Question Text:
A person is said to be not employed in the mine
Options:
(1) who works as a manager
(2) who works under appointment by the Manager
(3) who works in any office of the mine
(4) who works as a pump operator in a residential colony belonging to the mine
(5) who works in siding with in premises of the mine
Options:
(1) 100
(2) 300
(3) 500
(4) 1000
(5) 1500
Options:
(1) 100
(2) 150
(3) 200
(4) 250
(5) 500
Options:
(1) 50
(2) 75
(3) 100
(4) 150
(5) 200
Options:
(1) 10
(2) 14
(3) 15
(4) 20
(5) 25
Options:
(1) Form-C
(2) Form-D
(3) Form-E
(4) form-F
(5) Form-B
Options:
(1) 14-16
(2) 16-18
(3) 15-18
(4) 14-18
(5) 18-20
Options:
(1) Form-G&H
(2) Form-C&D
(3) Form-A&B
(4) Form-C&B
SMC-Mine Management, Legislation & General Safety
(5) Form-B&D
Options:
(1) 3
(2) 1
(3) 6
(4) 2
(5) 12
Options:
(1) 10
(2) 20
(3) 30
(4) 60
(5) 40
Options:
(1) 3 days
(2) 15 days
(3) 24 hours
(4) 48 hours
(5) 1 month
Options:
(1) Certificate of Age
(2) Certificate of Fitness
(3) Character Certificate
(4) Experience Certificate
(5) Domicile Certificate
Options:
(1) 60 days
(2) 30 days
(3) 90 days
(4) 1 year
(5) 45 days
Options:
(1) inspect the site of accident
(2) notify to RIM
(3) conduct investigation himself
(4) ensure that the place of accident is not disturbed
(5) get a plan of site of accident prepared
Options:
(1) Manager
(2) CMD of the company
(3) Engineer
(4) Director Personnel of the Company
(5) Central Government
Options:
(1) 10%
(2) 15%
(3) 20%
(4) 5%
(5) 30%
Options:
(1) Timber man
(2) Coal driller
(3) Track Layers
(4) Mine Managers
(5) Haulage attendents
Options:
(1) 3
(2) 2
(3) 1
(4) 0
(5) Not required
Options:
(1) 5 years
(2) 1 year
(3) 2 years
(4) 3years
(5) 4years
Options:
(1) 10m
(2) 8m
(3) 7m
SMC-Mine Management, Legislation & General Safety
(4) 5m
(5) 4m
Options:
(1) 15 & RIM
(2) 15 & CIM
(3) 7 & RIM
(4) 7 & CIM
(5) 30 & RIM
Options:
(1) double
(2) equal
(3) half
(4) one and half
(5) three-fourth
Options:
(1) Safety goggles
(2) resuable ear plugs
(3) visible harness
(4) dust respirators
(5) mobile phones
Options:
(1) a forcing fan used in belowground
(2) forcing fan used in aboveground
(3) a booster fan used in belowground
(4) a booster fan used in aboveground
(5) a main mechanical ventilator
Options:
(1) Approval by CIM
(2) Notified in official gazettee
(3) Tested by approved laboratory
(4) To be used with an electronic detonator
(5) To be used with detonating fuse
Options:
(1) Pneumoconiosis
(2) Silicosis
(3) Asbestosis
(4) Noise Induced Hearing Loss
(5) Tuberculosis
Options:
(1) 4 & 3
(2) 6 & 5
(3) 2 & 1
(4) 5 & 4
(5) 3 & 2
Options:
(1) Imparting initial training in rescue & recovery
(2) Imparting refresher training to rescue trained person
(3) Providing support during rescue & recovery
(4) Carry out functin of resuce room
(5) Imparting vocational training
Options:
(1) 45
SMC-Mine Management, Legislation & General Safety
(2) 90
(3) 40
(4) 30
(5) 60
Options:
(1) CO
(2) CO2
(3) O2
(4) CH4
(5) Black damp
Options:
(1) 100 mm
(2) 25 mm
(3) 50 mm
(4) 75 mm
(5) 60 mm
Options:
(1) poor quality and paucity of long props
(2) difficulty in dressing and checking
(3) difficulty in supporting the roof
(4) difficulty in checking accumulation of gas
(5) higher rate of production
Options:
(1) Independent
(2) Interlocked
(3) dependent
(4) All the Options
(5) None of the Options
Options:
(1) Accidental disconnection
(2) shock
(3) transmission alongwith the apparatus
(4) mechanical injury
(5) short circuit
Options:
(1) 1%
(2) 10%
(3) 5%
(4) 7%
(5) 3%
Options:
(1) 1.5m
(2) 3m
(3) 0.5m
(4) 1.2m
(5) 2.5m
Options:
SMC-Mine Management, Legislation & General Safety
(1) 15
(2) 20
(3) 25
(4) 30
(5) 10
Options:
(1) DGMS Standards
(2) BIS Standards
(3) Central Electricity Authority
(4) Manual of the manufacturer
(5) Requirement of the mining company
Options:
(1) FLP
(2) Intrinsically Safe
(3) Both FLP and Intrinsically Safe
(4) None
(5) 30 v
Options:
(1) 90
(2) 60
(3) 30
(4) 45
(5) 1 year
Options:
(1) Area Laboratory
(2) Rescue Station
(3) Central Institute of Mining & Fuel Research
(4) National mineral laboratory
(5) Central Mechanical Engineering Research Institute
SMC-Mine Management, Legislation & General Safety
Correction Answer : Option No.(3)
Question Text:
Which of the the following statement is wrong . The incumbustible dust used for treatment of
coal dust shall
Options:
(1) not contain more than 5% of free silica content
(2) be readily dispersible in air
(3) not cake
(4) be light in colour
(5) be able to absorb moisture
Options:
(1) date of last removal of stone dust
(2) reference number of of the barrier
(3) date of last inspection by VO
(4) signature of VO
(5) date of supply of stone dust
Options:
(1) Rate of rise of water level in the river adjacent to the mine
(2) Time taken in reaching withdrawal order to farthest working points of the mine
(3) Time taken for withdrawal of persons to surface
(4) Pumping capacity of the mine
(5) Margin of safety
Options:
(1) 15m/m
(2) 20m/min
(3) 30m/min
(4) 25m/min
SMC-Mine Management, Legislation & General Safety
(5) 10m/min
Options:
(1) 13m/min
(2) 20m/min
(3) 30m/min
(4) 25m/min
(5) 10m/min
Options:
(1) GM, 25 day
(2) agent, 21 days
(3) manager, 30 days
(4) ventilation officer, 30 days
(5) Safety officer, 21 days
Options:
(1) 10
(2) 12
(3) 15
(4) 24
(5) 20
Options:
(1) 10
(2) 15
(3) 24
(4) 20
(5) 18
SMC-Mine Management, Legislation & General Safety
Correction Answer : Option No.(3)
Question Text:
Air in the return airway of every depillaring district shall be completely analysed once at least
_____ with a view to determine__________
Options:
(1) 45 days & Graham's ratio
(2) 30 days & Graham's ratio
(3) 60 days & Yomeg's ratio
(4) 30 days & Black damp
(5) 45 days & black damp
Options:
(1) 3 mg/m3
(2) 4.5mg/m3
(3) 6mg/m3
(4) 2 mg/m3
(5) 3.5 mg/m3
Options:
(1) increasing rpm of the drill motor
(2) using sharp bits
(3) increasing the voltage of drill machine
(4) reducing the dia of drill bit
(5) decreasing the r.p.m.
Options:
(1) 2.75m
(2) 2.81m
(3) 2.5m
(4) 1.8m
(5) 2.0m
Options:
(1) 1.5m
(2) 1.44m
(3) 1.8m
(4) 1.0m
(5) 1.75
Options:
(1) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and pump it into rivers nearby.
(2) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into an effluent
(3) The effulent treatment plant is a plant to treat the water coming from different sources
(4) The effulent treatment plant is a plant to treat the waste materials coming from different areas
of the plant and make it into a cleaner.
(5) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into a cleaner and more environmental fiendly effluent
Options:
(1) Involves planning all activities required before, during, and after the operating of a mine to
reclaim land socially and economically.
(2) Involves planning all activities required before operating of a mine to reclaim land.
(3) Involves planning all activities required during and after the operating of a mine to reclaim
land.
(4) Involves planning all activities required after the operating of a mine to reclaim land socially
and economically.
(5) Involves planning of all activities required before, during, and after the operating of a mine.
Options:
(1) Rule based and reactive
(2) Documented and reactive
(3) Auditable and Docmented
(4) Risk based and Reactive
(5) Auditable and reactive