Professional Documents
Culture Documents
Guard Stone (Top 0.7 chisel dressed and 0.50m Rupees One Hundred and
1 1500 Nos bottom roughtly dressed ) 0.23 X 0.23 X 1.20 m 200 Each 300000
Twenty Nine Only
Material survey for Road and bridge works and Rupees Six Thousand and
4 15 preparation of rate analysis for road work, minor 7000 Each 105000
Twenty Five Only
bridges, junction improvements and CD works
Signature of Consultant
Rates In Rs
[ RUPEES FOURTEEN LAKHS SEVENTY THOUSAND ONE HUNDRED ANDEIGHTY SIX ONLY] 1470186
(Sd) ………………….
Divisional Engineer (H).
C &M Theni Division,
Theni
/ True Copy /
Senior Draughting Officer (H)
Signature of Consultant
Senior Draughting Officer (H)
Signature of Consultant
Rates In Rs
Sl.No Probable Specif Unit in Amount in
Description of Work
Quantity cation Words Rs
Words Figures
Design of pavement composition based on Rupees Four Thousand
6 10.60 Kms kilometre wise field data As per IRC codes Nine Hundred and Ninety 4995 Km 74925
Five Only
Traffic Study and Design of junction improvements
(SH - crossings alignment starting and ending point Rupees Nineteen Thousand
7 3 Nos @ SH and Union Roads) Nine Hundred and Fifty 19950 Each 79800
Only
Design of Minor CD words drains and Retaining walls
1853544
1.090845 109.0845
100 -9.08452
36
-154362.4
33333.33