REPORT No. 13
NSRP 3rd RT
UPDATED: 4-Jan-2018
Page 1 of 2
by NSRP and JGCS
Summary
Accept 23 Severe repair total 523
100% line: Severe defect 29 Severe repaired 5 (RT done)
100% line: Minor defect 18 Minor repair total 18
10% line: Severe defect 494 Minor repaired 0
10% line: Minor defect 414
Reviewed total 978
NSRP JGCS Final Interpretation Inspection type Severe Defect Criteria Repair status Piping component PWHT
Interpretation Interpretation by NSRP and JGCS