You are on page 1of 11

+Sl 1

$&7=

A Look at Cement Bond Logs


Walter H. Fertl, SPE-AIME, Continental Oil Co.
p. E. Rlkington, SPE-AIME, Continental Oil Co.
James B. Scott, SPE-AIME, Continental Oil Co.

Introduction
Well cementing technology in both relatively straight matters worse, tools run by service companies use
and high-angle directional holes has advanced dra- various gating systems, spacings, frequencies, etc.
matically since the first casing was cemented in 1903. This lack of standardization, in addition to poor sonde
Besides the everyday cementing needs in problem- centering, miscalibration of tools, and inadequate in-
free boreholes, recent engineered improvements suc- formation on log headings, has more than once con-
. ..
cessrully cieai with cementing of arctic weiis, uitra- fused unsuspecting petroieutn engineers.
deep and hot holes, water-sensitive formations, and In the present discussion, CBLS are reviewed as
proper placement opposite incompetent, fractured, or to the information obtainable and as to how they are
highly permeable formations. interpreted. Comparative field tests and specific ob-
The basic requirements for obtaining a successful servations illustrate some of the pitfalls and possible
primary cement job have been known for years. Good misinterpretations if logging operations are not de-
design characteristics are based on a knowledge of signed properly or run correctly.
formation, cement, and pipe properties, and con- The CBL, if properly run and interpreted, is an
trolkxl placement techniques that consider fracture efficient aid in estimating cement bond quality. Usu-
gradients. Also important is an understanding of (1) ally the log consists of an ampiitude curve measuring
minimum practical mud density and viscosity, (2) a specific part of the acoustic signal; and since inter-
cement type, (3) turbulent flow conditions, (4) the pretation of the amplitude curve alone maybe incon-
optimum size of preflushes, (5) centralizing of casing, clusive and misleading, supplemental data are nor-
the use of scratchers, and the handling of pipe, and mally included. The latter may be one or more of
(6) the proper choice of casing. the following (1) transit time to the first event of
For more than a decade now, the oil industry has the acoustic signal reaching a minimum or prede-
used wireline well logging, such as cement bond log- termined amplitude, (2) amplitude of the formation
ging, to detect the presence of cement behind pipe signal, (3) variable intensity, and (4) oscilloscope pic-
and to evaluate the bond of the cement to both the tures. Additional measurements, although not di-
casing and the formation. rectly related to cement bonding, can also be included
The validity of Cement Bond Log (CBL) interpre- on the CBL. These usually include the gamma ray
tation has been a subject of controversy since its curve and casing collar log.
introduction; and the CBL, despite its great potential,
is probably one of the most abused, misused, and mis- Basic Principles of Cement Bond Logging
understood logs run in the oil field today. To make The Cement Bond Log is an acoustic logging system

I
I Despite its potential, the cement bond log is probably one of the most abused, misused,
and misunderstood logs used in the oil field today. Miscalibration, inadequate
information, and a severe lack of standardization are enough to push petroleum
-----
engineers into a moruss 0j bewW?rfii&iit.

607
TABLE l--CEMENT BOND LOG CHARACTERISTICS
Transmitter Pulse Gate
Logging OD Frequency Rate Width
Company (h; Type of Gate SpacKg (ft) (KH) (pulsa/see) (see)
A 3%7 Floating time,
fixed or floating amplitude 3 20 20 25-100
Fixed amplitude, 20 20 25
floating time 3, 5
11%6 Fixed amplitude 3 30 20 15-20
Floating time 5
Floating time, 20 15 50
fixed amplitude 3, 4, 5, 7
Fixed 3 20 50 50
Fixed 3, 4, 5 20 60 50
Fixed 3, 5 20 m 50
Fixed 4 20 60 50
Fixed 3, 4, 5 20 60 50
Fixed 4 20 20 200
Fixed 30
Fixed 4 15 10

(transmitter-receiver) used for years to analyze ing the time the gate is open, and the length of time
cement bond quality and to locate cement tops. Un- that the gate is open is referred to as gate width.
fortunately, the oil industry has not yet standardized Basically, two types of gates are being used by service
CBL logging sondes and logging operations. Table 1 companies: fixed gates and floating gates.
...j nf
illustrates tnls aa~ers~- SILUiILIUn
-:.. --+:-- h., :.*AI
UY Im.zug crime
.w... .,- the,
---- For a fixed gate CBL, both the gate width and the
basic characteristics of several CBLS currently avail- time the gate opens after the transmitter fires are
able. Here one must keep in mind that visual presen- fixed and therefore they do not depend on the time
tation of a specific log and its interpretation depend the acoustic signal arrives at receiver. In other words,
upon how and what portion of the acoustic signal is the fixed gate is set to open only at a definite portion
measured and recorded. of the wave train and thus records whatever ampli-
Furthermore, several other factors, such as tool tude is present at that time.
frequency, gating systems and bias settings, spacing Whh the floating gate, the tool remains open and
options, sonde centralization, tool calibration, and scans across the acoustic signal until it finds an
logging speed, also have a large effect on the tool amplitude high enough to trigger and then records
iiXpC)ZS2. this response as transit time, This signal amplitude
Frequency effects upon the character of CBLS have is often called bias setting. ?& rnagnntude Of Lbis
been studied by Chancy et al. who concluded that bias setting is very important. For example, if the
logging systems using predominantly high frequen- bias is too low, the floating gate could be triggered
cies may result in a pessimistic evaluation of the by cable noise or forerunners.
cement bond to the pipe because high frequencies Comparison of two CBLS that were run using the
preferentially travel the pipe path along the unbended same logging device but different gating systems are
se-merit. shown in Fig. 2. It is an excellent example of what
Fig. 1 shows a comparative fieid test of a cottven- Caz bzppea. TWm. .. .10gs run hack-to-back in the same
tiomd 3%-in. compensated acoustic-type tool, with well show completely different amplitude curves. The
a center frequency of 20 Kc, and a small-diameter only difference is that the logon the left was run with
tool (1% in.), with a center frequency of 30 Kc. a fixed-amplitude gate and the one on the right with
These logs were mn in a 5%-in. casing in a well a floating-amplitude gate. For the floating-gate log,
located in Duval County, Tex., 40 hours after cement- the time curve and VDL are necessary for complete
ing. Comparison of both logs shows that the higher- evaluation. Otherwise, looking only at the amplitude
frequency log generally gives poorer bond indication curve one could conclude that the log run with the
because of stronger casing signal on the VDL* and floating gate indicated poor casing cement bond.
higher values on the amplitude curve. Actually both logs are valid and show a very good
Cycle skipping, as shown by the increase in cement job.
transit time results from the attenuation of the casing The point is that if one has insufficient knowledge
signal below the bias setting of the floating transit of how a CBL tool works and how the log was run,
time gate. Cycle skips occur in Figs. 1, 2, and 7. and if one relies only on the amplitude curve for a
Gating systems and bias setting are also very im- definition of cement bond quality, erroneous con-
portant parameters. It is necessary to know how a clusions may be drawn.
specific tool is gated to measure a particular por- Spacing options for CBLS have been listed in Table
tion of the wave train. Measurements are made dur- 1. Basically, very long amplitude spacings show less
As used here, VDL refers to a generic type of presentation, which detail because of poorer vertical tool resolution and
includes VDL, MSG, Sonic Seismograph, etc. Scope pictures can thus give a too optimistic cement bond log.z Morak
also be used and are referred to as sianature logs, X-Y plot% Or
scope picture logs. if you want a low amplitude, run the longest CBL

608 JOURNAL OF PETROLEUM TECHNOLOGY


spacing you can find! Keep in mind that too short
an amplitude spacing may result in interference from Sonde Centerings, 7,8
direct mud arrivals. Proper centralization of the logging sonde in the
A long spacing is used for the VDL. With longer casing is more critical with short-spaced tools. For
spacing, the formation signal arrivals will be stronger example, eccentering a 3-ft-spaced tool by A in.
and clearer, which makes them easier to recognize. causes an amplitude reduction up to 50 percent of
Fig. 3 shows such a spacing comparison (3 and 5 the value otherwise recorded with a perfectly cen-
ft) for both the amplitude curve and the VDL tered tool, thereby giving a false indication of bond
presentation. quality. Thus, properly centered tools are of utmost

TRANSIT AMPLITUDE VDL MPLITUDE VOL


400 TIME 2( )() TIME ~ (3Fr) 5

.4

.
-

i
J

FREQUENCY 20 KC FREQUENCY 30 KC

Fig. lEffect of CBL sonde frequency and thickness of resin-sand coating on casing.

JUNE, 1974 609


Middle East. Tool centering in this 95/s-in. casing
importance in large casings and in directional holes.
especially affects the first CBL run, as clearly shown
Also, tools should not be run too fast since at high
by the waviness of the time curve. Also note that too
speeds, such as4,000ft/hr, the sonde maybe jerked 1,..., - +...,~l timp .21WXX coincides with a drastic re-
,Uw a .Lcs. w . . ... . . ----- - -------
off center.
duction in values of the amplitude curve, giving a
Eccentering can be recognized on the time curve
too-optimistic bond indication. The repeat log run,
by values recorded lower than casing signal arrival
using an additional centralizer, shows Improved cen-
time for specific tool and borehole conditions. Also,
tering. Comparison of the two log runs reveals that
because some arrivals are out of phase, the VDL
even relatively small variations in the time curves are
shows wavy rather than straight streaks representing ..m--. _x :- fi....+:- ,.h.mti-. A hdh amnlitude values.
reneewu III UIC13UV tiU~LS5W. . . . -u... -...r... -
the pipe signal. Preferred accuracy ior tine transit
The Appendix lists several recommendations for
time curve is ~ 2 ~sec, with a maximum tolerant@ of
proper centralization in both vertical and direc-
~ 5 ~sec, for a 3-ft-spaced tool.
tional boreholes. Since it is extremely difficult to cen-
Fig. 4 shows an example of a well located in the

$!
*

$

:;
J
:.
:

.:, i:-
.%

+
I

. .
..----
:z-;
-;:.
::
-w
,:
17

:::
:..
:::
..
:-:
---
.,.
.-.
.-
:.:.:,
.
/

:,
.~::
:,
:::

-::
.,
., :;;, ,.:
:..
-.: .

::
. ...-, : ::;, ::
,:

:...
:::: :
::~: :: f!:, ,:,
,:, :; ,,

z
;:;!:
:,. ;: ::
% * :.
!:: ,~

z!3!i-
:: .::.,
:;~:i ::
:.:: _:.1 :

.... .::
:., :
:::: :!!
:; !: ::::!

& ;:.*
:;. ..:

w
+Riili+
d
mm
~--- riIEEI
. w
lit

!zEEEE -Ii:!
--+=

FLOATING GATE
-- .,
. . .. . .

Fig. 2Same CBL sonde as in Fig. 1 with different gating system in same WCU.

JOURNAL OF PETROLEUM TECHNOLOGY


610
ter the CBL sonde in, say, 133/s-in. casing, one may TRANSITTIME,p set AMPLITUOE,mv
want to consider the possible alternative of pressure L 1

testing the casing shoe. F


In some areas, logging engineers have found that
improper gate setting for example, moving the
amplitude gate to the back side of El will result in
nicespikes through casing collars in low-amplitude
intervals. This allows easy marking of collars without
l--l--l+

Ill
correcting depth from CCL. However, it is no justifi- RN I
RUN2
cation for setting an amplitude gate improperly. Fur-
thermore, such practice makes the tool more sensitive
to centering.
I
Calibration
Different logging companies use ditlerent calibration
procedures. It is vitally important that the logging
sonde be properly calibrated before and after the
logging run. In down-hole calibration, the tool must
h-
., r.nlihrnt.d
W..I.. -.WW in free
. . . ..w, Ilnhmm+.wl
. . . .....
cemented to the surface, a shop or surface calibra-
W @~~+ If c@qg ~S HHA 7800
1
tion is required for tools without an internal calibra-
tion system. One should check for proper transit time,
which can be computed or obtained from tables avail-
able from service companies. Improperly low gain
setting can result in low amplitude readings in free
pipe as refiected by drastic amplitude reduction (40 ~,,_
Fig. 4-Effect of centralization on CBL.
~ AMPLITUDE . ITUDE ~
2m 5FT)
I (3Fr) -

-i -

JUNE, 1974
II Fig. 3-Effect of spacing changes on amplitude curve and V ..

611
carry a large pipe signal to the receiver. Following
to 80 Dercent) from that of casing collars. Too high
a gain- settkg can result in a pessimistic log.
are some basic characteristics of both the CBL and
the VDL:
Logging Speed 1. Strong casing signal arrivals. If the logging
Logging speed is a basic consideration for any wire- sonde is centered, the VDL lines are parallel. If the
line logging tool. Experience indicates that 1,800 sonde is eccentered, some of the signal arrivals are
ft/hr gives the most reliable results over the zones of out of phase. This causes two main effects: (a) the
interest. Logging speed should not exceed 3,600 ft/ amplitude changes considerably as the sonde moves
hr. Speeds faster than this can create more tool cen- from one side to the other, and (b) the VDL lines
tering problems. are wavy instead of straight.
2. Weak, if any, formation signals. If formation
Cement Bond Evaluation signal is present, it is because the casing rests against
A more thorough understanding of bonding condi- the formation or because the formation around the
+:,....
Uuua
:. =Ffi.,hlp~
ID y... u-u
hv nrnner
, y--r-. ----
of Celll@
interoretatbn
r----- --
pipe is sloughhg.
7 9 The following discussion ihStraks how 3. Clear chevron patterns (W) observed at the
bond logs. ,
to recognize various conditions of bonding between collars on the VDL. -This dktortion is attributed to
casing, cement, and formation. discontinuity of metal at the collars, which causes
a reflection of the acoustic signal. The vertical dis-
Uncemented Casing Free Pipe tance between pattern comers equals the transmitter-
Y--.- . L... A 1,.. +. t.. ncmittt=r nntc Quf ~ receiver spacing.
m (XIIKXI1 Uul:u lUGgILJS, a .~-..-...-..-. r---

vibration pulse that is picked up by the receiver. If 4. Increasesin travel time curve and amplitude
pipe is free i.e., not held by cement and not in decreases at collars.
5. No change in arrival time with depth.
touch with the borehole wall it will vibrate and

wRCENT UNBONOED VDL


TRANSIT AMPLITUDE o IU2
1200 PIPE~
TIME 2000 xl 200 DL
400

1
.
. . .
. .
.

.:, .
a
J.
:.-
,:
pzi___
----
:::
,,
;

_j...:
L

$,
:
.. -
.,.
;:
_. l
,
-.;..
!& . . .. l-----
;:

,:
,,

::
~!
::
;::
~:
! .-----: -::
:: ,!
0; -%..-- -.--
!!,
:: 0
:: 4.. --
- -
:: i~ 1

: -. - i> + ---
::.
:,
.,

COMPANY A I
Fig. 5A-CBL response to free pipe, cement top, and channeling.

JOURNAL OF PETROLEUM TECHNOLOGY


612
.
Fig, 5 illustrates the presence of essentially free, ging sonde in 5%-in. and 15.1 lb/ft casing). Strong
uncemented pipe above 990 ft. The logs of all four parallel casing arrivals are seen on all VDL runs.
service companies clearly define the cement top at
990 ft, with only Service Company B still showing Good Bond to Casing and Formation
some damping effect on the amplitude curve over Good bond to both casing and formation creates a
the first three free joints. good acoustic coupling between casing, cement, and
All four logging tools are centralized. For example, formation. For illustration, the acoustic wave forms
Company As time curve on three passes using fixed are shown schematically in Fig. 6 for both low-
and floating gates falls within the & 5 psec accuracy velocity formations (shales, soft sands, etc.) and high-
range required (i.e., T = 246 psec for a 33/s-in. log- velocity formations (carbonates, etc.). In both situa-

AMPLITUDE
PIPE
I I VDL PERCENT BONDING VDL
~ ---
FORMATION
-- _ 1200
200 1200 ~ 200

.;

.,
---------
~31=
-j --

. .

. .

I[)ol

1, (,

110(1

I COMPANY C ] COMPANY D ]

Fig. 5B-CBL response to free pipe, cement top, and channeling.

JUNE, 1974 613


tions, maximum energy is transmitted to the forma- by (1) high acoustic formation attenuation (soft
tion because of the excellent acoustic coupling be- shales, unconsolidated gas sands, etc.), (2) the pres-
tween the interfaces of pipe, cement, and formation. ence of gas in the mud, and (3) an eccentered tool.
In general, the casing signal becomes essentially
negligible. This is apparent in soft formations. In M]croannulus
hard formations interpretation is complicated because A microannulus is a very small gap between casing
fast velocity arrivals will reach the amplitude measur- and cement that will affect the CBL. It can exist even
ing gate either at the same time or before the casing with a hydraulic seal, which prevents vertical fluid
signal. Under these conditions, the amplitude curve migration. A microannulus can be caused by (1) hold-
does not reflect the bond condition. The formation ing pressure on casing after cementing, (2) thermal
.__I: ..A. --- h ~~ CBI d in the fixed pipegate and
duq.ud Uuu wall UQ.I.wa...r-. ... --- ..... . expansion of pipe while cement sets, (3) thermal con-
can be significantly different from the low amplitude traction as a result of circulating cooler borehoie
frequently associated with good bonding. Thus VDL fluids before running the CBL, and (4) contaminants
or scope pictures are necessary for reliable interpre- such as mill varnish and grease on the external sur-
tation, particularly in fast formations. face of casing, and oil-wet pipe.
Generalized characteristics for good bond to casing Generalized log characteristics of such a micro-
and formation are as follows: annulus include (1) weak to moderately high casing
1. Weak or no casing arrivals. arrivals, and (2) moderate formation signal.
2. Strong formation arrivals, provided formation In F]g. 7, comparison of runs without casing pres-
attenuation is not too high (unconsolidated gas sure and with 1,000 psi casing pressure clearly shows
sands, etc.) the presence of microannulus in the intervals from
In Fig. 7 very good bond to casing and formation 1,760 to 1,820 ft and from 1,900 to 1,990 ft.
occurs over long sections of the hole, Formation If it is mechanically feasible, it would be good
arrivals are easily recognized by the way the forma- practice, should one suspect the presence of a micro-
tion travel time on the VDL varies with depth. annulus, to run CBLS with a short overlap under
pressure over zones of interest. If there is a signifi-
Good Casing Bond but Poor Formation Bond cant change in amplitude between the two runs, the
Past practice often has been based on the rule of entire log should be run under pressure to eliminate
thumb that good bond to pipe goes hand in hand this effect.
with good bond to formation. However, this rule does
not always hold. Channeling
General characteristics for good bond to pipe but With channeling, cement is present but is not com-
poor bond to formation are (1) weak casing arrival, pletely surrounding or bonded to the casing, Pres-
and (2) weak or no formation arrival. surizing the casing will produce little or no change in
It is impossible to recognize such bond conditions the CBL amplitude or VDL, and where there is con-
from the casing amplitude curve only. Where there tinuous channeling there is no vertical isolation. In
is low casing signal amplitude, a VDL is required to Fig. 5 channeling is present between 1,050 and 1,120
indicate lack of formation response. ft. Pressurizing the casing did not change the ampli-
Some companies use a two-curve system consisting tude values or the VDL on either log run by Com-
of casing amplitude and formation amplitude curves pany A. Similar results, keeping the different gating
run in the cased hole. A low formation amplitude in mind, are observed with Companies B and C.
curve can be indicative of poor or no bonding be- However, Company Ds amplitude curve failed to
tween cement and formation. However, if there is show channeling. (All CBLS are reproduced as re-
no formation amplitude curve, a VDL is absolutely ceived from the logging companies.)
necessary. Weak formation signals can also be caused
Other Factors Intfuencimg CBL Inteq.wetationa
To properly interpret a CBL, it is important to under-
stand the effect of other factors on the acoustic signal.
Here are some of those effects:
1. Drilling and completion fluid properties, such as
O. FREE PIPE
type, weight, mud additives, and presence of gas cut.
~0such ~ she, wall thickness>
2. Casing properties,
cleanliness, and type of external pipe surface.
o 3. Cement properties, 10,11 such m type, compres-
a b. GOOD.BOND TO PIPE
u
N ANO FORMATION sive strength, setting time, and contamination by drill-
SO FT. FORMATION(LOWVELOCITY) ing mud. Cement thickness can be critical in certain
w
z liner completions where thickness is less than % in.
i=
C. Gooo BOND To PIPE a HARD
Effect of Resin-Sand Coated Casing on CBLS
FORMATION (FAST VELOCITY) In recent yean resin-sand coated casing has been
widely used in well completions to obtain a stronger
bond between the casing and the cement.-
Winat effect does thk resin-sand coating on the ex-
Fig. %Acoustic wave forms. ternal surface of the pipe have on the CBL? In sev-

614 JOURNAL OF PETROLEUM TECHNOLOGY


eral field tests different types and thicknesses of resin cellent coupling (bond) over the coated pipe section.
coating were applied in the same well and various Also nbte the presence of a microannulus in the plain
CBLS were run to study the effect of the coating on (uncoated) pipe immediately above the coated section.
the acoustic signal. One coated joint was run in the free (uncemented)
In field tests run in Duval County, Tex., in rela- portion of the casing string to determine the effect of
tively shallow (3,000 to 4,000 ft) vertical holes, a coating on the CBL in free pipe.
thick coating with numerous air bubbles entrapped Neither the amplitude curve and VDL nor the
in the resin gave poorer bond indication than thin scope pictures showed any effect due to the pipe
coating. Fig. 1 shows this phenomenon of poorer coating in free casing (Fig. 8).
bond indication for the thickest coating (50 to 70 Over-all test results indicate that thick resin-sand
roils), whereas for thin coating (1 O to 25 roils) this coating on the external surface of the casing may
effect is absent. show up as poorer bonding. The CBL anomaly caused
In a field test in West Texas, another series of by thick resin with entrapped air bubbles can be
tests on coatings ranging in thickness from less than avoided by restricting the thickness of the coating to
10 roils to 30 roils was run to further investigate this 10 to 25 roils and adding a chemical to reduce air
anomaly. A chemical additive was mixed with the bubble entrapment. This approach is now used in all
resin before application to reduce the air bubbles field applications of the resin-sand coated casing.
entrapped in the resin. Four service companies ran
CBLS in this well. There was no effect on the ampli- Conclusions
tude curve as a result of the presence of resin-sand Results of this study show that (1) a variety of tool
coating on the cemented pipe (Fig. 2). Note the ex- calibrations and logging procedures are used by log-

Tl?#.S.T ~ ~ AMPLITUDE ~ TRANSIT


VDL TIME
I I %Or) la 1 T eH5Fzm L W)(

I Ill II II
a
Fig. 7Effect of microannulus on CBL response.

JUNE, 1974 615


ging companies, (2) interpretation is not so simple 10. Pardue, G. H., Morris, R. L., Gollwitzer, L. H., and
Moran, J. H.: Cement Bond Log A Study of Ce-
and straightforward as often assumed, (3) necessary ment and Casing Variables, J. Pet. Tech. (May 1963)
information on cementing and logging operations is 545-555; Trans., AIME, 228.
often not available or not included on log heading, 11. Weaver, W. B., Jordan, A. J:, and Overton, H. L.: The
(4) application of resin-sand coated casing will not Effect of Chrome-Ferro Llgnosulfonate on Cement
Bonding; The Log Analyst ( 1965) 13-26.
ailect the CBL response, provided coating thickness
does not exceed 30 to 40 roils and a chemical additive 12. Wtnn, R. H., Anderson, T. O., and Carter, L. G.: A
Preliminary Study of Factors Influencing Cement Bond
is used to reduce air bubble entrapment in the resin, Logs J. Pet. Tech. (April 1963) 369-372,
and (5) standardization of logging techniques used by 13. Carter, L. G., and Evans, G. W.: A Study of Cement-
different logging companies is needed in order to Pipe Bonding: J. Pet. Tech. (Feb. 1964) 157-160.
derive the maximum benefit from CBffs as the tool 14. Scott, J. B., and Brace, R. L.: Cement Bonding Is
for evaluating cement bond quality in well comple- Improved with Coated Casing; paper presented at
tion operations. Spring Meeting, Mid-Continent Dist., API Div. of Pro-
duction, Tulsa, March 30-April 1, 1966; Oil and Gas J.
(Aug. 1, 1966).
References
15. Cawley, M. M., and Lindsey, H. E.: Special Comple-
1. Gibbs, M. A.: Delaware Basin Cementing Problems tion Methods Boost Production Rates 75% V World Oil
and Solutions, J. Pet. Tech. (Oct. 1966) 1281-1285. (June 1969).
2. Grosmangin, M., Kokesh, F. P., and Majani, P.: *A
Sonic Method for Analyzing the Quality of Cementation APPENDIX
of Borehole Casings, J. Pet. Tech. (Feb. 1961) 165-
171; Trans., AIME, 222. Cement Bond Logging Guidelines
3. Anderson, W. L., and Walker, T.: Research Predicts
Improved Cement Bond Evaluations With Acoustic Checklist for Logging Service Company
Logs: J. Pet. Tech. (Nov. 1961) 1093-1097. A. Adhere to following centralization requirements.
4. Chancy, P. E., Zimmerman, C. W., and Anderson, W.
L.: Some Effects of Frequency Upon the Character of 1. Vertical Holes
Acoustic Logs, J. Pet. Tech. (April 1966) 407-411. a. Use minimum of three centralizers.
5. Bade, J. F.: Cement Bond Logging Techniques How b. Preferably use rubber fin or rigid aluminum
They Compare and Some Variables Affecting lnterpre- centralizers.
tatiom J. Pet. Tech., (Jan. 1963) 17-22.
c. Locate centralizers immediately above and
6. Pickett, G. R.: Acoustic Character Logs and Their
Applications in Formation Evaluation, J. Per. Tech. below transmitter-receiver section and on
(June 1963) 639-667; Trans., AIME 228. top of tool assembly (CCL or GR).
7. Walker, T.: A Full-Wave Display of Acoustic Signal
in Cased Holes, J. Pet. Tech. (Aug. 1968) 811-824. 2. Directional Holes
8. Pickett, G. R.: Prediction of Interzone Fluid Com- a. Use minimum of four centralizers (five if
munication Behind Casing by Use of Cement Bond
Log; Tram., SPWLA (1966). GR CBL is run).
9. Brown, H. D., Grijalva, V. E., and Raymer, L. L.: b. Preferably use rubber fin or rigid aluminum
New Developments in Sonic Wave Train Display and centraltirs.
Analysis in Cased Holes, The Log Analyst (Jan. -Feb. c. Locate centralizers immediately above and
1971 ) 27-40.
below transmitter-receiver section, on top
of tool and on top of sonic section. If GR
is run, fifth centralizer should be near cen-
I ter of GR sonde.

B. Obtain following well data.


1. Well name, location, serial number (if any).
n.. - ------ :-1../4:
2. ~atd Gti ~~lllc~t j~~($, 411&lL4Ulllg PJp~, vd-
urnes, time.
- 3. Scratcher and centralizer depths.
. . 4. Unique down-hole conditions (coated pipe,
DV, tools, inflatable packers on casing, etc.).
. . . 5. Casing data, including size, weight, grade, joint
type, depths.
6. Amular fluid data including type, weight, and
. .. .
salinity.
______ .
c. Obtain complete log headings on field prints.

D. Run VDL, MSG, Signature, or X-Y plot (accord-


ing to preference) on 200- to 1,200-psec time
scale.

I T E. Run overlap section (200-ft minimum) through


RESIN- SANOCOATEO I%AIN PIPE
interval of intermediate bond with and without
PIPE pressure. If microannulus exists, run log under
Fig. 8-CBL response in free casing. 1,000 psi.

616 JOURNAL OF PETROLEUM TECHNOLOGY


F. Set logging speed through intervals of interest D. Does repeat section repeat?
(pay zones and vicinity) at 1,800 ft/hr. Maxi-
mum logging speed above pays should not exceed E. Do intervals of known travel time check out with
3,600 ft/hr. approximate arrival time on VDL or Signature
log?
G, Run CBL up through cement top (if any).
P
r.
n---
JJcltx
-:--
plpc.
--:-.
drrlvm
-1 .: -
LUIIG Ill
:- 4?---
lICG
-:--
plpG
~----
d~14X
.-<*L
Wlul
General Checklist for Cement Bond Logs computed values?
A. Are all curves (amplitude, transit time, GR) cali-
brated before and after log run? G. Does overlap indicate microannulus? If so, was
entire log run under pressure?
B. Are all curves mechanically zeroed before and
after log run? H, Was log run to cement top? Note: Cement top
may not be present when there is a liner or when
C. Is 10J?heading comcdete? cement is circulated to the surface.
1. T%ol and ~anel bata.
2. Logging speed. I. If cement bond log was run above liner top, was
3. Sketch showing centralizing of tool and de- tool pulled out for appropriate centralizing?
scription of centralizers.
A. Calihratinn
. . .. . . . .. . .. ch=nth
..-= . . . h-fore
---- - and
--- after
---- @ C& T
. Wn.
., .. V~T
, -- nr Sicmat,lm= .V=
. -.~.--....- lnu .-..
rmn cm ?Of)-
.,- --v tn 1 2f)O-
-- -,---
brated in free pipe). psec time scale?- JTT
5. Cementing data.
Annular fluid data (type, weight, and salinity).
?: Pressure (if any) under which log was run.
8. Scratcher and centralizer depths. Original manuscript received in Society of Petroleum Enginaera
a n;.nn+~~-ol ~o+o office Aug. 6, 1973. Revised manuscript received Feb. 26, 1974.
Dl UGULLCU UCZLC!. Paper (SPE 4512) was presented at SPE-AIME 46th Annual Faii
16: Casing data. Meeting, held in Las Vegaa, Nev., Sept. 30-Ott. 3, 1973. @I Copy-
right 1974 American Institute of Mining, Metallurgical, and
11. Bottom-hole temperature. Petroleum Engineers, Inc.

JUNE, 1974 617

You might also like