PONDASI

STRAUSS PILE

Tanggal :
Hal :

A. Umum

1. Proyek : 7. Data Elevasi :


2. Area : Muka Tanah :
3. Location : Detail Elevasi :
4. No. Gambar : h1 :
5. Pile No. : h2 :
6. Diameter : h3 :

ACCEPTED
Description Remarks
Date Signature
B. Pengeboran

1. Persiapan Top of Casing


2. Kedalaman Rencana GL
3. Diameter Galian
4. Install alat ( 6 m )
PCO
C. Penulangan

h1
1. Tulangan Vertikal 6D13
2. Lap Splacing min 40D h2 h3
4. Sengkang Spiral Dia.8 @50

D. Pengecoran

1. Pipa Tremi
2. Mutu Beton K300
3. Vibrator

E. Catatan

Print Name PT. BARATA INDONESIA PT. WIRATMAN PERUM JASA TIRTA I

Signature

Date