PROJECT NAME: _________________________ ACTIVITY CARD REFERENCE: ______________________

Bid No.: ___________________________ Date of Inspection: ______________________

REINFORCING CHECKLIST FOR INSPECTION


REINFORCING STEEL INSPECTION

Plans used: Contract Drawing? Shop Drawing? Stamped Approved?: Date:

Drawings Numbers:

Type of Bar: ___________________________________________ Grade Specified:

Rebar Size per the


Manufacturer's Certification Supplied/Checked? YES NO YES NO
approved drawing:

Vertical Spacing
Horizontal Spacing Within Tolerance: YES NO YES NO
Within Tolerance:

Did you count every vertical bar ? YES NO Any missing? YES NO Corrected? Y N

Did you count every horizontal bar? YES NO Any missing? YES NO Corrected? Y N

Overlaps corrected? YES NO Overlap specified? Inches Diameters

Supporting system (Chairs or Blocks) correct? YES NO

Splices of proper Length and Location? YES NO Epoxy Coated: YES NO

Rebar Straight (not bent or kinked)? YES NO Clean and Tied: YES NO

Was rebar
Clearance from Forms/Ground as Specified? YES NO disturbed after YES NO
placement?

Dowels placed properly? YES NO Tied? YES NO

REMARKS:

CCPW QC 501
Rev 08/09