Professional Documents
Culture Documents
Building Permit
Building Permit
The permit shall expire and becomes null and void if the building or
work
authorized therein is not commenced within a period of 1 year from
the date
of such permit, or if the building or work so authorized is suspended
or
abandoned at any time after it has been commenced, for a period of
120
days.
Note:
1. All Application Forms, plans, specification, design and
computation, bill of materials should be sign and sealed by duly
licensed CE, ARCH, SE, PEE, Master plumber, master
Electrician.