Checklist Cooling Tower

The document provides a checklist for inspecting a closed cooling system for a customer. It includes data about the system such as the volume, recirculation rate, and operating hours. Water quality parameters are monitored, including conductivity, pH, hardness, alkalinity, and chemicals present. Operating supplies used include water sources, chemicals dosed, and their costs. The checklist captures essential information needed to evaluate the system's performance and water treatment needs.

Uploaded by

Afraz Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Checklist Cooling Tower

The document provides a checklist for inspecting a closed cooling system for a customer. It includes data about the system such as the volume, recirculation rate, and operating hours. Water quality parameters are monitored, including conductivity, pH, hardness, alkalinity, and chemicals present. Operating supplies used include water sources, chemicals dosed, and their costs. The checklist captures essential information needed to evaluate the system's performance and water treatment needs.

Uploaded by

Afraz Shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Operating Supplies Cost: Details the cost of the various operating supplies needed for maintaining the cooling system, with sections for unit costs and total expenses.
  • System Data: Contains data fields for inputting system parameters such as recirculation, operating hours, and construction materials crucial for system setup.
  • Make Up and System Water Analysis: Analyzes system water properties including conductivity, pH, and alkalinity to ensure optimal operation standards.

Closed Cooling System Check List

CUSTOMER : Taken by:

SYSTEM : Date:

S Y S T E M D A T A - for average cooling tower load


Package F=25,819 L ,Package H=71,209.71 L
System volume m3

Recirculation m3/h
Delta T=9 °C
Delta T (inlet & outlet) °C PPPP

Operating hours h/a Operating hours/day Operating days/year

Construction materials tick off C-steel

Water lost m3/h

Make up m3/h
MAKE UP and SYSTEM WATER ANALYSIS
unit MAKE UP SYSTEM WATER
<3000
Conductivity µS/cm
8.5 TO 10.5
pH -Value

Water Temp. Maximum °C

Total Hardness ppm


<100
Ca -Hardness ppm
<250
Alkalinity (m-Value) ppm
<150
Chloride Cl ppm

Phosphate PO4 ppm

Sulfate SO4 ppm

OPERATING SUPPLIES
water supply mixing rate COST value

soft / decarbon. / demi % content /m3

well water / tap water % content /m3

waste water/blow down /m3


applied chemicals dosage value COST value

Product ppm /kg

Product ppm /kg

Biocid ppm /kg

ppm /kg

Acid ppm /kg


Bold and Italics printed data is absolut necessary for complete calculation model !

Closed Cooling System Check List 
CUSTOMER  
: 
Taken  by: 
 
SYSTEM  
: 
Date: 
S Y S T E M D A T A -  for avera