Professional Documents
Culture Documents
DX Excavator
Feb, 2009
Overseas Product Support Team
Text No. HYD0035
Power train (Axle)
Applied model
DX140W, DX190W, DX210W
2
Power train (Axle)
3
Power train (Axle)
4
Power train (Axle)
Brake disc
Output shaft
Brake piston
5
Power train (Axle)
Brake disc
Output shaft
Brake piston
6
Power train (Axle)
Planetary gear
Ring gear
Planetary (Fixed)
carrier
Ring gear
(Fixed)
Sun gear
Output shaft
Output shaft
Sun gear
Planetary
gear
Planetary carrier
Planetary carrier
Brake piston
7
Power train (Axle)
Planetary carrier
(Rotation with tire)
Brake discs
Return spring (Connected on planetary
carrier)
Brake piston
Steel discs
(Fixed on spindle)
8
Power train (Axle)
Brake oil
9
Power train (Axle)
When assemble brake housing, make sure the point - Both point must be aligned
10
Power train (Axle)
Differential gear
11
Power train (Axle)
Step 1
Up
12
Power train (Axle)
Step 2
13
Power train (Axle)
14
Power train (Axle)
15
Power train (Axle)
System pressure
1. Brake pressure : 60 bar
2. Steering pressure : 175 bar
Maintenance transmission
MS - E 3050 9.0
MS - E 3060 Front 10.5 2.5
MS - E 3070 11.0
MT - E 3050 11.2 2.4
MT - E 3060 Rear 14.0
2.5
MT - E 3070 14.5
16