Item nr List of materials Units Quantity

1 Culverts - 6 x 0.6m diameter m 100.0


2 Rock Fill for semi-permantant road m3 250.0
3 Cofferdam A - fill and construction m3 60
4 Cofferdam A - removal m3 60
5 Flow diversion no 2
6 Cofferdam B - fill and construction m3 80
7 Cofferdam B - removal m3 80
8 Rockfill under permanent structure m3 470.0

9 Inlet structure for 2 no 0.6m dia. pipes no 2


10 Outlet structure for 2 no 0.6m dia. pipes no 2
Note : Quantities for low
11 Armor flex m2 500 water bridge at km3.63
and approach slabs are
12 Concrete for cut-off wall m3 60 measured seperately.