2 Rock Fill for semi-permantant road m3 250.0 3 Cofferdam A - fill and construction m3 60 4 Cofferdam A - removal m3 60 5 Flow diversion no 2 6 Cofferdam B - fill and construction m3 80 7 Cofferdam B - removal m3 80 8 Rockfill under permanent structure m3 470.0
9 Inlet structure for 2 no 0.6m dia. pipes no 2
10 Outlet structure for 2 no 0.6m dia. pipes no 2 Note : Quantities for low 11 Armor flex m2 500 water bridge at km3.63 and approach slabs are 12 Concrete for cut-off wall m3 60 measured seperately.