You are on page 1of 1

Number of E.I.C.

& Chief Engineer Posts in Engineering Cadre


Works Department H&UD Department DoWR
E.I.C. E.I.C. E.I.C.

Engineer-in-Chief , PH, Odisha,


E.I.C.-cum-Secretray, Works Department Bhubaneswar Engineer-In-Chief-Cum-Special Secretary, Bhubaneswar
Engineer-in-Chief Rural Water Supply &
Engineer-in-Chief ( Civil), Odisha Sanitation, Odisha, Bhubaneswar Engineer-In-Chief, P&D, Bhubaneswar

Special Secretary, RD/ CMD, OBCC Engineer-In-Chief, Water Resources, Bhubaneswar

E.I.C., RW , Odisha

Total= 4 Total= 2 Total= 3


Chief Engineer Chief Engineer Chief Engineer

Chief Engineer, PH ( Urban), Odisha, CE, Vigilance, Cuttack Director, Vigilance, Cuttack
Chief Engineer, DPI & Roads, Odisha Bhubaneswar
Chief Engineer, & Member Secretary, OWSSB, Chief Engineer, Quality Control & Research,
Bhubaneswar Bhubaneswar
Chief Engineer, National Highways, Odisha
Chief Engineer,OISIP(JICA), Odisha, Bhubaneswar MD, OCC, Limited, Bhubaneswar
Chief Engineer, (Buildings), Odisha
Chief Engineer,ORWSS-II, Odisha, Bhubaneswar CE & BM, Baitarani Basin, Keonjhar
Chief Engineer, World Bank Projects, Odisha
Chief Engineer , Sanitation, RWSS, Odisha, CE & BM, Um Basin, Burla
Chief Engineer, RD & QP, Odisha Bhubaneswar
Chief Engineer & Addl. Secretary to Government, CE-Cum-Addl Secretary Dowr, Bhubaneswar
Chief Manager (Technical), Eprocurements H&UD Department
CE & BM, Brahmani Basin, Samal
Chief Engineer, (Design Directorate)
Chief Engineer, Designs, Bhubaneswar
Additional Secretary, Works
CE & BM, Tel Basin, Bhawanipatna
Chief Engineer, RW-I
CE & Director, Ground Water Development,
Bhubaneswar
Chief Engineer, RW-II
CE & BM, RVN Basin, Berhampur
Chief Engineer, RW-III
Chief Engineer ( Civil), Odisha Police Housing & Walefare CE, JICA Project, BLB, Sukinda, Sukinda
Corporation, Bhubaneswar
CE Monitoring & Evaluation, Bhubaneswar
Chief Engineer, Odisha State Housing Board
CCE, Lower Suktel Project, Bolangir
Executive Director (Projects), OSDMA
CE, Water Services, Bhubaneswar

CE & BM, Indravati Kolab Basin, Khatiguda

CE, Drainage, Cuttack

CE Cum-Project Director, PMU, OIIAWMP, Bhubaneswar

CE, Inter State Water Dispute Cell, New Delhi

CE, Flood Control& BM, LM Basin, Bhubaneswar

CE & BM, Subarnarekha & Budhabalang Basin,


Laxmiposi
Chief Engineer, Mega lift, Projects, Bhubaneswar

Total = 14 Total = 6 Total = 22

Existing PB-IV Posts = 18 Existing PB-IV Posts = 8 Existing PB-IV Posts = 25

You might also like