You are on page 1of 8

Bridge & Structures Directorate

No. CBS/SO Dated: 19.12.2016

Sub: Distribution of work of Director/B&S/CB-II.

The work distribution among various Directors have been issued vide letter
No. CBS/SO dated 19.07.2016. Consequent on promotion and transfer of
Shri Praveen Khorana, Director/B&S/CB-II, the work of Director/B&S/CB-II is
proposed to be looked after by Director/B&S/CB-I and Director/B&S/UTHS as
under:

Director/B&S/CB-I:

Standard design of bridge substructure and foundations including well


foundation, RCC slabs, RCC box culverts, Limited Height Subway, RCC hume
pipes.

Director/B&S/UTHS:

(i) Pipeline crossings, Rail Structure Interaction (RSI), Inspection of


substructure & RCC superstructures with I&T unit, Bridge substructure
and foundation code revision/updation. Manual on design and construction
of well and pile foundation revision/updation.

(ii) Co-ordination with CWC, IMD & MOST for analysis of hydro-metrological
data and finalization of flood Estimation Reports for various
zones/subzones, Manual of Railway Affecting Works revision/updation,
collection of gauging/scour data from Zonal Railways, Inspection of gauging
sites, validation studies of flood Estimation Reports for various sub-zones,
other flood related issues, DBR of important bridges.

(iii) Administrative: Imprest, Xeroxing, PCDO of Structures Unit, Civil,


Electrical & Telecom Maintenance works.

(iv) Projects:
(a) Use of Remote Sensing and GIS technique in flood estimation:
(IIT/Roorkee and ISRO).
(b) Scour Monitoring: (IIT/Kharagpur)

(Kailash Singh)
ED/Structures
Copy to :

ED/B&S – for information.

Director/B&S/CB-I Director/B&S/UTHS

Director/B&S/SB-I Director/B&S/SB-II Director/B&S/I&T

ADE/B&S/CB-II ADE/B&S/CB-I AIE/B&S/CB-I


Bridge & Structures Directorate

No. CBS/SO Dated: 19/12/2016

Sub: Duty list of officers and staff under Structures Unit.

ED/STRUCTURES Unit:

Shri. Kailash Singh, ED/Structures (Head of the Unit)

Steno- 1. Smt Renu Pandey, PA


Peon- 1. Shri Peeyosh Ranjan, Helper
2. Smt. Aarti Sharma, Helper

(A) CB-I Unit:


Incharge - Shri M.P.Singh, Director/B&S/CB-I
ADE - 1. Shri A.K.Pandey, ADE/CB-I- PSC
2. Shri R.C.Verma, AIE/CB-I – Arch

Staff - 1. Shri Sanjay Kumar, SSE-Design


2. Shri Mukesh Kumar, SSE-Design
3. Smt. Dalwinder Kaur, SSE-Drg.
4. Shri Dinesh Tudu, SSE-Arch
5. Shri Jyoti Prakash, SSE-Library
6. Kumari Pradeepa, JE-Design
Steno - Shri Anuj Bhatnagar Steno
Peon - Shri Dharminder Kumar, Peon

Work -
(i) Technical: Design of PSC slabs and PSC Girders, Concrete Bridge code
revision/updation, Launching techniques, Inspection of PSC Bridges with
I&T Unit, Analysis of Arch Bridges, Arch Bridge code revision/updation.
(ii) Administrative: Library, Rajbhasha, ISO.
(iii) Projects: Assessment of efficacy of Arch bridges.
(iv) Any other work assigned from time to time.

(B) CB-II Unit:


Incharge - Shri Abhay Kumar, Director/B&S/CB-II
DD - 1. Shri P.P.Singh, Dy.Dir./CB-II

Staff - 1. Shri Sher Singh, SSE-Design


2. Shri S.N.Prasad, SSRE-Design
3. Shri Binay Kumar, SSE-Design
4. Smt Shweta Suman, SSE-Design
5. Smt Anjana Bhasin, SSE-Drg
6. Shri H.S.Meena, SSRE-Flood
7. Shri N.K.Singh, SSRE-Flood
8. Shri Manish Kr. Yadav, SSRE-Flood
Steno - Shri Amit Kumar Sharma, Steno
Peon - Shri Sanjay Kumar, Peon
Work -
(i) Technical:
(a) Design of bridge substructure and foundation, RCC slab & boxes,
LHS/RUB, RCC hume pipes, Pipeline crossings, Rail Structure
Interaction (RSI), Inspection of substructure & RCC superstructures
with I&T unit, Bridge substructure and foundation code
revision/updation. Manual on design and construction of well and
pile foundation revision/updation.
(b) Co-ordination with CWC, IMD & MOST for analysis of hydro-
metrological data and finalization of flood Estimation Reports for
various zones/subzones, Manual of Railway Affecting Works
revision/updation, collection of gauging/scour data from Zonal
Railways, Inspection of gauging sites, validation studies of flood
Estimation Reports for various sub-zones, other flood related issues,
DBR of important bridges.

(ii) Administrative: Imprest, Xeroxing, PCDO of Structures Unit, Civil,


Electrical & Telecom Maintenance works.

(iii) Projects:

(a) Scour Monitoring: (IIT/Kharagpur)-closed


(b) Evaluation & Management of longitudinal forces on substructure of
Railway bridges (with B&S unit)
(c) Use of Remote Sensing and GIS technique in flood estimation:
Proposed

(iv) Any other work assigned from time to time.

(C) UTHS Unit:


Incharge - Vacant Director/B&S/UTHS

ADE - 1. Vacant

Staff - 1. Shri Raj Kumar SSE


2. Shri Manish Kumar SSE-Design
3. Shri Rajiv Kumar SSE
4. Shri S.R.Meena JE
Steno - vacant
Peon - vacant

Work -
(i) Technical: DBR of Metro Projects, Ballastless track, High Speed
operation.
(ii) Any other work assigned from time to time.

(Kailash Singh)
ED/Structures
Copy to:

(i) ED/B&S

(ii) All Directors of B&S Dte.

(ii) DD/CB-II, ADE/CB-I, AIE/CB-I


Bridge & Structures Directorate

No. CBS/SO Dated: 19/07/2016

Sub: Office order.

At present, the post of DD/B&F is lying vacant. The work of DD/B&F is therefore be
looked after by ADE/CB-II, till the regular incumbent posted in B&F.

(Praveen Khorana)
Director/B&S/CB-II
Copy to:

(i) ED/B&S, ED/Structures


(ii) Director & Jt. Director of B&S Dte.
(iii) Dy.CE/CB-II, ADE/CB-I, ADE/CB-II, AIE/CB-I
Bridge & Structures Directorate

No. CBS/SO Dated: 19/01/2016

Sub: Office order.

At present, the post of DD/B&F is lying vacant. The work of DD/B&F is therefore be
looked after by AIE/CB-I, till the regular incumbent posted in B&F.

(Praveen Khorana)
Director/B&S/CB-II
Copy to:

(i) ED/B&S, ED/Structures


(ii) Director & Jt. Director of B&S Dte.
(iii) Dy.CE/CB-II, ADE/CB-I, ADE/CB-II, AIE/CB-I
Bridge & Structures Directorate

No. CBS/SO Dated: 17.06.2015

Sub: Distribution of works for various units under Structure Unit.

Ref: Note of even no. dated 15.04.2015.

One post of Director/B&S/UTHS (work charged) has been sanctioned and now
made operational. In view of this distribution of works among Directors will be as under:

Director/B&S/CB-I

Technical:

 Standard design of PSC slabs and girders, concrete bridge code, Launching
techniques, Inspection of PSC Bridges with I&T unit, Analysis of Arch Bridges, Arch
Bridge Code etc.

Administrative:

 Library, Rajbhasha, ISO.

Project:

 Temperature Project with Osmania University.

Or any other work assigned from time to time.

Director/B&S/CB-II

Technical:

 Standard design of bridge sub structure and foundations, RCC slabs, RCC box culverts,
Limited Height Subway, RCC hume pipes, Pipeline crossings, Bridge substructure and
foundation code, Manual on design and construction of well and pile foundation.

Administrative:

 Design of pier/abutment, well foundation, RSI, Imprest, Xeroxing and PCDO of


Structures Unit.

B&F Unit

Technical:

 Co-ordination with CWC IMD & MOST for analysis of hydro-metrological data and
finalization of Flood Estimation Reports for various zones/subzones, Manual of Railway
Affecting Works, collection of gauging/scour data from Zonal Railways, Inspection of
gauging sites, validation studies of Flood Estimation Reports for various sub-zones,
other flood related issues, DBR of important bridges etc.

Administrative:

 Civil, Electrical & Telecom maintenance works of B&S Directorate.

Project:

 Use of Remote Sensing and GIS in flood estimation with IIT/Roorkee and ISRO.
 Scour Monitoring with IIT/Kharagpur.

Or any other work assigned from time to time.

Director/B&S/UTHS:

Technical:

 DBR of metro project and ballastless track.

Presently there is no separate unit, therefore, the items at lower level will be dealt by
respective units.

Or any other work assigned from time to time.

(H.L.Suthar)
ED/Structures

Copy to:

Director/B&S/CB-II Director/B&S/UTHS Dy.CE/CB-II

ADE/CB-I ADE/CB-II AIE/B&F AIE/CB-I


Bridge & Structures Directorate

No. CBS/SO Dated: 17.06.2015

Sub: Distribution of work of Director/B&S/CB-I.

The work distribution among various Directors have been issued vide letter No.
CBS/SO dated 15.04.2015. At present Director/B&S/CB-I post is lying vacant. The work of
Director/B&S/CB-I is proposed to be looked after by Director/B&S/CB-II and
Director/B&S/UTHS as under:

Director/B&S/CB-II:

In addition to his works, DBS/CB-II will look after the works pertaining to Analysis of arch
bridges, Arch Bridge Code and Administrative work of ISO.

Director/B&S/UTHS:

In addition to his works, DBS/UTHS will look after the technical works of standard design of
PSC slab and girders, concrete bridge code, launching techniques, inspection of PSC
bridges with I&T unit, Temperature Project with Osmania University and Administrative
work of Library and Rajbhasha.

Leave Arrangement will be as under:

S.No. Designation Looking after


1. Director/B&S/CB-II Director/B&S/UTHS
2. Director/B&S/UTHS Director/B&S/CB-II

(H.L.Suthar)
ED/Structures

Copy to :

Director/B&S/CB-II Director/B&S/UTHS