection
0.0% 0.00% 0.0% FF0.0%
Piping 0.00%
Remaining Duration (in days) 739
79.81%
Elapsed Duration (in %) 20.19%
Plan Actual Lag
Remaining Duration (in %) 79.81% Elapsed Duration (in %) 20.19% Remaining Duration (in %) 79.81%

Erection AST-I

10.53%
7.48%
0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00% 0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%0.00%
0.00%
31-TK-002

33-TK-001

31-TK-003

07-TK-001

35-TK-001

31-TK-004

34-TK-010

06-TK-301

08-TK-001

06-TK-302
47-TK-001 A

46-TK-001 A

44-TK-001 A

49-TK-001 A
47-TK-001 B

31-TK-001 B

46-TK-002 B

46-TK-001 B

44-TK-001 B

49-TK-001 B
31-TK-001 A

46-TK-002 A

8% 5% 8% 4% 8% 6% 8% 6% 8% 5% 8% 6% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8% 8%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

47-TK-001 A

49-TK-001 A
31-TK-002

33-TK-001

31-TK-003

07-TK-001

35-TK-001

31-TK-004

34-TK-010

06-TK-301

08-TK-001

06-TK-302
46-TK-001 A

44-TK-001 A
31-TK-001 B
47-TK-001 B

46-TK-002 B

46-TK-001 B

44-TK-001 B

49-TK-001 B
31-TK-001 A

46-TK-002 A
Fabrication
Plan Actual AST-I Plan Actual

Erection AST-II
100%
100%100% 100% 100% 100% 100% 100% 100%

12%
12%
3%3% 0%0% 3%3% 3%3% 0%0% 3%3% 3%3% 3%3% 0%0% 0%0% 0%0% 3%3% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0% 0%0%
62-TK-004 C
61-TK-001 A

60-TK-001 A

61-TK-004 A

62-TK-101 A

60-TK-101 A

62-TK-006 A

62-TK-001 A

62-TK-008 A

60-TK-002 A

62-TK-003 A

62-TK-002 A
61-TK-004 B

61-TK-002

48-TK-001

61-TK-003

43-TK-001
61-TK-001 B

60-TK-001 B

62-TK-101 B

60-TK-101 B

62-TK-006 B

62-TK-008 B

60-TK-002 B

62-TK-001 B

62-TK-003 B

62-TK-002 B
62-TK-004 A

0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

62-TK-004 C

61-TK-002

61-TK-003

43-TK-001
61-TK-001 A

60-TK-001 A

61-TK-004 A

62-TK-101 A

60-TK-101 A

62-TK-006 A

62-TK-001 A

62-TK-008 A

60-TK-002 A

62-TK-003 A

62-TK-002 A
48-TK-001
61-TK-001 B

60-TK-001 B

61-TK-004 B

62-TK-101 B

60-TK-101 B

62-TK-006 B

62-TK-008 B

60-TK-002 B

62-TK-001 B

62-TK-003 B

62-TK-002 B
62-TK-004 A
Fabrication
Plan AST-II
Actual
Plan Actual
AST-I Progress Planned Vs Actual AST-II Progress Planned Vs Actual
Work item Scope UOM Planned % Achieved Var. Today Plan Today Progress Varience Remarks Work item Scope UOM Planned % Actual Var. Today Plan Today Progress Varience Remarks

Annular Plates 7.0 0.00 0.00 Plate Cutiing MT 9.3% 0.00 0.00

Bottom Plates 2250.0 0.00 0.00 Plate Rolling MT 5.0% 0.00 0.00

Marking & Cutting of Roof Plates 0.00 0.00 0.00 0.00


Balsting and Priming SQM
Plates

Shell Course 10 0.00 0.00 Painting Intermediate SQM 0.00 0.00

Shell Course 9 0.00 0.00 Painting Final SQM 0.00 0.00

Shell Course 8 0.00 0.00 Structure Fabrication MT 0.00 0.00

Shell Course 7 0.00 0.00 Cooling Ring Fabrication Inch Dia 0.00 0.00

Shell Course 6 0.00 0.00 Cooling Ring Painting Inch Mtr 0.00 0.00

Shell Course 5 0.00 0.00 Plate Erection MT 0.00 0.00 Welding in Progress

Shell Course 4 0.00 0.00 Structure Erection MT 0.00 0.00 Welding in Progress

Shell Course 3 0.00 0.00 Cooling Ring Erection RMT 0.00 0.00

Shell Course 2

Shell Course 1

Curb Angle

Wind Girder

Roof Structure

Spiral Stairway with Handrail

Cooling Ring

Shell Manways

Roof Nozzles

Roof Manways

Tank Internal Piping

Bottom Sump

MVW/FOAM Ring Brackets

0.00 0.00

Today Progress Delay

#REF!

#REF!
#REF!
#REF!

#REF!
Highlights (AS TI & AS TII)
Sr. No. Activity UOM Scope Complete Balance

1 Foundation Handover Nos 50 50

2 Fabrication MT 13,400 13,400

3 Erection MT 13,400 13,400

4 Shell Course Erection Nos. 798 798

5 Welding MT 13,400 13,400

6 Blasting & Primer Sqm -

7 Final Painting Sqm - -

8 Mechanical Clearance Nos. 50 50

9 Water-Filling Nos 50 50

10 De-Watering Nos. 50 50

* Scope has been revised


Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
VN2154-101-A-ZZZ-9999
Project Document No.
Contractor Native
Change Vendor
Title Issue JGC or HDEC Equipment Item AWP 1st Submit Date File/s Submission Approval
Status/ Issue Vendor Doc. No. Reason Native Files not being available
PO No (350 Max) Purpose to Common No. (Y/N) Forecast Available
Remarks Category Purpose
(without "P" Type Code Seq No Full Document No Employer (Y/N)
("V")
X215XX-XXX-X)

V N2154-101-A DGN 0006 VN2154-101-A-DGN-0006 VENTING CALCULATION FOR NORMAL OPEN VENT (AST-II) IFI IFA JGC COMMON N 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0007 VN2154-101-A-DGN-0007 CALCULATION FOR PERIPHERAL AND CENTRE CIRCULATION VENT (AST-II) IFI IFA JGC COMMON N 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0008 VN2154-101-A-DGN-0008 VENTING CALCULATION FOR EMERGENCY RELIEF (AST-II) IFI IFA JGC COMMON N 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0009 VN2154-101-A-DGN-0009 VENTING CALCULATION FOR PRESSURE / VACUUM RELIEF VENT (AST-II) IFI IFA JGC COMMON N 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0010 VN2154-101-A-DGN-0010 CALCULATION FOR STEAM HEATING COIL SIZE (AST-II) IFI IFA JGC COMMON N 16-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 0037 VN2154-101-A-DGN-0037 STRENGTH CALCULATION FOR CLEANING OIL TANK ( 43-TK-001 ) IFI IFA JGC 43-TK-001 N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0038 VN2154-101-A-DGN-0038 STRENGTH CALCULATION FOR FLUSHING OIL TANK ( 48-TK-001 ) IFI IFA JGC 48-TK-001 N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0039 VN2154-101-A-DGN-0039 STRENGTH CALCULATION FOR ATMOSPHERIC RESIDUE STORAGE ( 60-TK-001 A/B ) IFI IFA JGC 60-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0040 VN2154-101-A-DGN-0040 STRENGTH CALCULATION FOR HPU FEED SR LIGHT NAPHTHA STORAGE ( 60-TK-002 A/B ) IFI IFA JGC 60-TK-002 A/B N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0041 VN2154-101-A-DGN-0041 STRENGTH CALCULATION FOR LGO-HDT FEED SR GASOIL STORAGE ( 60-TK-101 A/B ) IFI IFA JGC 60-TK-101 A/B N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0042 VN2154-101-A-DGN-0042 STRENGTH CALCULATION FOR VGO HDT FEED STORAGE ( 61-TK-001 A/B ) IFI IFA JGC 61-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0043 VN2154-101-A-DGN-0043 STRENGTH CALCULATION FOR HEAVY SLOP STORAGE ( 61-TK-002 ) IFI IFA JGC 61-TK-002 N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0044 VN2154-101-A-DGN-0044 STRENGTH CALCULATION FOR LIGHT SLOP STORAGE ( 61-TK-003 ) IFI IFA JGC 61-TK-003 N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0045 VN2154-101-A-DGN-0045 STRENGTH CALCULATION FOR VGO FCC FEED STORAGE ( 61-TK-004 A/B ) IFI IFA JGC 61-TK-004 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0046 VN2154-101-A-DGN-0046 STRENGTH CALCULATION FOR FCC GASOLINE TO EXISTING REFINERY STORAGE ( 62-TK-001 A/B ) IFI IFA JGC 62-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0047 VN2154-101-A-DGN-0047 STRENGTH CALCULATION FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE ( 62-TK-002 A/B ) IFI IFA JGC 62-TK-002 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0048 VN2154-101-A-DGN-0048 STRENGTH CALCULATION FOR HDT DIESEL TO EXISTING REFINERY STORAGE ( 62-TK-003 A/B ) IFI IFA JGC 62-TK-003 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0049 VN2154-101-A-DGN-0049 STRENGTH CALCULATION FOR FUEL OIL STORAGE ( 62-TK-004 A ) IFI IFA JGC 62-TK-004 A N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0050 VN2154-101-A-DGN-0050 STRENGTH CALCULATION FOR STRAIGHT RUN KEROSENE STORAGE ( 62-TK-006 A/B ) IFI IFA JGC 62-TK-006 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0051 VN2154-101-A-DGN-0051 STRENGTH CALCULATION FOR LOU GASOLINE STORAGE ( 62-TK-008 A/B ) IFI IFA JGC 62-TK-008 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0052 VN2154-101-A-DGN-0052 STRENGTH CALCULATION FOR DESULPHURIZES GASOIL STORAGE ( 62-TK-101 A/B ) IFI IFA JGC 62-TK-101 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0053 VN2154-101-A-DGN-0053 STRENGTH CALCULATION FOR FUEL OIL STORAGE ( 62-TK-004 C ) IFI IFA JGC 62-TK-004 C N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0074 VN2154-101-A-DGN-0074 ROOF STRUCTURE CALCULATION FOR CLEANING OIL TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 N 31-Mar-2022 Y
V N2154-101-A DGN 0075 VN2154-101-A-DGN-0075 ROOF STRUCTURE CALCULATION FOR FLUSHING OIL TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 N 31-Mar-2022 Y
Change V N2154-101-A DGN 0076 VN2154-101-A-DGN-0076 ROOF STRUCTURE CALCULATION FOR ATMOSPHERIC RESIDUE STORAGE TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0077 VN2154-101-A-DGN-0077 ROOF STRUCTURE CALCULATION FOR HPU FEED SR LIGHT NAPHTHA STORAGE TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B N 31-Mar-2022 Y
Change V N2154-101-A DGN 0078 VN2154-101-A-DGN-0078 ROOF STRUCTURE CALCULATION FOR LGO-HDT FEED SR GASOIL STORAGE TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0079 VN2154-101-A-DGN-0079 ROOF STRUCTURE CALCULATION FOR VGO HDT FEED STORAGE TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B N 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 0080 VN2154-101-A-DGN-0080 ROOF STRUCTURE CALCULATION FOR HEAVY SLOP STORAGE TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 N 31-Mar-2022 Y
V N2154-101-A DGN 0081 VN2154-101-A-DGN-0081 ROOF STRUCTURE CALCULATION FOR LIGHT SLOP STORAGE TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 N 31-Mar-2022 Y
Change V N2154-101-A DGN 0082 VN2154-101-A-DGN-0082 ROOF STRUCTURE CALCULATION FOR VGO FCC FEED STORAGE TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0083 VN2154-101-A-DGN-0083 ROOF STRUCTURE CALCULATION FOR FCC GASOLINE TO EXISTING REFINERY STORAGE TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0084 VN2154-101-A-DGN-0084 ROOF STRUCTURE CALCULATION FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0085 VN2154-101-A-DGN-0085 ROOF STRUCTURE CALCULATION FOR HDT DIESEL TO EXISTING REFINERY STORAGE TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0086 VN2154-101-A-DGN-0086 ROOF STRUCTURE CALCULATION FOR FUEL OIL STORAGE TANK ( 62-TK-004 A/C ) IFI IFR JGC 62-TK-004 A/C N 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 0087 VN2154-101-A-DGN-0087 ROOF STRUCTURE CALCULATION FOR STRAIGHT RUN KEROSENE STORAGE TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0088 VN2154-101-A-DGN-0088 ROOF STRUCTURE CALCULATION FOR LOU GASOLINE STORAGE TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B N 31-Mar-2022 Y
Change V N2154-101-A DGN 0089 VN2154-101-A-DGN-0089 ROOF STRUCTURE CALCULATION FOR DESULPHURIZES GASOIL STORAGE TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B N 31-Mar-2022 Y
V N2154-101-A DGN 0117 VN2154-101-A-DGN-0117 FOUNDATION LOAD DATA FOR CLEANING OIL TANK TANK ( 43-TK-001 ) IFI IFA JGC 43-TK-001 N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0118 VN2154-101-A-DGN-0118 FOUNDATION LOAD DATA FOR FLUSHING OIL TANK TANK ( 48-TK-001 ) IFI IFA JGC 48-TK-001 N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0119 VN2154-101-A-DGN-0119 FOUNDATION LOAD DATA FOR ATMOSPHERIC RESIDUE STORAGE ( 60-TK-001 A/B ) IFI IFA JGC 60-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0120 VN2154-101-A-DGN-0120 FOUNDATION LOAD DATA FOR HPU FEED SR LIGHT NAPHTHA STORAGE ( 60-TK-002 A/B ) IFI IFA JGC 60-TK-002 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0121 VN2154-101-A-DGN-0121 FOUNDATION LOAD DATA FOR LGO-HDT FEED SR GASOIL STORAGE ( 60-TK-101 A/B ) IFI IFA JGC 60-TK-101 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0122 VN2154-101-A-DGN-0122 FOUNDATION LOAD DATA FOR VGO HDT FEED STORAGE ( 61-TK-001 A/B ) IFI IFA JGC 61-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0123 VN2154-101-A-DGN-0123 FOUNDATION LOAD DATA FOR HEAVY SLOP STORAGE ( 61-TK-002 ) IFI IFA JGC 61-TK-002 N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0124 VN2154-101-A-DGN-0124 FOUNDATION LOAD DATA FOR LIGHT SLOP STORAGE ( 61-TK-003 ) IFI IFA JGC 61-TK-003 N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0125 VN2154-101-A-DGN-0125 FOUNDATION LOAD DATA FOR VGO FCC FEED STORAGE ( 61-TK-004 A/B ) IFI IFA JGC 61-TK-004 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0126 VN2154-101-A-DGN-0126 FOUNDATION LOAD DATA FOR FCC GASOLINE TO EXISTING REFINERY STORAGE ( 62-TK-001 A/B ) IFI IFA JGC 62-TK-001 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0127 VN2154-101-A-DGN-0127 FOUNDATION LOAD DATA FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE ( 62-TK-002 A/B ) IFI IFA JGC 62-TK-002 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0128 VN2154-101-A-DGN-0128 FOUNDATION LOAD DATA FOR HDT DIESEL TO EXISTING REFINERY STORAGE ( 62-TK-003 A/B ) IFI IFA JGC 62-TK-003 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0129 VN2154-101-A-DGN-0129 FOUNDATION LOAD DATA FOR FUEL OIL STORAGE ( 62-TK-004 A ) IFI IFA JGC 62-TK-004 A N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0130 VN2154-101-A-DGN-0130 FOUNDATION LOAD DATA FOR FOR STRAIGHT RUN KEROSENE STORAGE ( 62-TK-006 A/B ) IFI IFA JGC 62-TK-006 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0131 VN2154-101-A-DGN-0131 FOUNDATION LOAD DATA FOR LOU GASOLINE STORAGE ( 62-TK-008 A/B ) IFI IFA JGC 62-TK-008 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0132 VN2154-101-A-DGN-0132 FOUNDATION LOAD DATA FOR DESULPHURIZES GASOIL STORAGE ( 62-TK-101 A/B ) IFI IFA JGC 62-TK-101 A/B N 15-Oct-2021 Y SUBMITTED
Change V N2154-101-A DGN 0133 VN2154-101-A-DGN-0133 FOUNDATION LOAD DATA FOR FUEL OIL STORAGE ( 62-TK-004 C ) IFI IFA JGC 62-TK-004 C N 15-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 0141 VN2154-101-A-DGN-0141 MDS OF ALUMINUM IFR FOR HPU FEED SR LIGHT NAPHTHA STORAGE TANK ( 60-TK-002 A/B ) IFI IFA JGC 60-TK-002 A/B N 20-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 0142 VN2154-101-A-DGN-0142 MDS OF ALUMINUM IFR FOR LIGHT SLOP STORAGE TANK ( 61-TK-003 ) IFI IFA JGC 61-TK-003 N 20-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 0143 VN2154-101-A-DGN-0143 MDS OF ALUMINUM IFR FOR FCC GASOLINE TO EXISTING REFINERY STORAGE TANK ( 62-TK-001 A/B ) IFI IFA JGC 62-TK-001 A/B N 20-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 0144 VN2154-101-A-DGN-0144 MDS OF ALUMINUM IFR FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE TANK ( 62-TK-002 A/B ) IFI IFA JGC 62-TK-002 A/B N 20-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 0145 VN2154-101-A-DGN-0145 MDS OF ALUMINUM IFR FOR LOU GASOLINE STORAGE TANK ( 62-TK-008 A/B ) IFI IFA JGC 62-TK-008 A/B N 20-Dec-2021 Y SUBMITTED

V N2154-101-A DGN 1001 VN2154-101-A-DGN-1001 GENERAL ARRANGEMENT DRAWING FOR CLEANING OIL TANK ( 43-TK-001 ) IFR IFA JGC 43-TK-001 Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1002 VN2154-101-A-DGN-1002 NOZZLE ORIENTATION DETAILS FOR TANK ( 43-TK-001 ) IFR IFA JGC 43-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1003 VN2154-101-A-DGN-1003 SHELL PLATE LAYOUT FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1004 VN2154-101-A-DGN-1004 BOTTOM PLATE LAYOUT FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1005 VN2154-101-A-DGN-1005 ROOF PLATE LAYOUT FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1006 VN2154-101-A-DGN-1006 DETAIL OF SHELL NOZZLE FOR TANK ( 43-TK-001 ) SHT 01 OF 02 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1007 VN2154-101-A-DGN-1007 DETAIL OF SHELL NOZZLE FOR TANK ( 43-TK-001 ) SHT 02 OF 02 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1008 VN2154-101-A-DGN-1008 DETAIL OF DRAW-OFF SUMP FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1009 VN2154-101-A-DGN-1009 DETAIL OF SHELL MANWAY FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1010 VN2154-101-A-DGN-1010 DETAIL OF ROOF NOZZLE FOR TANK ( 43-TK-001 ) SHT 01 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1011 VN2154-101-A-DGN-1011 DETAIL OF ROOF NOZZLE FOR TANK ( 43-TK-001 ) SHT 02 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1012 VN2154-101-A-DGN-1012 DETAIL OF ROOF NOZZLE FOR TANK ( 43-TK-001 ) SHT 03 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
V N2154-101-A DGN 1013 VN2154-101-A-DGN-1013 DETAIL OF ROOF MANWAY FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Dec-2021 Y VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 1014 VN2154-101-A-DGN-1014 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 43-TK-001 ) SHT 01 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1015 VN2154-101-A-DGN-1015 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 43-TK-001 ) SHT 02 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1016 VN2154-101-A-DGN-1016 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 43-TK-001 ) SHT 03 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1017 VN2154-101-A-DGN-1017 DETAILS OF TOP PLATFORM FOR TANK ( 43-TK-001 ) SHT 01 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1018 VN2154-101-A-DGN-1018 DETAILS OF TOP PLATFORM FOR TANK ( 43-TK-001 ) SHT 02 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1019 VN2154-101-A-DGN-1019 DETAILS OF TOP PLATFORM FOR TANK ( 43-TK-001 ) SHT 03 OF 03 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1020 VN2154-101-A-DGN-1020 DETAIL OF ROOF HANDRAIL FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1021 VN2154-101-A-DGN-1021 DETAILS OF ROOF STRUCTURE FOR TANK ( 43-TK-001 ) SHT 01 OF 02 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1022 VN2154-101-A-DGN-1022 DETAILS OF ROOF STRUCTURE FOR TANK ( 43-TK-001 ) SHT 02 OF 02 IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1023 VN2154-101-A-DGN-1023 DETAIL OF HEATING COIL FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1024 VN2154-101-A-DGN-1024 DEATIL OF INSULATION FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1025 VN2154-101-A-DGN-1025 DETAIL OF FOAM SYSTEM FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1026 VN2154-101-A-DGN-1026 DETAIL OF COOLING SYSTEM FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1027 VN2154-101-A-DGN-1027 DETAIL OF NAME PLATE FOR TANK ( 43-TK-001 ) IFR IFR JGC 43-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1028 VN2154-101-A-DGN-1028 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 Y 31-Mar-2022 Y

V N2154-101-A DGN 1051 VN2154-101-A-DGN-1051 GENERAL ARRANGEMENT DRAWING FOR FLUSHING OIL TANK ( 48-TK-001 ) IFR IFA JGC 48-TK-001 Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1052 VN2154-101-A-DGN-1052 NOZZLE ORIENTATION DETAILS FOR TANK ( 48-TK-001 ) IFR IFA JGC 48-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1053 VN2154-101-A-DGN-1053 SHELL PLATE LAYOUT FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1054 VN2154-101-A-DGN-1054 BOTTOM PLATE LAYOUT FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1055 VN2154-101-A-DGN-1055 ROOF PLATE LAYOUT FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1056 VN2154-101-A-DGN-1056 DETAIL OF SHELL NOZZLE FOR TANK ( 48-TK-001 ) SHT 01 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1057 VN2154-101-A-DGN-1057 DETAIL OF SHELL NOZZLE FOR TANK ( 48-TK-001 ) SHT 02 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1058 VN2154-101-A-DGN-1058 DETAIL OF DRAW-OFF SUMP FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1059 VN2154-101-A-DGN-1059 DETAIL OF SHELL MANWAY FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1060 VN2154-101-A-DGN-1060 DETAIL OF ROOF NOZZLE FOR TANK ( 48-TK-001 ) SHT 01 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1061 VN2154-101-A-DGN-1061 DETAIL OF ROOF NOZZLE FOR TANK ( 48-TK-001 ) SHT 02 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1062 VN2154-101-A-DGN-1062 DETAIL OF ROOF NOZZLE FOR TANK ( 48-TK-001 ) SHT 03 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1063 VN2154-101-A-DGN-1063 DETAIL OF ROOF MANWAY FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Dec-2021 Y
V N2154-101-A DGN 1064 VN2154-101-A-DGN-1064 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 48-TK-001 ) SHT 01 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1065 VN2154-101-A-DGN-1065 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 48-TK-001 ) SHT 02 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1066 VN2154-101-A-DGN-1066 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 48-TK-001 ) SHT 03 OF 03 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1067 VN2154-101-A-DGN-1067 DETAILS OF TOP PLATFORM FOR TANK ( 48-TK-001 ) SHT 01 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1068 VN2154-101-A-DGN-1068 DETAILS OF TOP PLATFORM FOR TANK ( 48-TK-001 ) SHT 02 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1069 VN2154-101-A-DGN-1069 DETAIL OF ROOF HANDRAIL FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1070 VN2154-101-A-DGN-1070 DETAILS OF ROOF STRUCTURE FOR TANK ( 48-TK-001 ) SHT 01 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1071 VN2154-101-A-DGN-1071 DETAILS OF ROOF STRUCTURE FOR TANK ( 48-TK-001 ) SHT 02 OF 02 IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1072 VN2154-101-A-DGN-1072 DETAIL OF FOAM SYSTEM FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1073 VN2154-101-A-DGN-1073 DETAIL OF COOLING SYSTEM FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1074 VN2154-101-A-DGN-1074 DETAIL OF NAME PLATE FOR TANK ( 48-TK-001 ) IFR IFR JGC 48-TK-001 Y 31-Mar-2022 Y
V N2154-101-A DGN 1075 VN2154-101-A-DGN-1075 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 Y 31-Mar-2022 Y
SUBMITTED
V N2154-101-A DGN 1101 VN2154-101-A-DGN-1101 GENERAL ARRANGEMENT DRAWING FOR ATMOSPHERIC RESIDUE STORAGE ( 60-TK-001 A/B ) IFR IFA JGC 60-TK-001 A/B Y 22-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1102 VN2154-101-A-DGN-1102 NOZZLE ORIENTATION DETAILS FOR TANK ( 60-TK-001 A/B ) IFR IFA JGC 60-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1103 VN2154-101-A-DGN-1103 SHELL PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1104 VN2154-101-A-DGN-1104 SHELL PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1105 VN2154-101-A-DGN-1105 BOTTOM PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1106 VN2154-101-A-DGN-1106 ROOF PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1107 VN2154-101-A-DGN-1107 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1108 VN2154-101-A-DGN-1108 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1109 VN2154-101-A-DGN-1109 DETAIL OF DRAW-OFF SUMP FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 5-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1110 VN2154-101-A-DGN-1110 DETAIL OF SHELL MANWAY (24") FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1111 VN2154-101-A-DGN-1111 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1112 VN2154-101-A-DGN-1112 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1113 VN2154-101-A-DGN-1113 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1114 VN2154-101-A-DGN-1114 DETAIL OF ROOF MANWAY FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1115 VN2154-101-A-DGN-1115 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 05 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1116 VN2154-101-A-DGN-1116 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 05 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1117 VN2154-101-A-DGN-1117 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-001 A/B ) SHT 03 OF 05 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1118 VN2154-101-A-DGN-1118 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-001 A/B ) SHT 04 OF 05 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1119 VN2154-101-A-DGN-1119 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-001 A/B ) SHT 05 OF 05 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1120 VN2154-101-A-DGN-1120 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1121 VN2154-101-A-DGN-1121 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1122 VN2154-101-A-DGN-1122 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1123 VN2154-101-A-DGN-1123 DETAIL OF ROOF HANDRAIL FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1124 VN2154-101-A-DGN-1124 DETAIL OF CAGE LADDER FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1125 VN2154-101-A-DGN-1125 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1126 VN2154-101-A-DGN-1126 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1127 VN2154-101-A-DGN-1127 DETAIL OF HEATING COIL FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1128 VN2154-101-A-DGN-1128 DEATIL OF INSULATION FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1129 VN2154-101-A-DGN-1129 DETAIL OF FOAM SYSTEM FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1130 VN2154-101-A-DGN-1130 DETAIL OF COOLING SYSTEM FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1131 VN2154-101-A-DGN-1131 DETAIL OF NAME PLATE FOR TANK ( 60-TK-001 A/B ) IFR IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1132 VN2154-101-A-DGN-1132 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1133 VN2154-101-A-DGN-1133 DETAIL OF SHELL MANWAY (30") FOR TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1134 VN2154-101-A-DGN-1134 BOTTOM PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-001 A/B Y 5-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1135 VN2154-101-A-DGN-1135 ROOF PLATE LAYOUT FOR TANK ( 60-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-001 A/B Y 5-Jan-2022 Y SUBMITTED
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 1151 VN2154-101-A-DGN-1151 GENERAL ARRANGEMENT DRAWING FOR HPU FEED SR LIGHT NAPHTHA STORAGE TANK ( 60-TK-002 A/B ) IFR IFA JGC 60-TK-002 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1152 VN2154-101-A-DGN-1152 NOZZLE ORIENTATION DETAILS FOR TANK ( 60-TK-002 A/B ) IFR IFA JGC 60-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1153 VN2154-101-A-DGN-1153 SHELL PLATE LAYOUT FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1154 VN2154-101-A-DGN-1154 BOTTOM PLATE LAYOUT FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1155 VN2154-101-A-DGN-1155 ROOF PLATE LAYOUT FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1156 VN2154-101-A-DGN-1156 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1157 VN2154-101-A-DGN-1157 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1158 VN2154-101-A-DGN-1158 DETAIL OF DRAW-OFF SUMP FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1159 VN2154-101-A-DGN-1159 DETAIL OF SHELL MANWAY (24") FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1160 VN2154-101-A-DGN-1160 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-002 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1161 VN2154-101-A-DGN-1161 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-002 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1162 VN2154-101-A-DGN-1162 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-002 A/B ) SHT 03 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1163 VN2154-101-A-DGN-1163 DETAIL OF ROOF MANWAY FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Dec-2021 Y
V N2154-101-A DGN 1164 VN2154-101-A-DGN-1164 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-002 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1165 VN2154-101-A-DGN-1165 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-002 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1166 VN2154-101-A-DGN-1166 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-002 A/B ) SHT 03 OF 03 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1167 VN2154-101-A-DGN-1167 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1168 VN2154-101-A-DGN-1168 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1169 VN2154-101-A-DGN-1169 DETAIL OF ROOF HANDRAIL FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1170 VN2154-101-A-DGN-1170 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1171 VN2154-101-A-DGN-1171 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1172 VN2154-101-A-DGN-1172 DETAIL OF FOAM SYSTEM FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1173 VN2154-101-A-DGN-1173 DETAIL OF COOLING SYSTEM FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1174 VN2154-101-A-DGN-1174 DETAIL OF NAME PLATE FOR TANK ( 60-TK-002 A/B ) IFR IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1175 VN2154-101-A-DGN-1175 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1176 VN2154-101-A-DGN-1176 DETAIL OF SHELL MANWAY (30") FOR TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B Y 31-Mar-2022

V N2154-101-A DGN 1201 VN2154-101-A-DGN-1201 GENERAL ARRANGEMENT DRAWING FOR LGO-HDT FEED SR GASOIL STORAGE ( 60-TK-101 A/B ) IFR IFA JGC 60-TK-101 A/B Y 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1202 VN2154-101-A-DGN-1202 NOZZLE ORIENTATION DETAILS FOR TANK ( 60-TK-101 A/B ) IFR IFA JGC 60-TK-101 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1203 VN2154-101-A-DGN-1203 SHELL PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1204 VN2154-101-A-DGN-1204 SHELL PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1205 VN2154-101-A-DGN-1205 BOTTOM PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1206 VN2154-101-A-DGN-1206 BOTTOM PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1207 VN2154-101-A-DGN-1207 ROOF PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1208 VN2154-101-A-DGN-1208 ROOF PLATE LAYOUT FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1209 VN2154-101-A-DGN-1209 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1210 VN2154-101-A-DGN-1210 DETAIL OF SHELL NOZZLE FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1211 VN2154-101-A-DGN-1211 DETAIL OF DRAW-OFF SUMP FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1212 VN2154-101-A-DGN-1212 DETAIL OF SHELL MANWAY (24") FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1213 VN2154-101-A-DGN-1213 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1214 VN2154-101-A-DGN-1214 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1215 VN2154-101-A-DGN-1215 DETAIL OF ROOF NOZZLE FOR TANK ( 60-TK-101 A/B ) SHT 013OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1216 VN2154-101-A-DGN-1216 DETAIL OF ROOF MANWAY FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1217 VN2154-101-A-DGN-1217 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 05 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1218 VN2154-101-A-DGN-1218 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 05 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1219 VN2154-101-A-DGN-1219 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-101 A/B ) SHT 03 OF 05 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1220 VN2154-101-A-DGN-1220 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-101 A/B ) SHT 04 OF 05 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1221 VN2154-101-A-DGN-1221 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 60-TK-101 A/B ) SHT 05 OF 05 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1222 VN2154-101-A-DGN-1222 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1223 VN2154-101-A-DGN-1223 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1224 VN2154-101-A-DGN-1224 DETAILS OF TOP PLATFORM FOR TANK ( 60-TK-101 A/B ) SHT 03 OF 03 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1225 VN2154-101-A-DGN-1225 DETAIL OF ROOF HANDRAIL FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1226 VN2154-101-A-DGN-1226 DETAIL OF CAGE LADDER FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1227 VN2154-101-A-DGN-1227 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1228 VN2154-101-A-DGN-1228 DETAIL OF ROOF STRUCTURE FOR TANK ( 60-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1229 VN2154-101-A-DGN-1229 DETAIL OF FOAM SYSTEM FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1230 VN2154-101-A-DGN-1230 DETAIL OF COOLING SYSTEM FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1231 VN2154-101-A-DGN-1231 DETAIL OF NAME PLATE FOR TANK ( 60-TK-101 A/B ) IFR IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1232 VN2154-101-A-DGN-1232 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1233 VN2154-101-A-DGN-1233 DETAIL OF SHELL MANWAY (30") FOR TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1251 VN2154-101-A-DGN-1251 GENERAL ARRANGEMENT DRAWING FOR VGO HDT FEED STORAGE TANK ( 61-TK-001 A/B ) IFR IFA JGC 61-TK-001 A/B Y 22-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1252 VN2154-101-A-DGN-1252 NOZZLE ORIENTATION DETAILS FOR TANK ( 61-TK-001 A/B ) IFR IFA JGC 61-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1253 VN2154-101-A-DGN-1253 SHELL PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1254 VN2154-101-A-DGN-1254 SHELL PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1255 VN2154-101-A-DGN-1255 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1256 VN2154-101-A-DGN-1256 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1257 VN2154-101-A-DGN-1257 ROOF PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1258 VN2154-101-A-DGN-1258 ROOF PLATE LAYOUT FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1259 VN2154-101-A-DGN-1259 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1260 VN2154-101-A-DGN-1260 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1261 VN2154-101-A-DGN-1261 DETAIL OF DRAW-OFF SUMP FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 5-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1262 VN2154-101-A-DGN-1262 DETAIL OF SHELL MANWAY (24") FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1263 VN2154-101-A-DGN-1263 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1264 VN2154-101-A-DGN-1264 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1265 VN2154-101-A-DGN-1265 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1266 VN2154-101-A-DGN-1266 DETAIL OF ROOF MANWAY FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
V N2154-101-A DGN 1267 VN2154-101-A-DGN-1267 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 05 IFI IFR JGC 61-TK-001 A/B Y 31-Jan-2022 Y VN2154-101-A-ZZZ-9999
SUBMITTED
V N2154-101-A DGN 1268 VN2154-101-A-DGN-1268 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 05 IFI IFR JGC 61-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1269 VN2154-101-A-DGN-1269 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-001 A/B ) SHT 03 OF 05 IFI IFR JGC 61-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1270 VN2154-101-A-DGN-1270 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-001 A/B ) SHT 04 OF 05 IFI IFR JGC 61-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1271 VN2154-101-A-DGN-1271 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-001 A/B ) SHT 05 OF 05 IFI IFR JGC 61-TK-001 A/B Y 31-Jan-2022 Y SUBMITTED
Change V N2154-101-A DGN 1272 VN2154-101-A-DGN-1272 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1273 VN2154-101-A-DGN-1273 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1274 VN2154-101-A-DGN-1274 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1275 VN2154-101-A-DGN-1275 DETAIL OF ROOF HANDRAIL FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1276 VN2154-101-A-DGN-1276 DETAIL OF CAGE LADDER FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1277 VN2154-101-A-DGN-1277 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1278 VN2154-101-A-DGN-1278 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1279 VN2154-101-A-DGN-1279 DETAIL OF HEATING COIL FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1280 VN2154-101-A-DGN-1280 DEATIL OF INSULATION FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1281 VN2154-101-A-DGN-1281 DETAIL OF FOAM SYSTEM FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1282 VN2154-101-A-DGN-1282 DETAIL OF COOLING SYSTEM FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1283 VN2154-101-A-DGN-1283 DETAIL OF NAME PLATE FOR TANK ( 61-TK-001 A/B ) IFR IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1284 VN2154-101-A-DGN-1284 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1285 VN2154-101-A-DGN-1285 DETAIL OF SHELL MANWAY (30") FOR TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B Y 31-Dec-2021 Y SUBMITTED

V N2154-101-A DGN 1351 VN2154-101-A-DGN-1351 GENERAL ARRANGEMENT DRAWING FOR HEAVY SLOP STORAGE TANK ( 61-TK-002 ) IFR IFA JGC 61-TK-002 Y 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1352 VN2154-101-A-DGN-1352 NOZZLE ORIENTATION DETAILS FOR TANK ( 61-TK-002 ) IFR IFA JGC 61-TK-002 Y 31-Jan-2022 Y
V N2154-101-A DGN 1353 VN2154-101-A-DGN-1353 SHELL PLATE LAYOUT FOR TANK ( 61-TK-002 ) SHT 01 OF 02 IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1354 VN2154-101-A-DGN-1354 SHELL PLATE LAYOUT FOR TANK ( 61-TK-002 ) SHT 02 OF 02 IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1355 VN2154-101-A-DGN-1355 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1356 VN2154-101-A-DGN-1356 ROOF PLATE LAYOUT FOR TANK ( 61-TK-002 ) SHT 01 OF 02 IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1357 VN2154-101-A-DGN-1357 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-002 ) SHT 01 OF 02 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1358 VN2154-101-A-DGN-1358 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-002 ) SHT 02 OF 02 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1359 VN2154-101-A-DGN-1359 DETAIL OF DRAW-OFF SUMP FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1360 VN2154-101-A-DGN-1360 DETAIL OF SHELL MANWAY (24") FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1361 VN2154-101-A-DGN-1361 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-002 ) SHT 01 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1362 VN2154-101-A-DGN-1362 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-002 ) SHT 02 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1363 VN2154-101-A-DGN-1363 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-002 ) SHT 03 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1364 VN2154-101-A-DGN-1364 DETAIL OF ROOF MANWAY FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1365 VN2154-101-A-DGN-1365 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-002 ) SHT 01 OF 05 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1366 VN2154-101-A-DGN-1366 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-002 ) SHT 02 OF 05 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1367 VN2154-101-A-DGN-1367 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-002 ) SHT 03 OF 05 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1368 VN2154-101-A-DGN-1368 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-002 ) SHT 04 OF 05 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1369 VN2154-101-A-DGN-1369 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-002 ) SHT 05 OF 05 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1370 VN2154-101-A-DGN-1370 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-002 ) SHT 01 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1371 VN2154-101-A-DGN-1371 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-002 ) SHT 02 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1372 VN2154-101-A-DGN-1372 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-002 ) SHT 03 OF 03 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1373 VN2154-101-A-DGN-1373 DETAIL OF ROOF HANDRAIL FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1374 VN2154-101-A-DGN-1374 DETAIL OF CAGE LADDER FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1375 VN2154-101-A-DGN-1375 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-002 ) SHT 01 OF 02 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1376 VN2154-101-A-DGN-1376 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-002 ) SHT 02 OF 02 IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1377 VN2154-101-A-DGN-1377 DETAIL OF HEATING COIL FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1378 VN2154-101-A-DGN-1378 DEATIL OF INSULATION FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1379 VN2154-101-A-DGN-1379 DETAIL OF FOAM SYSTEM FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1380 VN2154-101-A-DGN-1380 DETAIL OF COOLING SYSTEM FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1381 VN2154-101-A-DGN-1381 DETAIL OF NAME PLATE FOR TANK ( 61-TK-002 ) IFR IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1382 VN2154-101-A-DGN-1382 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Mar-2022 Y
V N2154-101-A DGN 1383 VN2154-101-A-DGN-1383 DETAIL OF SHELL MANWAY (30") FOR TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 Y 31-Dec-2021 Y
V N2154-101-A DGN 1384 VN2154-101-A-DGN-1384 ROOF PLATE LAYOUT FOR TANK ( 61-TK-002 ) SHT 02 OF 02 IFI IFR JGC 61-TK-002 Y 11-Jan-2022 Y SUBMITTED

V N2154-101-A DGN 1401 VN2154-101-A-DGN-1401 GENERAL ARRANGEMENT DRAWING FOR LIGHT SLOP STORAGE TANK ( 61-TK-003 ) IFR IFA JGC 61-TK-003 Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1402 VN2154-101-A-DGN-1402 NOZZLE ORIENTATION DETAILS FOR TANK ( 61-TK-003 ) IFR IFA JGC 61-TK-003 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1403 VN2154-101-A-DGN-1403 SHELL PLATE LAYOUT FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1404 VN2154-101-A-DGN-1404 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1405 VN2154-101-A-DGN-1405 ROOF PLATE LAYOUT FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1406 VN2154-101-A-DGN-1406 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-003 ) SHT 01 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1407 VN2154-101-A-DGN-1407 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-003 ) SHT 02 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1408 VN2154-101-A-DGN-1408 DETAIL OF DRAW-OFF SUMP FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1409 VN2154-101-A-DGN-1409 DETAIL OF SHELL MANWAY (24") FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1410 VN2154-101-A-DGN-1410 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-003 ) SHT 01 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1411 VN2154-101-A-DGN-1411 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-003 ) SHT 02 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1412 VN2154-101-A-DGN-1412 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-003 ) SHT 03 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1413 VN2154-101-A-DGN-1413 DETAIL OF ROOF MANWAY FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Dec-2021 Y
V N2154-101-A DGN 1414 VN2154-101-A-DGN-1414 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-003 ) SHT 01 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1415 VN2154-101-A-DGN-1415 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-003 ) SHT 02 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1416 VN2154-101-A-DGN-1416 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-003 ) SHT 03 OF 03 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1417 VN2154-101-A-DGN-1417 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-003 ) SHT 01 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1418 VN2154-101-A-DGN-1418 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-003 ) SHT 02 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1419 VN2154-101-A-DGN-1419 DETAIL OF ROOF HANDRAIL FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1420 VN2154-101-A-DGN-1420 DETAIL OF CAGE LADDER FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1421 VN2154-101-A-DGN-1421 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-003 ) SHT 01 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1422 VN2154-101-A-DGN-1422 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-003 ) SHT 02 OF 02 IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1423 VN2154-101-A-DGN-1423 DETAIL OF FOAM SYSTEM FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
V N2154-101-A DGN 1424 VN2154-101-A-DGN-1424 DETAIL OF COOLING SYSTEM FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 1425 VN2154-101-A-DGN-1425 DETAIL OF NAME PLATE FOR TANK ( 61-TK-003 ) IFR IFR JGC 61-TK-003 Y 31-Mar-2022 Y
V N2154-101-A DGN 1426 VN2154-101-A-DGN-1426 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1427 VN2154-101-A-DGN-1427 DETAIL OF SHELL MANWAY (30") FOR TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 Y 31-Mar-2022 Y

V N2154-101-A DGN 1451 VN2154-101-A-DGN-1451 GENERAL ARRANGEMENT DRAWING FOR VGO FCC FEED STORAGE TANK ( 61-TK-004 A/B ) IFR IFA JGC 61-TK-004 A/B Y 22-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1452 VN2154-101-A-DGN-1452 NOZZLE ORIENTATION DETAILS FOR TANK ( 61-TK-004 A/B ) IFR IFA JGC 61-TK-004 A/B Y 31-Jan-2022 Y
V N2154-101-A DGN 1453 VN2154-101-A-DGN-1453 SHELL PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1454 VN2154-101-A-DGN-1454 SHELL PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1455 VN2154-101-A-DGN-1455 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1456 VN2154-101-A-DGN-1456 BOTTOM PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1457 VN2154-101-A-DGN-1457 ROOF PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1458 VN2154-101-A-DGN-1458 ROOF PLATE LAYOUT FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1459 VN2154-101-A-DGN-1459 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Jan-2022 Y
V N2154-101-A DGN 1460 VN2154-101-A-DGN-1460 DETAIL OF SHELL NOZZLE FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Jan-2022 Y
V N2154-101-A DGN 1461 VN2154-101-A-DGN-1461 DETAIL OF DRAW-OFF SUMP FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 5-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1462 VN2154-101-A-DGN-1462 DETAIL OF SHELL MANWAY (24") FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1463 VN2154-101-A-DGN-1463 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1464 VN2154-101-A-DGN-1464 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1465 VN2154-101-A-DGN-1465 DETAIL OF ROOF NOZZLE FOR TANK ( 61-TK-004 A/B ) SHT 03 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1466 VN2154-101-A-DGN-1466 DETAIL OF ROOF MANWAY FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1467 VN2154-101-A-DGN-1467 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 05 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1468 VN2154-101-A-DGN-1468 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 05 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1469 VN2154-101-A-DGN-1469 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-004 A/B ) SHT 03 OF 05 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1470 VN2154-101-A-DGN-1470 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-004 A/B ) SHT 04 OF 05 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1471 VN2154-101-A-DGN-1471 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 61-TK-004 A/B ) SHT 05 OF 05 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1472 VN2154-101-A-DGN-1472 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1473 VN2154-101-A-DGN-1473 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1474 VN2154-101-A-DGN-1474 DETAILS OF TOP PLATFORM FOR TANK ( 61-TK-004 A/B ) SHT 03 OF 03 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1475 VN2154-101-A-DGN-1475 DETAIL OF ROOF HANDRAIL FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1476 VN2154-101-A-DGN-1476 DETAIL OF CAGE LADDER FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1477 VN2154-101-A-DGN-1477 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-004 A/B ) SHT 01 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1478 VN2154-101-A-DGN-1478 DETAIL OF ROOF STRUCTURE FOR TANK ( 61-TK-004 A/B ) SHT 02 OF 02 IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1479 VN2154-101-A-DGN-1479 DETAIL OF HEATING COIL FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1480 VN2154-101-A-DGN-1480 DEATIL OF INSULATION FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1481 VN2154-101-A-DGN-1481 DETAIL OF FOAM SYSTEM FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1482 VN2154-101-A-DGN-1482 DETAIL OF COOLING SYSTEM FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1483 VN2154-101-A-DGN-1483 DETAIL OF NAME PLATE FOR TANK ( 61-TK-004 A/B ) IFR IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1484 VN2154-101-A-DGN-1484 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1485 VN2154-101-A-DGN-1485 DETAIL OF SHELL MANWAY (30") FOR TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B Y 31-Dec-2021 Y

V N2154-101-A DGN 1501 VN2154-101-A-DGN-1501 GENERAL ARRANGEMENT DRAWING FOR FCC GASOLINE TO EXISTING REFINERY STORAGE TANK ( 62-TK-001 A/B ) IFR IFA JGC 62-TK-001 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1502 VN2154-101-A-DGN-1502 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-001 A/B ) IFR IFA JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1503 VN2154-101-A-DGN-1503 SHELL PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1504 VN2154-101-A-DGN-1504 SHELL PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1505 VN2154-101-A-DGN-1505 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1506 VN2154-101-A-DGN-1506 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1507 VN2154-101-A-DGN-1507 ROOF PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1508 VN2154-101-A-DGN-1508 ROOF PLATE LAYOUT FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1509 VN2154-101-A-DGN-1509 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1510 VN2154-101-A-DGN-1510 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1511 VN2154-101-A-DGN-1511 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1512 VN2154-101-A-DGN-1512 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1513 VN2154-101-A-DGN-1513 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1514 VN2154-101-A-DGN-1514 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1515 VN2154-101-A-DGN-1515 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1516 VN2154-101-A-DGN-1516 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1517 VN2154-101-A-DGN-1517 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1518 VN2154-101-A-DGN-1518 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1519 VN2154-101-A-DGN-1519 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-001 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1520 VN2154-101-A-DGN-1520 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-001 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1521 VN2154-101-A-DGN-1521 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-001 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1522 VN2154-101-A-DGN-1522 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1523 VN2154-101-A-DGN-1523 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1524 VN2154-101-A-DGN-1524 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-001 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1525 VN2154-101-A-DGN-1525 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1526 VN2154-101-A-DGN-1526 DETAIL OF CAGE LADDER FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1527 VN2154-101-A-DGN-1527 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-001 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1528 VN2154-101-A-DGN-1528 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-001 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1529 VN2154-101-A-DGN-1529 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1530 VN2154-101-A-DGN-1530 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1531 VN2154-101-A-DGN-1531 DETAIL OF NAME PLATE FOR TANK ( 62-TK-001 A/B ) IFR IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1532 VN2154-101-A-DGN-1532 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1533 VN2154-101-A-DGN-1533 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1551 VN2154-101-A-DGN-1551 GENERAL ARRANGEMENT DRAWING FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE TANK ( 62-TK-002 A/B ) IFR IFA JGC 62-TK-002 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1552 VN2154-101-A-DGN-1552 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-002 A/B ) IFR IFA JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1553 VN2154-101-A-DGN-1553 SHELL PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1554 VN2154-101-A-DGN-1554 SHELL PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 1555 VN2154-101-A-DGN-1555 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 1556 VN2154-101-A-DGN-1556 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1557 VN2154-101-A-DGN-1557 ROOF PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1558 VN2154-101-A-DGN-1558 ROOF PLATE LAYOUT FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1559 VN2154-101-A-DGN-1559 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1560 VN2154-101-A-DGN-1560 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1561 VN2154-101-A-DGN-1561 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y SUBMITTED
Change V N2154-101-A DGN 1562 VN2154-101-A-DGN-1562 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1563 VN2154-101-A-DGN-1563 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1564 VN2154-101-A-DGN-1564 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1565 VN2154-101-A-DGN-1565 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-002 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1566 VN2154-101-A-DGN-1566 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Dec-2021 Y
V N2154-101-A DGN 1567 VN2154-101-A-DGN-1567 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1568 VN2154-101-A-DGN-1568 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1569 VN2154-101-A-DGN-1569 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-002 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1570 VN2154-101-A-DGN-1570 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-002 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1571 VN2154-101-A-DGN-1571 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-002 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1572 VN2154-101-A-DGN-1572 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1573 VN2154-101-A-DGN-1573 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1574 VN2154-101-A-DGN-1574 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-002 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1575 VN2154-101-A-DGN-1575 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1576 VN2154-101-A-DGN-1576 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-002 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1577 VN2154-101-A-DGN-1577 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-002 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1578 VN2154-101-A-DGN-1578 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1579 VN2154-101-A-DGN-1579 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1580 VN2154-101-A-DGN-1580 DETAIL OF NAME PLATE FOR TANK ( 62-TK-002 A/B ) IFR IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1581 VN2154-101-A-DGN-1581 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1582 VN2154-101-A-DGN-1582 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1601 VN2154-101-A-DGN-1601 GENERAL ARRANGEMENT DRAWING FOR HDT DIESEL TO EXISTING REFINERY STORAGE TANK ( 62-TK-003 A/B ) IFR IFA JGC 62-TK-003 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1602 VN2154-101-A-DGN-1602 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-003 A/B ) IFR IFA JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1603 VN2154-101-A-DGN-1603 SHELL PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1604 VN2154-101-A-DGN-1604 SHELL PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1605 VN2154-101-A-DGN-1605 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1606 VN2154-101-A-DGN-1606 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1607 VN2154-101-A-DGN-1607 ROOF PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1608 VN2154-101-A-DGN-1608 ROOF PLATE LAYOUT FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1609 VN2154-101-A-DGN-1609 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1610 VN2154-101-A-DGN-1610 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1611 VN2154-101-A-DGN-1611 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1612 VN2154-101-A-DGN-1612 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1613 VN2154-101-A-DGN-1613 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1614 VN2154-101-A-DGN-1614 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1615 VN2154-101-A-DGN-1615 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-003 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1616 VN2154-101-A-DGN-1616 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Dec-2021 Y
V N2154-101-A DGN 1617 VN2154-101-A-DGN-1617 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1618 VN2154-101-A-DGN-1618 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1619 VN2154-101-A-DGN-1619 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-003 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1620 VN2154-101-A-DGN-1620 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-003 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1621 VN2154-101-A-DGN-1621 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-003 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1622 VN2154-101-A-DGN-1622 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1623 VN2154-101-A-DGN-1623 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1624 VN2154-101-A-DGN-1624 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-003 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1625 VN2154-101-A-DGN-1625 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1626 VN2154-101-A-DGN-1626 DETAIL OF CAGE LADDER FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1627 VN2154-101-A-DGN-1627 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-003 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1628 VN2154-101-A-DGN-1628 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-003 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1629 VN2154-101-A-DGN-1629 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1630 VN2154-101-A-DGN-1630 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1631 VN2154-101-A-DGN-1631 DETAIL OF NAME PLATE FOR TANK ( 62-TK-003 A/B ) IFR IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1632 VN2154-101-A-DGN-1632 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1633 VN2154-101-A-DGN-1633 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1651 VN2154-101-A-DGN-1651 GENERAL ARRANGEMENT DRAWING FOR FUEL OIL STORAGE TANK ( 62-TK-004 A ) IFR IFA JGC 62-TK-004 A/C Y 22-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1652 VN2154-101-A-DGN-1652 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-004 A ) IFR IFA JGC 62-TK-004 A/C Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1653 VN2154-101-A-DGN-1653 SHELL PLATE LAYOUT FOR TANK ( 62-TK-004 A ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1654 VN2154-101-A-DGN-1654 SHELL PLATE LAYOUT FOR TANK ( 62-TK-004 A ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1655 VN2154-101-A-DGN-1655 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1656 VN2154-101-A-DGN-1656 ROOF PLATE LAYOUT FOR TANK ( 62-TK-004 A ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1657 VN2154-101-A-DGN-1657 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-004 A ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1658 VN2154-101-A-DGN-1658 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-004 A ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1659 VN2154-101-A-DGN-1659 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 5-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1660 VN2154-101-A-DGN-1660 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1661 VN2154-101-A-DGN-1661 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 A ) SHT 01 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1662 VN2154-101-A-DGN-1662 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 A ) SHT 02 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1663 VN2154-101-A-DGN-1663 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 A ) SHT 03 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1664 VN2154-101-A-DGN-1664 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1665 VN2154-101-A-DGN-1665 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 A ) SHT 01 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 1666 VN2154-101-A-DGN-1666 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 A ) SHT 02 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 1667 VN2154-101-A-DGN-1667 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 A ) SHT 03 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1668 VN2154-101-A-DGN-1668 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 A ) SHT 04 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1669 VN2154-101-A-DGN-1669 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 A ) SHT 05 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1670 VN2154-101-A-DGN-1670 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 A ) SHT 01 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1671 VN2154-101-A-DGN-1671 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 A ) SHT 02 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1672 VN2154-101-A-DGN-1672 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 A ) SHT 03 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1673 VN2154-101-A-DGN-1673 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1674 VN2154-101-A-DGN-1674 DETAIL OF CAGE LADDER FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1675 VN2154-101-A-DGN-1675 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-004 A ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1676 VN2154-101-A-DGN-1676 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-004 A ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1677 VN2154-101-A-DGN-1677 DETAIL OF HEATING COIL FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1678 VN2154-101-A-DGN-1678 DEATIL OF INSULATION FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1679 VN2154-101-A-DGN-1679 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1680 VN2154-101-A-DGN-1680 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1681 VN2154-101-A-DGN-1681 DETAIL OF NAME PLATE FOR TANK ( 62-TK-004 A ) IFR IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1682 VN2154-101-A-DGN-1682 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1683 VN2154-101-A-DGN-1683 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-004 A ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y
V N2154-101-A DGN 1684 VN2154-101-A-DGN-1684 ROOF PLATE LAYOUT FOR TANK ( 62-TK-004 A ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 11-Jan-2022 Y SUBMITTED

V N2154-101-A DGN 1701 VN2154-101-A-DGN-1701 GENERAL ARRANGEMENT DRAWING FOR FUEL OIL STORAGE TANK ( 62-TK-004 C ) IFR IFA JGC 62-TK-004 A/C Y 22-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1702 VN2154-101-A-DGN-1702 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-004 C ) IFR IFA JGC 62-TK-004 A/C Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1703 VN2154-101-A-DGN-1703 SHELL PLATE LAYOUT FOR TANK ( 62-TK-004 C ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1704 VN2154-101-A-DGN-1704 SHELL PLATE LAYOUT FOR TANK ( 62-TK-004 C ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1705 VN2154-101-A-DGN-1705 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1706 VN2154-101-A-DGN-1706 ROOF PLATE LAYOUT FOR TANK ( 62-TK-004 C ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1707 VN2154-101-A-DGN-1707 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-004 C ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1708 VN2154-101-A-DGN-1708 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-004 C ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1709 VN2154-101-A-DGN-1709 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 5-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1710 VN2154-101-A-DGN-1710 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1711 VN2154-101-A-DGN-1711 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 C ) SHT 01 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1712 VN2154-101-A-DGN-1712 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 C ) SHT 02 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1713 VN2154-101-A-DGN-1713 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-004 C ) SHT 03 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1714 VN2154-101-A-DGN-1714 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1715 VN2154-101-A-DGN-1715 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 C ) SHT 01 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1716 VN2154-101-A-DGN-1716 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 C ) SHT 02 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1717 VN2154-101-A-DGN-1717 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 C ) SHT 03 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1718 VN2154-101-A-DGN-1718 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 C ) SHT 04 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1719 VN2154-101-A-DGN-1719 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-004 C ) SHT 05 OF 05 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1720 VN2154-101-A-DGN-1720 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 C ) SHT 01 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1721 VN2154-101-A-DGN-1721 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 C ) SHT 02 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1722 VN2154-101-A-DGN-1722 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-004 C ) SHT 03 OF 03 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1723 VN2154-101-A-DGN-1723 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1724 VN2154-101-A-DGN-1724 DETAIL OF CAGE LADDER FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1725 VN2154-101-A-DGN-1725 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-004 C ) SHT 01 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1726 VN2154-101-A-DGN-1726 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-004 C ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1727 VN2154-101-A-DGN-1727 DETAIL OF HEATING COIL FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1728 VN2154-101-A-DGN-1728 DEATIL OF INSULATION FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1729 VN2154-101-A-DGN-1729 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1730 VN2154-101-A-DGN-1730 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1731 VN2154-101-A-DGN-1731 DETAIL OF NAME PLATE FOR TANK ( 62-TK-004 C ) IFR IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1732 VN2154-101-A-DGN-1732 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Mar-2022 Y
V N2154-101-A DGN 1733 VN2154-101-A-DGN-1733 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-004 C ) IFI IFR JGC 62-TK-004 A/C Y 31-Dec-2021 Y
V N2154-101-A DGN 1734 VN2154-101-A-DGN-1734 ROOF PLATE LAYOUT FOR TANK ( 62-TK-004 C ) SHT 02 OF 02 IFI IFR JGC 62-TK-004 A/C Y 11-Jan-2022 Y SUBMITTED

V N2154-101-A DGN 1751 VN2154-101-A-DGN-1751 GENERAL ARRANGEMENT DRAWING FOR STRAIGHT RUN KEROSENE STORAGE TANK ( 62-TK-006 A/B ) IFR IFA JGC 62-TK-006 A/B Y 12-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1752 VN2154-101-A-DGN-1752 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-006 A/B ) IFR IFA JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1753 VN2154-101-A-DGN-1753 SHELL PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1754 VN2154-101-A-DGN-1754 SHELL PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1755 VN2154-101-A-DGN-1755 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1756 VN2154-101-A-DGN-1756 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1757 VN2154-101-A-DGN-1757 ROOF PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1758 VN2154-101-A-DGN-1758 ROOF PLATE LAYOUT FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1759 VN2154-101-A-DGN-1759 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1760 VN2154-101-A-DGN-1760 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1761 VN2154-101-A-DGN-1761 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 19-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1762 VN2154-101-A-DGN-1762 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1763 VN2154-101-A-DGN-1763 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1764 VN2154-101-A-DGN-1764 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1765 VN2154-101-A-DGN-1765 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-006 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1766 VN2154-101-A-DGN-1766 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1767 VN2154-101-A-DGN-1767 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1768 VN2154-101-A-DGN-1768 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1769 VN2154-101-A-DGN-1769 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-006 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1770 VN2154-101-A-DGN-1770 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-006 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1771 VN2154-101-A-DGN-1771 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-006 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1772 VN2154-101-A-DGN-1772 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1773 VN2154-101-A-DGN-1773 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
Change V N2154-101-A DGN 1774 VN2154-101-A-DGN-1774 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-006 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y VN2154-101-A-ZZZ-9999
Change V N2154-101-A DGN 1775 VN2154-101-A-DGN-1775 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1776 VN2154-101-A-DGN-1776 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-006 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1777 VN2154-101-A-DGN-1777 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-006 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1778 VN2154-101-A-DGN-1778 DETAIL OF FOAM SYSTEMFOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1779 VN2154-101-A-DGN-1779 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1780 VN2154-101-A-DGN-1780 DETAIL OF NAME PLATE FOR TANK ( 62-TK-006 A/B ) IFR IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1781 VN2154-101-A-DGN-1781 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1782 VN2154-101-A-DGN-1782 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1801 VN2154-101-A-DGN-1801 GENERAL ARRANGEMENT DRAWING FOR LOU GASOLINE STORAGE TANK ( 62-TK-008 A/B ) IFR IFA JGC 62-TK-008 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1802 VN2154-101-A-DGN-1802 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-008 A/B ) IFR IFA JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1803 VN2154-101-A-DGN-1803 SHELL PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1804 VN2154-101-A-DGN-1804 SHELL PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1805 VN2154-101-A-DGN-1805 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1806 VN2154-101-A-DGN-1806 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1807 VN2154-101-A-DGN-1807 ROOF PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1808 VN2154-101-A-DGN-1808 ROOF PLATE LAYOUT FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1809 VN2154-101-A-DGN-1809 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1810 VN2154-101-A-DGN-1810 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1811 VN2154-101-A-DGN-1811 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 19-Nov-2021 Y SUBMITTED
Change V N2154-101-A DGN 1812 VN2154-101-A-DGN-1812 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1813 VN2154-101-A-DGN-1813 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1814 VN2154-101-A-DGN-1814 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1815 VN2154-101-A-DGN-1815 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-008 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1816 VN2154-101-A-DGN-1816 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1817 VN2154-101-A-DGN-1817 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1818 VN2154-101-A-DGN-1818 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1819 VN2154-101-A-DGN-1819 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-008 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1820 VN2154-101-A-DGN-1820 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-008 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1821 VN2154-101-A-DGN-1821 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-008 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1822 VN2154-101-A-DGN-1822 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1823 VN2154-101-A-DGN-1823 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1824 VN2154-101-A-DGN-1824 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-008 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1825 VN2154-101-A-DGN-1825 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1826 VN2154-101-A-DGN-1826 DETAILS OF ROOF STRUCTURE FOR TANK ( 62-TK-008 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1827 VN2154-101-A-DGN-1827 DETAILS OF ROOF STRUCTURE FOR TANK ( 62-TK-008 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1828 VN2154-101-A-DGN-1828 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1829 VN2154-101-A-DGN-1829 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1830 VN2154-101-A-DGN-1830 DETAIL OF NAME PLATE FOR TANK ( 62-TK-008 A/B ) IFR IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1831 VN2154-101-A-DGN-1831 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1832 VN2154-101-A-DGN-1832 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 1851 VN2154-101-A-DGN-1851 GENERAL ARRANGEMENT DRAWING FOR DESULPHURIZES GASOIL STORAGE TANK ( 62-TK-101 A/B ) IFR IFA JGC 62-TK-101 A/B Y 29-Oct-2021 Y SUBMITTED
V N2154-101-A DGN 1852 VN2154-101-A-DGN-1852 NOZZLE ORIENTATION DETAILS FOR TANK ( 62-TK-101 A/B ) IFR IFA JGC 62-TK-101 A/B Y 31-Jan-2022 Y SUBMITTED
V N2154-101-A DGN 1853 VN2154-101-A-DGN-1853 SHELL PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1854 VN2154-101-A-DGN-1854 SHELL PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1855 VN2154-101-A-DGN-1855 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1856 VN2154-101-A-DGN-1856 BOTTOM PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1857 VN2154-101-A-DGN-1857 ROOF PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 1858 VN2154-101-A-DGN-1858 ROOF PLATE LAYOUT FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1859 VN2154-101-A-DGN-1859 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1860 VN2154-101-A-DGN-1860 DETAIL OF SHELL NOZZLE FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1861 VN2154-101-A-DGN-1861 DETAIL OF DRAW-OFF SUMP FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 12-Nov-2021 Y SUBMITTED
V N2154-101-A DGN 1862 VN2154-101-A-DGN-1862 DETAIL OF SHELL MANWAY (24") FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1863 VN2154-101-A-DGN-1863 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1864 VN2154-101-A-DGN-1864 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1865 VN2154-101-A-DGN-1865 DETAIL OF ROOF NOZZLE FOR TANK ( 62-TK-101 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1866 VN2154-101-A-DGN-1866 DETAIL OF ROOF MANWAY FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 1867 VN2154-101-A-DGN-1867 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 05 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1868 VN2154-101-A-DGN-1868 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 05 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1869 VN2154-101-A-DGN-1869 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-101 A/B ) SHT 03 OF 05 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1870 VN2154-101-A-DGN-1870 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-101 A/B ) SHT 04 OF 05 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1871 VN2154-101-A-DGN-1871 DETAIL OF SPIRAL STAIRWAY FOR TANK ( 62-TK-101 A/B ) SHT 05 OF 05 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1872 VN2154-101-A-DGN-1872 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1873 VN2154-101-A-DGN-1873 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1874 VN2154-101-A-DGN-1874 DETAILS OF TOP PLATFORM FOR TANK ( 62-TK-101 A/B ) SHT 03 OF 03 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1875 VN2154-101-A-DGN-1875 DETAIL OF ROOF HANDRAIL FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1876 VN2154-101-A-DGN-1876 DETAIL OF CAGE LADDER FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1877 VN2154-101-A-DGN-1877 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-101 A/B ) SHT 01 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1878 VN2154-101-A-DGN-1878 DETAIL OF ROOF STRUCTURE FOR TANK ( 62-TK-101 A/B ) SHT 02 OF 02 IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1879 VN2154-101-A-DGN-1879 DETAIL OF FOAM SYSTEM FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1880 VN2154-101-A-DGN-1880 DETAIL OF COOLING SYSTEM FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1881 VN2154-101-A-DGN-1881 DETAIL OF NAME PLATE FOR TANK ( 62-TK-101 A/B ) IFR IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
V N2154-101-A DGN 1882 VN2154-101-A-DGN-1882 DETAIL OF PIPE SUPPORT CLIP FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y
Change V N2154-101-A DGN 1883 VN2154-101-A-DGN-1883 DETAIL OF SHELL MANWAY (30") FOR TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B Y 31-Mar-2022 Y

V N2154-101-A DGN 2001 VN2154-101-A-DGN-2001 HYDRAULIC CALCULATION FOR CLEANING OIL TANK ( 43-TK-001 ) IFI IFR JGC 43-TK-001 N 31-Dec-2021 Y
Basrah refinery Upgrading Project
VENDOR DOCUMENT REGISTER FOR ATMOSPHERIC STORAGE TANKS (II)__RN2154-101
Project Doc. No.:
V N2154-101-A DGN 2002 VN2154-101-A-DGN-2002 HYDRAULIC CALCULATION FOR FLUSHING OIL TANK ( 48-TK-001 ) IFI IFR JGC 48-TK-001 N 31-Dec-2021 Y VN2154-101-A-ZZZ-9999
V N2154-101-A DGN 2003 VN2154-101-A-DGN-2003 HYDRAULIC CALCULATION FOR ATMOSPHERIC RESIDUE STORAGE TANK ( 60-TK-001 A/B ) IFI IFR JGC 60-TK-001 A/B N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2004 VN2154-101-A-DGN-2004 HYDRAULIC CALCULATION FOR HPU FEED SR LIGHT NAPHTHA STORAGE TANK ( 60-TK-002 A/B ) IFI IFR JGC 60-TK-002 A/B N 31-Dec-2021 Y
V N2154-101-A DGN 2005 VN2154-101-A-DGN-2005 HYDRAULIC CALCULATION FOR LGO-HDT FEED SR GASOIL STORAGE TANK ( 60-TK-101 A/B ) IFI IFR JGC 60-TK-101 A/B N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2006 VN2154-101-A-DGN-2006 HYDRAULIC CALCULATION FOR VGO HDT FEED STORAGE TANK ( 61-TK-001 A/B ) IFI IFR JGC 61-TK-001 A/B N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2007 VN2154-101-A-DGN-2007 HYDRAULIC CALCULATION FOR HEAVY SLOP STORAGE TANK ( 61-TK-002 ) IFI IFR JGC 61-TK-002 N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2008 VN2154-101-A-DGN-2008 HYDRAULIC CALCULATION FOR LIGHT SLOP STORAGE TANK ( 61-TK-003 ) IFI IFR JGC 61-TK-003 N 31-Dec-2021 Y
V N2154-101-A DGN 2009 VN2154-101-A-DGN-2009 HYDRAULIC CALCULATION FOR VGO FCC FEED STORAGE TANK ( 61-TK-004 A/B ) IFI IFR JGC 61-TK-004 A/B N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2010 VN2154-101-A-DGN-2010 HYDRAULIC CALCULATION FOR FCC GASOLINE TO EXISTING REFINERY STORAGE TANK ( 62-TK-001 A/B ) IFI IFR JGC 62-TK-001 A/B N 31-Dec-2021 Y
V N2154-101-A DGN 2011 VN2154-101-A-DGN-2011 HYDRAULIC CALCULATION FOR HDT NAPHTHA TO EXISTING REFINERY STORAGE TANK ( 62-TK-002 A/B ) IFI IFR JGC 62-TK-002 A/B N 31-Dec-2021 Y
V N2154-101-A DGN 2012 VN2154-101-A-DGN-2012 HYDRAULIC CALCULATION FOR HDT DIESEL TO EXISTING REFINERY STORAGE TANK ( 62-TK-003 A/B ) IFI IFR JGC 62-TK-003 A/B N 31-Dec-2021 Y
V N2154-101-A DGN 2013 VN2154-101-A-DGN-2013 HYDRAULIC CALCULATION FOR FUEL OIL STORAGE TANK ( 62-TK-004 A/C ) IFI IFR JGC 62-TK-004 A/C N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2014 VN2154-101-A-DGN-2014 HYDRAULIC CALCULATION FOR STRAIGHT RUN KEROSENE STORAGE TANK ( 62-TK-006 A/B ) IFI IFR JGC 62-TK-006 A/B N 31-Dec-2021 Y SUBMITTED
V N2154-101-A DGN 2015 VN2154-101-A-DGN-2015 HYDRAULIC CALCULATION FOR LOU GASOLINE STORAGE TANK ( 62-TK-008 A/B ) IFI IFR JGC 62-TK-008 A/B N 31-Dec-2021 Y
V N2154-101-A DGN 2016 VN2154-101-A-DGN-2016 HYDRAULIC CALCULATION FOR DESULPHURIZES GASOIL STORAGE TANK ( 62-TK-101 A/B ) IFI IFR JGC 62-TK-101 A/B N 31-Dec-2021 Y SUBMITTED
Change V N2154-101-A DGN 2021 VN2154-101-A-DGN-2021 DATASHEET FOR MVW SPRAY NOZZLE (AST-II) IFR IFR JGC COMMON N 31-Mar-2022 Y
Change V N2154-101-A DGN 2022 VN2154-101-A-DGN-2022 DATASHEET FOR TANK FOAM POURERS (AST-II) IFR IFR JGC COMMON N 31-Mar-2022 Y
Change V N2154-101-A EIC 5021 VN2154-101-A-EIC-5021 INSTRUMENT INDEX (AST-II) IFI IFR JGC COMMON N 31-Mar-2022 Y
V N2154-101-A EIC 5022 VN2154-101-A-EIC-5022 INSTRUMENT DATA SHEET - BREATHER VALVE (AST-II) IFI IFR JGC COMMON N 28-Feb-2022 Y SUBMITTED
V N2154-101-A EIC 5023 VN2154-101-A-EIC-5023 INSTRUMENT DATA SHEET - EMERGENCY RELIEF HATCH (AST-II) IFI IFR JGC COMMON N 28-Feb-2022 Y SUBMITTED
V N2154-101-A EIC 5024 VN2154-101-A-EIC-5024 INSTRUMENT SPECIFICATION - BREATHER VALVE (AST-II) IFI IFR JGC COMMON N 10-Mar-2022 Y SUBMITTED
V N2154-101-A EIC 5025 VN2154-101-A-EIC-5025 INSTRUMENT SPECIFICATION - EMERGENCY RELIEF HATCH (AST-II) IFI IFR JGC COMMON N 10-Mar-2022 Y SUBMITTED
V N2154-101-A PRO 0005 VN2154-101-A-PRO-0005 BILL OF MATERIAL FOR STEEL PLATES (AST-II) IFR IFR JGC COMMON N 7-Dec-2021 Y SUBMITTED
V N2154-101-A PRO 0006 VN2154-101-A-PRO-0006 MR FOR ALUMINUM PONTOON TYPE IFR (AST-II) IFI IFA JGC COMMON N 20-Dec-2021 Y
V N2154-101-A PRO 0007 VN2154-101-A-PRO-0007 BILL OF MATERIALS FOR FIRE FIGHTING PIPING (AST-II) IFI IFR JGC COMMON N 31-Mar-2022 Y
Change V N2154-101-A PRO 0008 VN2154-101-A-PRO-0008 MR FOR MVW SPRAY NOZZLE (AST-II) IFI IFR JGC COMMON N 31-Mar-2022 Y
Change V N2154-101-A PRO 0009 VN2154-101-A-PRO-0009 MR FOR TANK FOAM POURERS (AST-II) IFI IFR JGC COMMON N 31-Mar-2022 Y
V N2154-101-A PRO 0010 VN2154-101-A-PRO-0010 MATERIAL REQUISITION - BREATHER VALVE (AST-II) IFR IFR JGC COMMON N 17-Mar-2022 Y
V N2154-101-A PRO 0011 VN2154-101-A-PRO-0011 MATERIAL REQUISITION - EMERGENCY RELIEF HATCH (AST-II) IFI IFR JGC COMMON N 17-Mar-2022 Y
DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
CAPAR / NCR LOG

AUDIT DATE/ CAPAR DELAY IN


SL.No CAPAR/NCR No CAPAR/NCR
Date AUDIT No. DEPARTMENT / AUDIT SCOPE CAPAR/NCR DESCRIPTION CORRECTION / PREVENTIVE ACTION DUE DATE OF CLOSED-OUT
CLOSE OUT CLOSE OUT OVER
DUE(Days) ANALYSIS OF CAPAR Type of audit Location
LOCATION DATE DAYS

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
CAPAR / NCR LOG

AUDIT DATE/ CAPAR DELAY IN


SL.No CAPAR/NCR No CAPAR/NCR
Date AUDIT No. DEPARTMENT / AUDIT SCOPE CAPAR/NCR DESCRIPTION CORRECTION / PREVENTIVE ACTION DUE DATE OF CLOSED-OUT
CLOSE OUT CLOSE OUT OVER
DUE(Days) ANALYSIS OF CAPAR Type of audit Location
LOCATION DATE DAYS

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO
CONTRACTOR Chemie-Tech DATE
PROJECT

Obesrvations/ Punchlist
Sr.No Activity Cat. Status Comment
HINDRANCE REGISTER
CLIENT VOPAK South Africa Developments (Pty.) Ltd REPORT NO #REF!
CONTRACTOR Chemie-Tech DATE #REF!
PROJECT VOPAK Lesedi Terminal Project
Sr.No Hindrance Description Date Start Date Finish Time Remarks

Format No. CT-FPC-001 Rev. 1


HINDRANCE REGISTER
CLIENT VOPAK South Africa Developments (Pty.) Ltd REPORT NO #REF!
CONTRACTOR Chemie-Tech DATE #REF!
PROJECT VOPAK Lesedi Terminal Project
Sr.No Hindrance Description Date Start Date Finish Time Remarks

Format No. CT-FPC-001 Rev. 1


HINDRANCE REGISTER
CLIENT VOPAK South Africa Developments (Pty.) Ltd REPORT NO #REF!
CONTRACTOR Chemie-Tech DATE #REF!
PROJECT VOPAK Lesedi Terminal Project
Sr.No Hindrance Description Date Start Date Finish Time Remarks

Format No. CT-FPC-001 Rev. 1


DAILY HSE & MANPOWER REPORT

CLIENT #REF! REPORT NO #REF!


CONTRACTOR #REF! DATE #REF!
PROJECT #REF! Working Hours 8
INDIRECT MANPOWER DIRECT MANPOWER HSE STATISTICS
Sl. No. Description CTL CTL HIRED Sub Con Sl. No. Description CTL CTL HIRED Sub Con Sr. No. DESCRIPTION Prev Cum Today Cumulative
1 Project Manager 1 Water Tanker Driver 1 HSE Induction 0
2 Construction Manager 2 Helper 2 Toolbox Talks 0
3 Planning Engineer 3 Security 3 Manhours Worked 0 0
4 QA/QC Engineer Mech&Piping 4 Driver 4 Fatalities 0
5 HSE Manager 5 Helper 5 Lost Time Injuries (LTI) 0
6 QA/QC Manager 6 Security 6 Medical Treatment Injury Cases 0
7 Mechanical Engineer 7 Driver 7 Occupational illnesses 0
8 Mech. Engineer - Execution 8 Crane Operator 8 First Aid Cases (FAC) 0
9 Piping Engineer 9 Trailer Driver 9 Near Misses 0
10 Safety Engineer 10 Rigger 10 Incident 0
11 Safety Officer 11 Tank Fitter 11 Property damage 0
12 Admin. & HR Manager 12 Fabricator 12 Medical Treatment Case 0
13 Accounts Officer 13 Hydra Operator 13 Security Incident 0
14 Male nurse 14 Electrician 14 Other 0
15 PRO 15 Jack Operator 0 0
16 Quantity Surveyor 16 Telehandler Operator 0 0
17 Foreman 17 welder 0 0
18 Admin & HR Executive 18 Gas Cutter 0 0
19 Store keeper 19 Grinder
20 Tank Engineer 20 Painter
21 HSE Assistant 21 Blaster 0 0
22 Mech Supervisor 22 Pipe Fitter 0 0
23 Document controler 23 Flag Man 0 0
24 Painting Suervisor 24 Store Assisitant 0 0
26 Piping Supervisor 26 Asst Electrician
27 Procuremnet Engineer 27 Mechanic
28 28 First aider
29 29 Fitter
30 30 Drilling Operator
31 31 Asst Rigger
32 32 Time keeper asst
33 33 Cherry Picker operator
34 34 0 0
35 35 0 0
52
Total 0 0 0 Total 0 0 0 Today's Total Manpower : 0

DAILY MAJOR EQUIPMENT REPORT AT SITE

Sl. No. Description CTL CTL HIRED Sub Con Total in Nos. Remarks

1 Pick Up 0
2 Mini Bus 0
3 Car 0
4 Water Tanker 0
5 Crane 0
6 Trailer Truck 0
7 Office Container 0
8 Ablution Block 0
9 Store container 0
10 DG 275 KVA 0
11 Compressor 0
12 Water Tank 1000 ltrs 0
13 DG 65 KVA 0
14 Hydra 0
15 Telehandler 0
16 0
17 0
18 0
19 0
20 0
21 0
Total 0 0 0 0

Format No. CT-FPC-001 Rev. 1


Scope Tank 2 Tank 4 Tank 5 Tank 6
Description UOM 36.8 Dia MT 26.2 Dia MT Prev Cum Today Cumilative Balance Prev Cum Today Cumilative Balance Prev Cum Today Cumilative Balance Prev Cum Today Cumilative Balance
Rolling Shell Course 1 No's 12 54.05 9 28.863 0 0 0 0 12 54.05 9 28.86 0 0 0 0 12 54.05 9 28.86 0 0 0 0 12 54.05 9 28.86 0 0 0 0 12 54.05 9 28.86
Rolling Shell Course 2 No's 12 49.546 9 25.654 0 0 0 0 12 49.55 9 25.65 0 0 0 0 12 49.55 9 25.65 0 0 0 0 12 49.55 9 25.65 0 0 0 0 12 49.55 9 25.65
Rolling Shell Course 3 No's 12 40.533 9 22.446 0 0 0 0 12 40.53 9 22.45 0 0 0 0 12 40.53 9 22.45 0 0 0 0 12 40.53 9 22.45 0 0 0 0 12 40.53 9 22.45
Rolling Shell Course 4 No's 12 36.02 9 19.237 0 0 0 0 12 36.02 9 19.24 0 0 0 0 12 36.02 9 19.24 0 0 0 0 12 36.02 9 19.24 0 0 0 0 12 36.02 9 19.24
Rolling Shell Course 5 No's 12 27.017 9 16.03 0 0 0 0 12 27.02 9 16.03 0 0 0 0 12 27.02 9 16.03 0 0 0 0 12 27.02 9 16.03 0 0 0 0 12 27.02 9 16.03
Rolling Shell Course 6 No's 12 22.513 9 12.824 0 0 0 0 12 22.51 9 12.82 0 0 0 0 12 22.51 9 12.82 0 0 0 0 12 22.51 9 12.82 0 0 0 0 12 22.51 9 12.82
Rolling Shell Course 7 No's 12 18.01 9 12.824 0 0 0 0 12 18.01 9 12.82 0 0 0 0 12 18.01 9 12.82 0 0 0 0 12 18.01 9 12.82 0 0 0 0 12 18.01 9 12.82
Rolling Shell Course 8 No's 12 14.306 9 10.186 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19
Rolling Shell Course 9 No's 12 14.306 9 10.186 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19 0 0 0 0 12 14.31 9 10.19
SQM
Painting of Shell Course 1 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 2 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 3 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 4 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 5 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 6 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 7 No's 12 1147.61 9 408.53536 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5 0 0 0 0 12 1147.61 9 408.5
Painting of Shell Course 8 No's 12 911.2 9 324.3999 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4
Painting of Shell Course 9 No's 12 911.2 9 324.3999 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4 0 0 0 0 12 911.21 9 324.4

MT
Mainrafter Fitup 22.61 7.592 0 0 0 0 0 22.61 0 7.592 0 0 0 0 0 22.61 0 7.592 0 0 0 0 0 22.61 0 7.592 0 0 0 0 0 22.61 0 7.592
Mainrafter Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Secondary Rafter Fitup 8.12 0 0 0 0 0 8.12 0 0 0 0 0 0 0 8.12 0 0 0 0 0 0 0 8.12 0 0 0 0 0 0 0 8.12 0 0
Secondary Rafter Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 1 Fit up 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 1 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 2 Fit up 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 2 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 3 Fit up 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 3 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Chair Plate Fitup 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Chair Plate welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Centre Drum Fitup 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Centre Drum welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0

ERECTION
Annular Plate Laying No's 24 18 0 0 0 0 24 0.00 18 0 0 0 0 0 24 0.00 18 0 0 0 0 0 24 0.00 18 0 0 0 0 0 24 0.00 18 0
Annular Plate welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Bottom Plate Laying No's 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Bottom Plate SS Fit up 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Bottom Plate SS welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Bottom Plate LS Fit up 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Bottom Plate LS welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0

Erection Shell Course 9 No's 12 14.306 9 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0


Verical Fitup 24 0 0 0 0 0 24.00 0 0 0 0 0 0 0 24.00 0 0 0 0 0 0 0 24.00 0 0 0 0 0 0 0 24.00 0 0
Vertical Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Curb Angle Fitup 17.43 12.37 0 0 0 0 0 17.43 0 12.37 0 0 0 0 0 17.43 0 12.37 0 0 0 0 0 17.43 0 12.37 0 0 0 0 0 17.43 0 12.37
Curb Angle Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Chair Plate Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Chair Plate welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Centre Drum erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Mainrafter Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Mainrafter Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Secondary rafter Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Secondary rafter Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 1 Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 1 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 2 Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 2 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 3 Erection 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Cross Girder 3 Welding 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
MT/RMT
Erection of Shell Course 8 No's 12 14.306 9 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0 0 0 0 0 12 14.31 9 0
Vertical fitup SC8 12 24 0 0 0 0 12 24.00 0 0 0 0 0 0 12 24.00 0 0 0 0 0 0 12 24.00 0 0 0 0 0 0 12 24.00 0 0
Vertical welding SC8 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Horizontal Fitup SC 8 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
Horizontal Welding SC 8 to SC9 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0 0 0 0 0 0 0.00 0 0
DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
CIVIL CONSTRUCTION 32% #REF! 13%

Earthing works 8.00% 82.2% 96.3%


1 Grading of top soil SQM 40% 108000 87800 104000 1000 88800 104000 82.22% 96.30%

2 Remova of Top soil 300 mm SQM 60% 108000 87800 104000 1000 88800 104000 82.22% 96.30%

Tank Foundation Works 28.00% #REF! 15.7%


Tank pad Foundation TK 3 14.29% 100.0% 16.5%
Stone Ring & Compaction 21.00% 100.0% 76.9%
1 Coordinate markings No's 2% 1 1 1 1 1 100.00% 100.00%

2 Hard Barication MTR 3% 140 140 140 140 140 100.00% 100.00%

CUM 20% 3200 3200 3200 3200 3200 100.00% 100.00%


3 Excavation
SQM 5% 1960 1960 1960 1960 1960 100.00% 100.00%
4 Compaction of excavated area
CUM 15% 110 110 110 110 110 100.00% 100.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 1960 1960 1960 1960 100.00% 100.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 1990 770 70 1990 840 100.00% 42.21%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 100.0% 1.3%
SQM 30% 450 450 450 0 100.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 450 450 0 100.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 2400 50 2400 50 100.00% 2.08%
10 sand filling inside ring wall
HDPE Laying 8.00% 100.0% 0.0%
SQM 20% 1070 1070 1070 0 100.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 1930 1930 0 100.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 1063 1063 0 100.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 100.0% 0.0%

No's 25% 1 1 1 0 100.00% 0.00%


14 Installation of HDPE Sump
RMT 25% 45 45 45 0 100.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 8 8 0 100.00% 0.00%

17 Blinding CUM 5% 1 1 1 0 100.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 1 1 0 100.00% 0.00%

19 Casting of Wall CUM 20% 3 3 3 0 100.00% 0.00%

No's 5% 1 1 1 0 100.00% 0.00%


20 Installatio of Top Slab/Checkered Plate
Backfilling and Compactin 25.00% 100.0% 0.0%
Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 300 300 0 100.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 320 320 0 100.00% 0.00%
22 mm

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 10.00% 100.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 1070 1070 0 100.00% 0.00%
23 plate
Asphalt Laying 6.00% 100.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 860 860 0 100.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 6 14.29% #REF! 50.2%
Stone Ring & Compaction 21.00% 95.9% 100.0%
1 Coordinate markings No's 2% 1 1 1 1 1 100.00% 100.00%

2 Hard Barication MTR 3% 140 140 140 140 140 100.00% 100.00%

CUM 20% 3200 3200 3200 3200 3200 100.00% 100.00%


3 Excavation
SQM 5% 1960 1960 1960 1960 1960 100.00% 100.00%
4 Compaction of excavated area
CUM 15% 110 80 110 80 110 72.73% 100.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 1960 1960 1960 1960 100.00% 100.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 1990 1990 1990 1990 100.00% 100.00%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 100.0% 90.0%
SQM 30% 450 450 450 450 450 100.00% 100.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 450 450 0 100.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 2400 2400 2400 2400 100.00% 100.00%
10 sand filling inside ring wall
HDPE Laying 8.00% 80.4% 83.8%
SQM 20% 1070 1070 1070 1070 1070 100.00% 100.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 1100 800 200 1130 1300 1930 67.36% 100.00% Welding in progress
12 HDPE liner laying
SQM 20% 1063 1063 0 200 1063 200 100.00% 18.81%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 0.0% 0.0%

No's 25% 1 0 0 0.00% 0.00% Excavation in progress


14 Installation of HDPE Sump
RMT 25% 45 0 0 0.00% 0.00% Excavation in progress
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 0 0 0.00% 0.00%

17 Blinding CUM 5% 1 0 0 0.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 0 0 0.00% 0.00%

19 Casting of Wall CUM 20% 3 0 0 0.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 0 0 0.00% 0.00%

Backfilling and Compactin 25.00% 20.0% 0.0%


Laying of 50 mm crushed stone outer face of ring SQM 80% 300 0 0 0.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150 CUM 20% 320 320 320 0 100.00% 0.00%
22 mm

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 0 0 0.00% 0.00%
23 plate
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 5 14.29% 100.0% 18.2%
Stone Ring & Compaction 21.00% 100.0% 83.5%
1 Coordinate markings No's 2% 1 1 1 1 1 100.00% 100.00%

2 Hard Barication MTR 3% 140 140 140 140 140 100.00% 100.00%

CUM 20% 3200 3200 3200 3200 3200 100.00% 100.00%


3 Excavation
SQM 5% 1960 1960 1960 1960 1960 100.00% 100.00%
4 Compaction of excavated area
CUM 15% 110 110 110 110 110 100.00% 100.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 1960 1960 1960 1960 100.00% 100.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 1990 1170 1990 1170 100.00% 58.79%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 100.0% 2.5%
SQM 30% 450 450 0 450 0 100.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 450 0 450 0 100.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 2400 100 2400 100 100.00% 4.17%
10 sand filling inside ring wall
HDPE Laying 8.00% 100.0% 0.0%
SQM 20% 1070 1070 1070 0 100.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 1930 1930 0 100.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 1063 1063 0 100.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 100.0% 0.0%

No's 25% 1 1 1 0 100.00% 0.00%


14 Installation of HDPE Sump
RMT 25% 45 45 45 0 100.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 8 8 0 100.00% 0.00%

17 Blinding CUM 5% 1 1 1 0 100.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 1 1 0 100.00% 0.00%

19 Casting of Wall CUM 20% 3 3 3 0 100.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 1 1 0 100.00% 0.00%

Backfilling and Compaction 25.00% 89.3% 0.0%


Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 245 15 260 0 86.67% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 320 320 0 100.00% 0.00%
22 mm
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular SQM 100% 1070 0 0 0.00% 0.00%
23 plate

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 1 14.29% 100.0% 5.3%
Stone Ring & Compaction 21.00% 60.0% 25.0%
1 Coordinate markings No's 2% 1 1 0 1 0.00% 100.00%

2 Hard Barication MTR 3% 140 140 0 140 0.00% 100.00%

CUM 20% 3200 3200 3200 3200 3200 100.00% 100.00%


3 Excavation
SQM 5% 1960 1960 1960 0 100.00% 0.00%
4 Compaction of excavated area
CUM 15% 110 80 30 110 0 100.00% 0.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 1960 1960 0 100.00% 0.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 100 150 250 0 12.56% 0.00%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 0.0% 0.0%
SQM 30% 450 0 0 0.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 0 0 0.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 0 0 0.00% 0.00%
10 sand filling inside ring wall
HDPE Laying 8.00% 0.0% 0.0%
SQM 20% 1070 0 0 0.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 0 0 0.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 0 0 0.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 0.0% 0.0%

No's 25% 1 0 0 0.00% 0.00%


14 Installation of HDPE Sump
RMT 25% 45 0 0 0.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 0 0 0.00% 0.00%

17 Blinding CUM 5% 1 0 0 0.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 0 0 0.00% 0.00%

19 Casting of Wall CUM 20% 3 0 0 0.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 0 0 0.00% 0.00%

Backfilling and Compactin 25.00% 0.0% 0.0%


Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 0 0 0.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 0 0 0.00% 0.00%
22 mm

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 0 0 0.00% 0.00%
23 plate
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 8 21.43% 100.0% 5.3%
Stone Ring & Compaction 21.00% 0.0% 25.0%
1 Coordinate markings No's 2% 1 1 0 1 0.00% 100.00%

2 Hard Barication MTR 3% 140 140 0 140 0.00% 100.00%

CUM 20% 3200 3200 0 3200 0.00% 100.00%


3 Excavation
SQM 5% 1960 0 0 0.00% 0.00%
4 Compaction of excavated area
CUM 15% 110 0 0 0.00% 0.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 0 0 0.00% 0.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 0 0 0.00% 0.00%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 0.0% 0.0%
SQM 30% 450 0 0 0.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 0 0 0.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 0 0 0.00% 0.00%
10 sand filling inside ring wall
HDPE Laying 8.00% 0.0% 0.0%
SQM 20% 1070 0 0 0.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 0 0 0.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 0 0 0.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 0.0% 0.0%

No's 25% 1 0 0 0.00% 0.00%


14 Installation of HDPE Sump
RMT 25% 45 0 0 0.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 0 0 0.00% 0.00%

17 Blinding CUM 5% 1 0 0 0.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 0 0 0.00% 0.00%

19 Casting of Wall CUM 20% 3 0 0 0.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 0 0 0.00% 0.00%

Backfilling and Compactin 25.00% 0.0% 0.0%


Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 0 0 0.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 0 0 0.00% 0.00%
22 mm
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 0 0 0.00% 0.00%
23 plate

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 2 10.71% 100.0% 1.1%
Stone Ring & Compaction 21.00% 0.0% 5.0%
1 Coordinate markings No's 2% 1 1 0 1 0.00% 100.00%

2 Hard Barication MTR 3% 140 140 0 140 0.00% 100.00%

CUM 20% 3200 0 0 0.00% 0.00%


3 Excavation
SQM 5% 1960 0 0 0.00% 0.00%
4 Compaction of excavated area
CUM 15% 110 0 0 0.00% 0.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 0 0 0.00% 0.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 0 0 0.00% 0.00%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 0.0% 0.0%
SQM 30% 450 0 0 0.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 0 0 0.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 0 0 0.00% 0.00%
10 sand filling inside ring wall
HDPE Laying 8.00% 0.0% 0.0%
SQM 20% 1070 0 0 0.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 0 0 0.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 0 0 0.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner

Installation of Leak Detection System 5.00% 0.0% 0.0%

No's 25% 1 0 0 0.00% 0.00%


14 Installation of HDPE Sump
RMT 25% 45 0 0 0.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 0 0 0.00% 0.00%

17 Blinding CUM 5% 1 0 0 0.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 0 0 0.00% 0.00%

19 Casting of Wall CUM 20% 3 0 0 0.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 0 0 0.00% 0.00%

Backfilling and Compactin 25.00% 0.0% 0.0%


Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 0 0 0.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 0 0 0.00% 0.00%
22 mm

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 0 0 0.00% 0.00%
23 plate
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Tank pad Foundation TK 4 10.71% 100.0% 14.9%
Stone Ring & Compaction 21.00% 0.0% 71.1%
1 Coordinate markings No's 2% 1 1 0 1 0.00% 100.00%

2 Hard Barication MTR 3% 140 140 0 140 0.00% 100.00%

CUM 20% 3200 3200 0 3200 0.00% 100.00%


3 Excavation
SQM 5% 1960 1960 0 1960 0.00% 100.00%
4 Compaction of excavated area
CUM 15% 110 110 0 110 0.00% 100.00%
5 Fine sand filling below and above geotextile
SQM 15% 1960 1960 0 1960 0.00% 100.00%
6 Laying of Geo textile below the ring wall
CUM 40% 1990 450 100 0 550 0.00% 27.64%
7 20/40 rubble mounted ring wall construction
Earthfilling and compaction 25.00% 0.0% 0.0%
SQM 30% 450 0 0 0.00% 0.00%
8 Laying of Geo textile indside slop of the ring wall
SQM 10% 450 0 0 0.00% 0.00%
9 8/16 binding over the Geo textile layer
CUM 60% 2400 0 0 0.00% 0.00%
10 sand filling inside ring wall
HDPE Laying 8.00% 0.0% 0.0%
SQM 20% 1070 0 0 0.00% 0.00%
11 Fine sand layer(50mm) below HDPE liner
SQM 60% 1930 0 0 0.00% 0.00%
12 HDPE liner laying
SQM 20% 1063 0 0 0.00% 0.00%
13 Fine sand layer cover (50 mm)above HDPE liner
Installation of Leak Detection System 5.00% 0.0% 0.0%
No's 25% 1 0 0 0.00% 0.00%
14 Installation of HDPE Sump
RMT 25% 45 0 0 0.00% 0.00%
15 Installation of HDPE Drain Pipe

16 Excavation & Compaction CUM 10% 8 0 0 0.00% 0.00%

17 Blinding CUM 5% 1 0 0 0.00% 0.00%

18 Casting of Bottom Raft CUM 10% 1 0 0 0.00% 0.00%

19 Casting of Wall CUM 20% 3 0 0 0.00% 0.00%

20 Installatio of Top Slab/Checkered Plate No's 5% 1 0 0 0.00% 0.00%

Format No. CT-FPC-001 Rev. 1


DAILY PROGRESS REPORT
CLIENT #REF! REPORT NO #REF!
CONTRACTOR #REF! DATE #REF!
PROJECT #REF!
SCOPE Previous Cummulative Toay Plan Cummulative % Progress
Sr.No Activity UOM Remarks
WTG QTY Plan Actual Plan Actual Plan Actual Plan Actual
Backfilling and Compactin 25.00% 0.0% 0.0%
Laying of 50 mm crushed stone outer face of ring
SQM 80% 300 0 0 0.00% 0.00%
21 wall
Laying of sand 300 mm THK in two layers of 150
CUM 20% 320 0 0 0.00% 0.00%
22 mm
Asphalt Laying 10.00% 0.0% 0.0%
laying of Bitumen sand mix 80 mm below Annular
SQM 100% 1070 0 0 0.00% 0.00%
23 plate
Asphalt Laying 6.00% 0.0% 0.0%
Laying of Bitumen sand mix 80 mm outer face of
SQM 100% 860 0 0 0.00% 0.00%
24 ring wall (After hydro test)
Plot Fencing 8.00% 100% 114.6% 14.0%
1 Excavation CUM 15% 90 34 19 1 35 19 38.46% 21.40%

Installation of Vetical Post & Clearvu Panel for RMT 20% 1434 0 656 0 656 0.00% 45.74%
2 Inetrnal Fencing

Casting of Vertical Posts for External & internal CUM 15% 90 27 10 1 28 10 30.46% 10.87%
3 fencing
Fixing of concertina razor wire for internal fencing RMT 10% 1434 0 0 0 0 0.00% 0.00%
4
Installation of Vetical Post & Clearvu Panel for RMT 20% 1745 244 0 14 258 0 14.76% 0.00%
5 External Fencing
RMT 10% 1745 217 0 14 231 0 13.21% 0.00%
6 Fixing of concertina razor wire for External fencing
No's 10% 9 0 0 0 0 0.00% 0.00%
7 Installation of Gates

Format No. CT-FPC-001 Rev. 1


Daily Progress Report- VOPAK LESEDI TERMINAL LIMITED
Project Name Data Date : 7/Aug/2023 Reporting Date : 8/Aug/2023
Client Report No : 3
Overall Project Plan Vs Actual as on 07-Aug-23 As per Client Schedule Overall Project Plan Vs Actual as on 07-Aug-23 As per Internal Schedule

93.79%
100.00%
100.00%

80.00% 76.69%
80.00%

45.45%
60.00% 60.00%

39.10%
45.45% 48.34%
39.10%
40.00% 40.00%

16.30%
31.24%

12.64%
26.47% 26.47%

4.23%
20.00% 20.00% 12.07%
12.64% 5.38%
4.23% 1.15% 0.00%
0.00%
ENGINEERING PROCUREMENT CONSTRUCTION
ENGINEERING PROCUREMENT CONSTRUCTION

Plan Actual Lag


Plan Actual Lag

Procurement (Planned PO for August-23) Total Manpower Available at Site


PO MP Category Planned CTL Expat CTL Hired Sub Cont TOTAL Civil Foundation Works (T-01 to T-08)
Tag Number /
Description MR Enquiry Offer Received TBA CBA Remarks
Quantity Plan Actual Direct MP 185 0 0 26 26 100.00%
80.00%
OWS SYSTEM & WWTP Ö 25/Mar/18 In Direct MP 34 0 0 9 9 60.00%
40.00%
AIR COMPRESSOR UNIT Ö Ö 02/Apr/18 TOTAL 219 0 0 35 35
20.00%
Actual
Plan
0.00%
HVAC SYSTEM 20/Mar/18 Hold due to Building scope not cliear from client(VTL) TK- TK- TK- TK- TK- TK- TK- TK- TK- In-
01 02 03 04 05 06 07 08 ter-
PIG LAUNCHER & RECEIVER
Ö Ö 26/Mar/18 Total Equipment Available At site nal
Fenc
ing
NITROGEN PACKAGE Ö Ö Ö 12/Apr/18
Hold due to Revised Capacity from certain comments
from VTL.
CTL CTL Hired Sub Cont Break Down TOTAL

CP SYSTEM
Ö Ö Ö 27/Jan/18 Major Eqpt 9 2 26 1 37 Tank Fabrication Works (T-01 to T-06)

PIPE FLANGES Ö Ö Ö 17/Feb/18 Hydraulic Jack 160


100.00%
100.0%

MANUAL VALVES Ö Ö 26/Feb/18 Other Tools 80.00%


60.00%
PD PUMPS Ö Ö Ö 18/Feb/18
40.00%

FIRE WATER PUMPS


Ö Ö Ö 11/Mar/18 HSE Induction 0 Total Man-Power 0 20.00%
0.00%
TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07
FIRE WATER JOCKEY PUMP Ö Ö Ö 11/Mar/18 Toolbox Talks 0 Total Man-Hours 0

*Property *First Aid


MAIN POWER SWITCH GEAR Ö Ö Ö 28/Mar/18 * Near Miss : 5
Damage :
1
Cases :
1 Tank Erection Works (T1 to T6)

EMERGENCY POWER GENERATOR


Ö 18/Apr/18
Hold Due to Change in Capacity which got modified due
additional parameters from VTL.
Extension of Time Delay in Days
Actual Plan
CONTROL VALVE Ö Ö Ö 30/Apr/18 EOT Description Claimed Awarded Remarks 100%
80%

Ö Ö
60%
LIGHTING PANELS 03/May/18 Inclement Weather 40%
20% 0.00% 0.00% 0%
TRANSFORMER Ö Ö 20/May/18 Variation 0%
TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07
TOTAL 0 0

Planned TBE & PO (August-23) Engineering Document Status for the Month of August-23 (As per DCI)
MR Status Issue to Client Reviewed with Comments Re issued Reviewed
Planned Actual Enquiry Floated Offer Received Submitted For TBA TBA Received CBA Remark
Code A Code B Under Review Not Available
P A P A P A P A

TBE 35 6 12 18 11 46 32 19 19 6 6 Deliverable
675 532 629 451 562 155 576 210

PO 27 4
● Status of Major Construction Activity
Till Yesterday Today Cummulative till Date Till Yesterday Today Cummulative till Date
Activity Details UOM Scope Activity Details SCOPE UOM
Plan Actiual Δ% Plan Actiual Δ% Plan Actiual Δ% Plan Actiual Δ% Plan Actiual Δ% Plan Actiual Δ%

Civil Works Piping


Excavation CUM 57454 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Fit up
Backfliiing CUM 18735 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Welding
Stone Ring & Compaction Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 NDT
Earthfilling and compaction Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Hydrotest
HDPE Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Asphalt laying Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Bituminous Anti-Corresive Carpeting Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504 Err:504
Tank Foundations Scope UOM Tank 06 Tank 05 Tank 04 Tank 03 Tank 01 Tank 02 Tank 08
Excavation 3200 CUM #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Ring Wall 1990 CUM #REF! #REF! #REF! #REF! #REF! #REF! #REF!
HDPE 1930 SQM #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Asphalt Laying 1930 SQM #REF! #REF! #REF! #REF! #REF! #REF! #REF!

TK DETAILS / ACTIVITIES TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07 SITE PHOTOGRAPHS
Painting

Hydrotest
Shell N0-9

Shell N0-8

Shell N0-7
ERECTION

Shell N0-6

Shell N0-5

Shell N0-4
Shell N0-3

Shell N0-2

Shell N0-1
Bottom & Annual Plate Laying Err:509 Err:509 Err:509 Err:509 Err:509
Bottom & Annual Plate Cutting Err:509 Err:509 Err:509 Err:509 Err:509

Shell Plate Cutting & Squaring Err:509 Err:509 Err:509 Err:509 Err:509

Shell Plate Rolling Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Fabrication of Roofs Plate Err:509 Err:509 Err:509 Err:509 Err:509

Fabrication of Wind Grinder #REF! #REF!


FABRICATION

Fabrication of Curb Angle Err:509 Err:509 Err:509 Err:509 Err:509


Fabrication of Spiral Stairway & Handrail #REF! #REF!

Fabrication of Roof & Shell Manholes and Nozzles #REF! #REF!

Sump Fabrication #REF!


Fabrication of Cooling & Foam Pipe Support #REF! ● Areas of Concern

Fabrication of Cooling Rings #REF!

Blasting and Painting #REF!

● Engg. Status ● Procurement Status ● Construction Status


Daily Progress Report- VOPAK LESEDI TERMINAL LIMITED
Project Name Data Date : 7/Aug/2023 Reporting Date : 8/Aug/2023
Client Report No : 1
Overall Project Plan Vs Actual as on 07-Aug-23 As per Client Schedule
1
0.8
0.6 44.77%
0.4 26.67%
0.2 12.64%
2.57% 3.78% 0.76%
0
ENGINEERING PROCUREMENT CONSTRUCTION
Plan Actual Lag

Planned TBE & PO (August-23) Engineering Document Status for the Month of August-23 (As per DCI)
MR Status Submitted For Issue to Client Reviewed with Comments Re issued Reviewed
Planned Actual Enquiry Floated Offer Received TBA TBA Received CBA Remark
Code A Code B Under Review Not Available P A P A P A P A
TBE Deliverable
PO 0 MR
● Status of Major Construction Activity
Civil Foundation Works (T1 to T10) Tank Fabrication Works (T1 to T6) Tank Erection Works (T1 to T6)
100% Actual Plan Actual Plan
100%
90%
90% 100%
80%
80% 90%
70% 70% 80%
60% 60% 70%
50% Actual 50% 60%
Plan 40% 50%
40%
30% 40%
30%
20% 30%
20%
10% 0% 0% 0% 20%
10%
0% 10%
0% TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07
TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07 TK-08 TK- Internal 0%
Fencing TK-01 TK-02 TK-03 TK-04 TK-05 TK-06 TK-07

● Total Manpower Available at Site : ● Total Equipment Available At site : ● Engg. Status

MP Category Planned CTL Expat CTL Hired Sub Cont TOTAL CTL CTL Hired Sub Cont Break Down TOTAL

Direct MP 423 0 0 Err:509 Err:509 Major Eqpt 0 0 Err:509 2 Err:509


In Direct MP 476 0 0 Err:509 Err:509 Hydraulic Jack
TOTAL 899 0 0 Err:509 Err:509 Other Tools ● Area of Concern
Total Err:509
HSE Induction 0 Total Man-Power 0

* Near Miss : 0 *Property Damage : 0 *First Aid Cases : 0 Toolbox Talks 0 Total Man-Hours 0