You are on page 1of 2

1

POWER HOUSE Doc.REF.NO: PH-IMS-SP10-FR01


REV/ISSUE: 02/01

NON CONFIRMITY DATE : 07/02/2016

REPORT Pages :2

1-Identification:
Originator Name: Alaa Sobh Moawad Date: 30/1/2017 Code: 149
Supplier: PR.NO: NCR NO.: (19) GR
W.O NO: ( Requested ) Part Description: Perkins
Part NO: Drawing NO/SAMPLE:
Quantity:
Found in What Activity? 1. Incoming
2. In- Process Inspection
3. Final Inspection
4. Other

2- Description of non-conformity

When inspect the generator code 149 visually we found that:


1. No coolant on radiator.
2. The cap of radiator is missing.
3. The belts of fan of radiator are missing.
4. The return fuel hose is broken.
5. The muffler is disconnected.
6. The main air filter is missing.
7. No batteries.
8. The wiring of alternator is disconnected.
9. The lock of control box is damaged.
10. The support of module box is pending.
11. The vibrations of generator are out of acceptance limits according to last report that sent.

3- Recommended Action:

Name: Designation: Signature:

Page 1 of 2
2

Disposition: Date:

 Use as is  Return to Supplier


 Repair  Reject
 Rework  Request Concession
 Other
Name: Designation: Signature:

4- Correction Action

Responsible manager Responsible Sector Manager

Signature &Date Signature &Date

5- Approval of correction

QC manager Signature &Date

17- Closing of non-conformity

NON CONFORMANCE CLOSURE:


Planned disposition is accepted, and has been completed as required. Corrective and preventative has been initiated and
changes/recommendations implemented.

Name; Designation: Signature:

Page 2 of 2

You might also like