1910 1920 1935 1945 1960 1970 19802110 2125 2135 2150 2160
1905 1915
January 2005
CPICH
January 2005
January 2005
Io
Io* = The sum total of all of these signals + any background noise (dBm)
January 2005
Ec1 Ec2
Ec1 Ec2
From the previous two measures we can calculate a signal quality for
each CPICH (SC) received
Ec/Io = Ec - Io (dB)
Io=-80dBm
From the above three measurements we can calculate for each pilot
the Ec level for that particular pilot
Ec1 = -80 - 5 = -85dBm
Ec2 = -80 - 10 = -90dBm
January 2005
January 2005
January 2005
January 2005
January 2005
For both softer and soft it is the Ec/Io levels used to determine whether
a cell should be added or removed from the active set
January 2005
January 2005
3G 2G
January 2005
January 2005
January 2005
These levels are the levels that should be achieved at the roof of the
vehicle
If these levels are not achieved then inbuilding coverage will be poor
Further optimisation with lower coverage levels is very difficult
Solutions: Downtilt, Azimuth, New Site
January 2005
January 2005
January 2005
January 2005
January 2005
Even with good Ec levels, some areas will never provide reliable
PS384 simply due to cell overlaps. It seems unclear whether a mature
network may ever provide a full 384 footprint.
Conclusion: 384 requires an optimised network
January 2005
120%
100%
80%
60%
GPRS Attach Success Rate
40%
20%
0%
-19 -18 -17 -16 -15 -14 -13 -12 -11 -10 -9 -8 -7 -6 -5
-20%
Serving Cell CPICH Ec/Io (dB)
January 2005
250
200
Mean DL Application Throughput
100
50
0
-14 -12 -10 -8 -6 -4 -2 0
Serving Cell CPICH Ec/Io (dB)
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
No
Can drive test Yes High cell Check with Nokia
A.6 A.7
proceed ? availability ? Opt manager
No
Optimization Stage 1 A.10
(Optimize RF condition)
Can OMC solve
the problem < 4 A.11 Can OMC solve
No hours? B the problem < 4 A.12 No
hours?
Yes
Yes
OMC works on A.13 Stage 1 No
A.14
solving the alarm completed? A OMC works on A.15
Increasing cell
Yes availability
No
No
Stage 2 A Postpone the drive test A.21
A.20
completed? to next day or until
Postpone the drive test A.19
Problem solved
to next day or until Yes
Problem solved
Optimization Stage 3 A.22
(Optimize Call Performance)
Stage 3 No
A.23
completed? A
Yes
January 2005
KPI measurement A.24
and reporting
AIRCOM International 2005
Overview of Vodafone NZs 3G Optimisation Process
Yes
A.17
Optimization Stage 2
steps described earlier (Optimize Neighbour list)
Yes
Performance Optimisation Optimization Stage 3 A.22
(Optimize Call Performance)
Stage 3 No
A.23
completed? A
Yes
January 2005
# _ Bins _ 1 _ Cell _ in _ Active_ Set 1+# _ Bins _ 2 _ Cells_ in _ Active_ Set 2+# _ Bins _ 3 _ Cells_ in _ Active_ Set 3
# _ Bins _ 1 _ Cell _ in _ Active_ Set+# _ Bins _ 2 _ Cells_ in _ Active_ Set+# _ Bins _ 3 _ Cells_ in _ Active_ Set
January 2005
Coverage Optimisation
Neighbour Optimisation
Pilot Pollution Optimisation
SHO Optimisation.
First stage is to run the KPI reports, then follows this with more
detailed analysis.
If the route meets the RF KPIs theres no point doing further analysis
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
January 2005
Stage 3 In Call Analysis (Speech, Video, PS, ISHO etc) will be the
subject of a further training session once Actix Reports in place.
CLUSTER ACCEPTANCE !!
January 2005