PTC 02-1601 Progress Report No 37
PTC 02-1601 Progress Report No 37
KERETA BASEMEN DI ATAS LOT 403 & 728 SEKSYEN 3, DAERAH TIMUR LAUT,
JALAN BATU GANTONG, PULAU PINANG
UNTUK
TETUAN PENANG TURF CLUB
TABLE OF CONTENT
No Title
1
PROJECT PTC02 - 1601
2
PROJECT PTC02 - 1601
Consultant
1) Akitek Neoh (Architect)
2) Perunding MWR Sdn.
Bhd.
(C&S and M&E)
3) QS Konsultant (QS)
3
PROJECT PTC02 - 1601
BOARD OF DIRECTOR
Executive Director
Mr Happy Ng
+6012-4891193
Project QS
happy@plbgroup.com.my
Ms Norsiah Saari
------------------------ +6019-5603422
Headquarter Office norsiah@plbgroup.com.my
----------------------------------------------------------------------------------------------------------------
Site
Project Manager
Planner
habibudin@gmail.com jjasonooi@yahoo.com
Site Engineer
4
PROJECT PTC02 - 1601
Pile Cap
Area Total (No.) Completed (No.) Progress (%)
Zone A 30 26 87
Zone B 23 23 100
Zone C 45 45 100
Basement Beam
Area Sub Area Current Status Progress (%)
Zone A Zone A Completed 100
Zone B Zone B Completed 100
Zone C Zone C1A Completed 100
Zone C1B Completed 100
Basement Slab
Area Sub Area Current Status Progress (%)
Zone A Zone A Completed 100
Zone B Zone B Completed 100
Zone C1A Completed 100
Zone C Zone C1B Completed 100
5
PROJECT PTC02 - 1601
DYNAMIC VENUE
(18/09/2017 –1/10/2017)
Item Description/Trade SEPTEMBER OCT
18 19 20 21 22 23 24 25 26 27 28 29 30 1
1.0 MANPOWER
REQUIREMENTS:
1 Project Head/Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2 Operator 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Welder 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4 Bar bender 0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 General Worker 3 3 3 3 3 0 0 0 3 3 0 0 3 0
6 Carpenter 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL REQUIRED 3 3 3 3 3 0 0 0 3 3 3 3 3 0
MANPOWER:
6
PROJECT PTC02 - 1601
18 19 20 21 22 23 24 25 26 27 28 29 30 1
1.0 MANPOWER
REQUIREMENTS:
1 Project Head/Supervisor 4 4 3 4 - 3 0 4 4 3 4 4 4 0
2 Operator 1 1 1 1 - 1 0 1 1 1 1 1 1 0
3 Welder 0 0 0 0 - 0 0 0 0 0 0 0 0 0
4 Bar bender 8 8 8 8 - 8 0 8 8 8 8 8 8 0
5 Concreter 0 0 0 0 - 0 0 0 0 7 7 7 0 0
6 Carpenter 35 33 35 35 - 28 0 33 35 33 23 23 30 0
TOTAL REQUIRED 48 46 47 47 - 40 0 46 47 52 42 42 41 0
MANPOWER:
2.0 PLANT &
MACHINERIES
REQUIREMENTS:
1 Crawler Crane 1 1 1 1 1 0 0 1 1 1 1 1 1 0
2 Bore Pile Rigs 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 Excavator 0 0 0 0 1 0 0 0 0 0 0 0 0 0
4 Vibrator Poker 0 0 2 1 1 0 0 2 2 1 1 1 1 0
5 Bending machine 2 2 2 2 2 0 0 0 2 2 1 1 1 0
6 Bar Cutter 2 2 2 2 2 0 0 0 2 3 1 1 0 0
7 Water Pumping 2 0 0 0 0 0 0 1 0 0 1 1 0 0
8 Generator Set 0 0 2 2 2 0 0 2 1 2 3 3 2 0
TOTAL REQUIRED 7 5 10 8 9 0 0 6 8 9 8 8 5 0
PLANT &
MACHINERIES:
7
PROJECT PTC02 - 1601
8
PROJECT PTC02 - 1601
9
PROJECT PTC02 - 1601
10
PROJECT PTC02 - 1601
11
PROJECT PTC02 - 1601
12
PROJECT PTC02 - 1601
13