Design concept

Case study

2
Design Concepts
Business values
Design data
Reliability
Busbar configuration & Layout
Equipment
Easy installation, O&M, extension
Klong Dan Terminal Station (230/115kV)

3
Business values
Economic issues: Legislation compliance:
Life cycle cost Safety
Equipment utilization Regulation, etc.
Environmental issues: Proper space used:
Visual For operation & maintenance
Noise For installation
Vibration etc. Extension

4
Design data
Requirements have to be determined:
Primary voltage
Capacity and rating of equipment
Number of source & load
Reliability criteria

5
Reliability
N-1 contingency
% overload
Flow of power (current)
Short circuit capacity
Insulation level

6
HV Busbar configuration
Single Busbar
Mesh-corner Busbar
Double Busbar (Single Breaker)
Double Busbar (Double Breakers)
Double Busbar (Single Breaker with Transfer Bus)
One-and-a-Half Breaker
Double Busbar (with Four Bus Tie)
7
Klong Dan Terminal Station
Capacity required:
Initial:
2-230kV incoming lines
2-230/115kV 300MVA Transformers
5-115kV outgoing lines
Final:
3-230kV incoming lines
4-230/115kV 300MVA Transformers
10-115kV outgoing lines
3 choices
Both 230 & 115kV outdoor installation
230kV outdoor but 115kV indoor installation
Both 230 & 115kV indoor installation
8
Both Outdoor ( 230,115 kV )
4 schemes are compared
Largest land-use
Pollution effected
Unfriendly Environment
Not economic life time cost
Easy expansion

9
Both Outdoor ( 230,115 kV )

10
230 & 115 kV: One and a half

11
230 & 115 kV: One and a half

12
230 kV: Double Bus Single Breaker 115 kV: One and a half

13
230 kV: Double Bus Double Breaker 115 kV: One and a half (1)

14
230 kV: Double Bus Double Breaker 115 kV: One and a half (2)

15
230 kV Outdoor & 115 kV Indoor
2 schemes on 115 kV are compared
Medium land-use
Pollution effected on 230kV
Unfriendly Environment
May be economic life time cost
Easy expansion

16
230 kV Outdoor & 115 kV Indoor

17
230 kV: Double Bus Double Breaker 115 kV: Double Bus Single Breaker (1)

18
230 kV: Double Bus Double Breaker 115 kV: Double Bus Single Breaker (2)

19
Both Indoor ( 230,115 kV )
3 schemes on 230kV are compared
Smallest land-use
Pollution not effected
Friendly Environment
Economic life time cost
Not easy expansion

20
Both Indoor ( 230,115 kV )

21
230 kV Double bus single breaker
115 kV Double bus single breaker (1)

22
230 kV Double bus single breaker
115 kV Double bus single breaker (2)

23
230 kV Triple bus single breaker
115 kV Double bus single breaker

24
Normal
3-TL -> 3x1004A => 1200MVA, 4-TR -> 4x753A => 1200MVA

1004A 1004A 1004A


753A 251A 502A 502A 251A 753A

1004A 1070A 1004A

753A 753A 753A 753A

25
1 TR Fails
3-TL -> 3x1004A => 1200MVA, 3-TR -> 3x1004A => 1200MVA

1004A 1004A 1004A


1004A 1004A 1004A

1004A 1070A 1004A

1004A 1004A 1004A 0A

26
1 TL fails while 1 TR out of service
2-TL -> 2x1508A => 1200MVA, 3-TR -> 3x1004A => 1200MVA

0A 1506A 1506A
1004A 2008A 502A 1506A

0A 1506A 1506A

1004A 1004A 1004A 0A

27
Normal
3-TL -> 2x1004A+1x753 => 1200MVA, 4-TR -> 4x753A => 1200MVA

1129A 1130A 753


753A 376A 377A 753A

1129A 1130A

753A

753A
753A 753A 753A 753A

28
1 TR Fails
3-TL -> 2x1506A+1x0A => 1200MVA, 3-TR -> 3x1004A => 1200MVA

1506A 1506A 0A
1004A 502A 502A 1004A

1506A 1506A

0A

0A
1004A 1004A 1004A 0A

29
1 TL fails just after 1 TR out of service
2-TL -> 1x3012A+2x0A => 1200MVA, 3-TR -> 3x1004A => 1200MVA

0A 3012A 0A
1004A 2008A 1004A

0A 3012A

0A

0A
1004A 1004A 1004A 0A

30
Result of Studies
Normal TR Fail TR&TL Fail Max. Current
Main Bus 753 1004 2008 2008
Tie Bus - - - -
TL 1004 1004 1506 1506
TR 753 1004 1004 1004

31
GIS Rating
Rated current and rated short circuit current of GIS according to
IEC-62271 for 69kV, 115kV, 230kV GIS

Rated current:
1,250A, 1,600A, 2,000A, 2,500A, 3,150A, 4,000A, 6,300A
Rated short circuit current:
25kA, 31.5kA, 40kA, 50kA, 63kA, 80kA, 100kA

32
Rated Current Selection for 230kV GIS

A
Main Bus 3,150
Tie Bus 2,000
TL 2,000
TR 2,000
33